ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and ...ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc;展开更多
High-cost generator units are at a cost disadvantage in electricity spot markets.This study focuses on revenue mechanisms of gas-fired units affected by power market reform in Guangdong province,China.For the first ti...High-cost generator units are at a cost disadvantage in electricity spot markets.This study focuses on revenue mechanisms of gas-fired units affected by power market reform in Guangdong province,China.For the first time,we compare impacts on market indicators of five settlement mechanisms:feed-in tariff(FiT),location marginal price(LMP),contract for difference(CFD),direct subsidy(DS),and estimated revenue method(ERM).In particular,we design key parameters,including authorized CFD and ERM of two kinds of government authorized contracts based on traditional dispatching patterns to avoid significant profit fluctuations brought by market reforms.We also analyze impact of factors such as climbing performance,seasonal load,and subsidy amount on the overall market and its players.Results of a case study show to directly subsidize gasfired units will lead higher-cost units to generate more electricity,with a resulting loss of social welfare.Disruption of market prices and provision of unreasonable incentives are fatal disadvantages of this subsidy method.The government and policymakers should consider financial means to adjust benefits to reduce production costs and increase social welfare.Also,by case analysis,the ERM shows its stable performance in revenue of high-cost units,while we find that authorized CFD is not applicable for gas-fired units whose output is unstable as a marginal unit frequently.Therefore,we suggest government agencies adopt ERM to sign contracts with gas-fired units,to attain a balance between fairness and efficiency.展开更多
The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS ...The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS not complying with the contract target, etc. occurred during start-up and debugging of two 600 MW generating units in Yangzhou No.2 Thermal Power Plant. Through analysis on these problems. the remedial measures were put forward, to which can be referred for similar units.展开更多
GAs are general purpose optimization techniques based on principles inspired from the biological evolution using metaphors of mechanisms, such as natural selection, genetic recombination and survival of the fittest. B...GAs are general purpose optimization techniques based on principles inspired from the biological evolution using metaphors of mechanisms, such as natural selection, genetic recombination and survival of the fittest. By use of coding betterment, the dynamic changes of the mutation rate and the crossover probability, the dynamic choice of subsistence, the reservation of the optimal fitness value, a modified genetic algorithm for optimizing combination of units in thermal power plants is proposed. And through taking examples, test result are analyzed and compared with results of some different algorithms. Numerical results show available value for the unit commitment problem with examples.展开更多
The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters...The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational.展开更多
This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or abov...This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or above thermal generating units,40-MW or above hydro generating units,and all nuclear generating units.The reliability indices embodied include utilization hours,times and hours of scheduled outages,times and hours of unscheduled outages,equivalent forced outage rate and equivalent availability factor.展开更多
A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating c...A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.展开更多
The introduction of FRS (financial reporting standards) 136 to Malaysian PLC's (public limited company) in 2006 indirectly formalized accounting for purchased goodwill for the first time. Based on a sample of 200...The introduction of FRS (financial reporting standards) 136 to Malaysian PLC's (public limited company) in 2006 indirectly formalized accounting for purchased goodwill for the first time. Based on a sample of 2006 annual reports of 10 Main Board companies from plantation sector, the study finds the level of desired disclosure has yet to be met. Whilst the intention of the standard is noble, actual practice for first time reporting entities indicate that Malaysian PLC's and their auditors have far to go before they can meet the expectation set by FRS 136 in particular and International Financial Reporting Standards in general.展开更多
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t...Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China.展开更多
A short-term reliability evaluation is used for power stations,where each power generating unit is presented by a multi-state Markov model.The main obstacle for reliability evaluation in such a case is a“curse of dim...A short-term reliability evaluation is used for power stations,where each power generating unit is presented by a multi-state Markov model.The main obstacle for reliability evaluation in such a case is a“curse of dimensionality”—a great(huge)number of states of entire power station that should be analyzed.A modern approach is proposed based on using Lz-transform that drastically simplifies computation.The proposed approach is useful for power system security analysis and short-term operating decisions.In order to illustrate the proposed approach,the short-term reliability evaluation for a power station with different coal fired generating units is presented.展开更多
