On November 8, 1996. the import contract signing ceremony on the two 660 MW coal-fired generating units of Hanfeng Thermal Power Plant 1st phase was held in the Great Hall of People, Beijing.
文摘On November 8, 1996. the import contract signing ceremony on the two 660 MW coal-fired generating units of Hanfeng Thermal Power Plant 1st phase was held in the Great Hall of People, Beijing.