Construction Schedule of Generating Units Actually Realized in 1996 (as of Aug. 8,1996) 被引量:2
1
《Electricity》 1996年第4期53-53,共1页
关键词 as of Aug Construction Schedule of generating units Actually Realized in 1996
下载PDF
Construction Schedule of Generating Units to be Commissioned in 1998 (as of Dec 11, 1998)
2
《Electricity》 1999年第2期50-50,共1页
关键词 as of Dec 11 Construction Schedule of generating units to be Commissioned in 1998
下载PDF
8 large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
3
《Electricity》 1997年第2期51-52,共2页
关键词 GRID large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
下载PDF
Speed up the Retrofit of Thermal Power Generating Units, Raise the Effectiveness of Power Plant Comprehensively
4
作者 Jiang Zhesheng 《Electricity》 2000年第1期13-16,共4页
关键词 Speed up the Retrofit of Thermal Power generating units Raise the Effectiveness of Power Plant Comprehensively
下载PDF
ZIZ-2 Vibration monitoring and diagnosing system for turbine generator units
5
《Electricity》 1996年第1期53-53,共1页
ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and ... ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc; 展开更多
关键词 LINE ZIZ-2 Vibration monitoring and diagnosing system for turbine generator units
下载PDF
An Analysis of Zhabei Cas Turbine Project and the Development of Cas Turbine Generating Unit
6
《Electricity》 1997年第4期21-23,共3页
关键词 PROJECT An Analysis of Zhabei Cas Turbine Project and the Development of Cas Turbine generating Unit
下载PDF
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
7
《Electricity》 2000年第3期45-45,共1页
关键词 The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
下载PDF
Research and Demonstration of Direct Air-Cooling System for 600-MW Fossil-Fired Power Plants
8
作者 Zhang Xiaolu 1 , Wang Jianping 2 , Hu Zhenling 3 1. China Power Investment Corporation 2. China Power Engineering Consulting Group Corporation 3. Harbin Air Conditioning Co., Ltd., 《Electricity》 2011年第4期46-51,共6页
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t... Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China. 展开更多
关键词 thermal power generating unit air-cooling direct air-cooling project demonstration
下载PDF
Transitional Revenue Scheme for High-cost Generator Unit in Guangdong Electricity Market Based on Government Authorized Contracts
9
作者 Jisong Zhu Baike Chen +1 位作者 Tianyao Ji Zhaoxia Jing 《CSEE Journal of Power and Energy Systems》 SCIE EI CSCD 2024年第1期208-221,共14页
High-cost generator units are at a cost disadvantage in electricity spot markets.This study focuses on revenue mechanisms of gas-fired units affected by power market reform in Guangdong province,China.For the first ti... High-cost generator units are at a cost disadvantage in electricity spot markets.This study focuses on revenue mechanisms of gas-fired units affected by power market reform in Guangdong province,China.For the first time,we compare impacts on market indicators of five settlement mechanisms:feed-in tariff(FiT),location marginal price(LMP),contract for difference(CFD),direct subsidy(DS),and estimated revenue method(ERM).In particular,we design key parameters,including authorized CFD and ERM of two kinds of government authorized contracts based on traditional dispatching patterns to avoid significant profit fluctuations brought by market reforms.We also analyze impact of factors such as climbing performance,seasonal load,and subsidy amount on the overall market and its players.Results of a case study show to directly subsidize gasfired units will lead higher-cost units to generate more electricity,with a resulting loss of social welfare.Disruption of market prices and provision of unreasonable incentives are fatal disadvantages of this subsidy method.The government and policymakers should consider financial means to adjust benefits to reduce production costs and increase social welfare.Also,by case analysis,the ERM shows its stable performance in revenue of high-cost units,while we find that authorized CFD is not applicable for gas-fired units whose output is unstable as a marginal unit frequently.Therefore,we suggest government agencies adopt ERM to sign contracts with gas-fired units,to attain a balance between fairness and efficiency. 展开更多
关键词 Guangdong electricity market high-cost generator unit settlement mechanism SUBSIDY
原文传递
Short-term reliability evaluation for power stations by using Lz-transform 被引量:7
10
作者 Anatoly LISNIANSKI Hanoch BENHAIM 《Journal of Modern Power Systems and Clean Energy》 SCIE EI 2013年第2期110-117,共8页
A short-term reliability evaluation is used for power stations,where each power generating unit is presented by a multi-state Markov model.The main obstacle for reliability evaluation in such a case is a“curse of dim... A short-term reliability evaluation is used for power stations,where each power generating unit is presented by a multi-state Markov model.The main obstacle for reliability evaluation in such a case is a“curse of dimensionality”—a great(huge)number of states of entire power station that should be analyzed.A modern approach is proposed based on using Lz-transform that drastically simplifies computation.The proposed approach is useful for power system security analysis and short-term operating decisions.In order to illustrate the proposed approach,the short-term reliability evaluation for a power station with different coal fired generating units is presented. 展开更多
关键词 Power system generating unit generating capacity Multi-State Markov model Lz-transform Universal generating function
原文传递
Availability growth models and verification of power equipment
11
作者 Jinyuan SHI Jiamin XU 《Frontiers in Energy》 SCIE CSCD 2021年第2期529-538,共10页
The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The cal... The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The calculation formulas for the maintenance coefficient, mathematical expressions for general availability growth models, ways for estimating, and fitting on checking the parameters of the model are introduced. Availability growth models for electric generating units, power station auxiliaries, and transmission and distribution installations are given together with verification examples for availability growth models of 320–1000 MW nuclear power units and 1000 MW thermal power units, 200–1000 MW power station auxiliaries, and 220–500 kV transmission and distribution installations. The verification results for operation availability data show that the maintenance coefficients for electric generating units, power station auxiliaries, transmission and distribution installations conform to the power function, and general availability growth models conform to rules of availability growth tendency of power equipment. 展开更多
关键词 repairable system power equipment electric generating unit power station auxiliary transmission and distribution installation RELIABILITY AVAILABILITY availability growth model