The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The cal...The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The calculation formulas for the maintenance coefficient, mathematical expressions for general availability growth models, ways for estimating, and fitting on checking the parameters of the model are introduced. Availability growth models for electric generating units, power station auxiliaries, and transmission and distribution installations are given together with verification examples for availability growth models of 320–1000 MW nuclear power units and 1000 MW thermal power units, 200–1000 MW power station auxiliaries, and 220–500 kV transmission and distribution installations. The verification results for operation availability data show that the maintenance coefficients for electric generating units, power station auxiliaries, transmission and distribution installations conform to the power function, and general availability growth models conform to rules of availability growth tendency of power equipment.展开更多
文摘ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc;
文摘High-cost generator units are at a cost disadvantage in electricity spot markets.This study focuses on revenue mechanisms of gas-fired units affected by power market reform in Guangdong province,China.For the first time,we compare impacts on market indicators of five settlement mechanisms:feed-in tariff(FiT),location marginal price(LMP),contract for difference(CFD),direct subsidy(DS),and estimated revenue method(ERM).In particular,we design key parameters,including authorized CFD and ERM of two kinds of government authorized contracts based on traditional dispatching patterns to avoid significant profit fluctuations brought by market reforms.We also analyze impact of factors such as climbing performance,seasonal load,and subsidy amount on the overall market and its players.Results of a case study show to directly subsidize gasfired units will lead higher-cost units to generate more electricity,with a resulting loss of social welfare.Disruption of market prices and provision of unreasonable incentives are fatal disadvantages of this subsidy method.The government and policymakers should consider financial means to adjust benefits to reduce production costs and increase social welfare.Also,by case analysis,the ERM shows its stable performance in revenue of high-cost units,while we find that authorized CFD is not applicable for gas-fired units whose output is unstable as a marginal unit frequently.Therefore,we suggest government agencies adopt ERM to sign contracts with gas-fired units,to attain a balance between fairness and efficiency.
文摘The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS not complying with the contract target, etc. occurred during start-up and debugging of two 600 MW generating units in Yangzhou No.2 Thermal Power Plant. Through analysis on these problems. the remedial measures were put forward, to which can be referred for similar units.
基金Supported by the Natural Science Foundation of Hubei Province (2006ABA222)
文摘GAs are general purpose optimization techniques based on principles inspired from the biological evolution using metaphors of mechanisms, such as natural selection, genetic recombination and survival of the fittest. By use of coding betterment, the dynamic changes of the mutation rate and the crossover probability, the dynamic choice of subsistence, the reservation of the optimal fitness value, a modified genetic algorithm for optimizing combination of units in thermal power plants is proposed. And through taking examples, test result are analyzed and compared with results of some different algorithms. Numerical results show available value for the unit commitment problem with examples.
文摘The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational.
文摘This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or above thermal generating units,40-MW or above hydro generating units,and all nuclear generating units.The reliability indices embodied include utilization hours,times and hours of scheduled outages,times and hours of unscheduled outages,equivalent forced outage rate and equivalent availability factor.
基金The National High Technology Research and Development Program of China(863Program)(No.2005AA505101-621)Important Science and Technology Research Project of Shanghai(No.041612012)
文摘A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.
文摘The introduction of FRS (financial reporting standards) 136 to Malaysian PLC's (public limited company) in 2006 indirectly formalized accounting for purchased goodwill for the first time. Based on a sample of 2006 annual reports of 10 Main Board companies from plantation sector, the study finds the level of desired disclosure has yet to be met. Whilst the intention of the standard is noble, actual practice for first time reporting entities indicate that Malaysian PLC's and their auditors have far to go before they can meet the expectation set by FRS 136 in particular and International Financial Reporting Standards in general.
文摘Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China.
文摘A short-term reliability evaluation is used for power stations,where each power generating unit is presented by a multi-state Markov model.The main obstacle for reliability evaluation in such a case is a“curse of dimensionality”—a great(huge)number of states of entire power station that should be analyzed.A modern approach is proposed based on using Lz-transform that drastically simplifies computation.The proposed approach is useful for power system security analysis and short-term operating decisions.In order to illustrate the proposed approach,the short-term reliability evaluation for a power station with different coal fired generating units is presented.
文摘The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The calculation formulas for the maintenance coefficient, mathematical expressions for general availability growth models, ways for estimating, and fitting on checking the parameters of the model are introduced. Availability growth models for electric generating units, power station auxiliaries, and transmission and distribution installations are given together with verification examples for availability growth models of 320–1000 MW nuclear power units and 1000 MW thermal power units, 200–1000 MW power station auxiliaries, and 220–500 kV transmission and distribution installations. The verification results for operation availability data show that the maintenance coefficients for electric generating units, power station auxiliaries, transmission and distribution installations conform to the power function, and general availability growth models conform to rules of availability growth tendency of power equipment.