To solve the problem of advanced digital manufacturing technology in the practical application, a knowledge engineering technology was introduced into the computer numerical control(CNC) programming. The knowledge acq...To solve the problem of advanced digital manufacturing technology in the practical application, a knowledge engineering technology was introduced into the computer numerical control(CNC) programming. The knowledge acquisition, knowledge representation and reasoning used in CNC programming were researched. The CNC programming system functional architecture of impeller parts based on knowledge based engineering(KBE) was constructed. The structural model of the general knowledge-based system(KBS) was also constructed. The KBS of CNC programming system was established through synthesizing database technology and knowledge base theory. And in the context of corporate needs, based on the knowledge-driven manufacturing platform(i.e. UG CAD/CAM), VC++6.0 and UG/Open, the KBS and UG CAD/CAM were integrated seamlessly and the intelligent CNC programming KBE system for the impeller parts was developed by integrating KBE and UG CAD/CAM system. A method to establish standard process templates was proposed, so as to develop the intelligent CNC programming system in which CNC machining process and process parameters were standardized by using this KBE system. For the impeller parts processing, the method applied in the development of the prototype system is proven to be viable, feasible and practical.展开更多
The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial ...The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial DoF brought by multiple servable tracking and data relay satellites(TDRSs).In this paper,ageneralized multiple time windows(GMTW)model is proposed to fully exploit the time and spatial DoF.Then,the improvements of service capability and job-completion probability based on the GMTW are theoretically proved.Further,an asymmetric path-relinking(APR)based heuristic job scheduling framework is presented to maximize the usage of DoF provided by the GMTW.Simulation results show that by using our proposal 11%improvement of average jobcompletion probability can be obtained.Meanwhile,the computing time of the time-to-target can be shorten to 1/9 of the GRASP.展开更多
基金Project(12ZT14)supported by the Natural Science Foundation of Shanghai Municipal Education Commission,China
文摘To solve the problem of advanced digital manufacturing technology in the practical application, a knowledge engineering technology was introduced into the computer numerical control(CNC) programming. The knowledge acquisition, knowledge representation and reasoning used in CNC programming were researched. The CNC programming system functional architecture of impeller parts based on knowledge based engineering(KBE) was constructed. The structural model of the general knowledge-based system(KBS) was also constructed. The KBS of CNC programming system was established through synthesizing database technology and knowledge base theory. And in the context of corporate needs, based on the knowledge-driven manufacturing platform(i.e. UG CAD/CAM), VC++6.0 and UG/Open, the KBS and UG CAD/CAM were integrated seamlessly and the intelligent CNC programming KBE system for the impeller parts was developed by integrating KBE and UG CAD/CAM system. A method to establish standard process templates was proposed, so as to develop the intelligent CNC programming system in which CNC machining process and process parameters were standardized by using this KBE system. For the impeller parts processing, the method applied in the development of the prototype system is proven to be viable, feasible and practical.
基金Supported by the National Natural Science Foundation of China(91338101,91338108,61132002,6132106)Research Fund of Tsinghua University(2011Z05117)Co-innovation Laboratory of Aerospace Broadband Network Technology
文摘The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial DoF brought by multiple servable tracking and data relay satellites(TDRSs).In this paper,ageneralized multiple time windows(GMTW)model is proposed to fully exploit the time and spatial DoF.Then,the improvements of service capability and job-completion probability based on the GMTW are theoretically proved.Further,an asymmetric path-relinking(APR)based heuristic job scheduling framework is presented to maximize the usage of DoF provided by the GMTW.Simulation results show that by using our proposal 11%improvement of average jobcompletion probability can be obtained.Meanwhile,the computing time of the time-to-target can be shorten to 1/9 of the GRASP.