The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic st...The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic stability and seismic activity,stability of reservoir bank and reservoir-induced earthquake.Meanwhile,the above mentioned engineering geological problems are evaluated according to the preliminary test results since TGP operation and impoundment in 2003.展开更多
The geological features of three types of tropical volcanic rock and soil distributed along Jakarta-Bandung high-speed railway(HSR),including pozzolanic clayey soil,mud shale and deep soft soil,are studied through fie...The geological features of three types of tropical volcanic rock and soil distributed along Jakarta-Bandung high-speed railway(HSR),including pozzolanic clayey soil,mud shale and deep soft soil,are studied through field and laboratory tests.The paper analyzes the mechanism and causes of engineering geological problems caused by tropical volcanic rock and soil and puts forward measures to control subgrade slope instability by rationally determining project type,making side slope stability control and strengthening waterproofing and drainage.The“zero front slope”tunneling technology at the portal,the simplified excavation method of double-side wall heading and the cross brace construction method of arch protection within the semi-open cut row pile frame in the“mountainside”eccentrically loaded soft soil stratum are adopted to control the instability of tunnel side and front slopes,foundation pits and working faces;CFG or pipe piles shall be used to reinforce soft and expansive foundation or replacement measures shall be taken,and the scheme of blind ditch+double-layer water sealing in ballastless track section shall be put forward to prevent arching deformation of foundation;the treatment measures of CFG pile,pipe pile and vacuum combined piled preloading are adopted to improve the bearing capacity of foundation in deep soft soil section and solve the problems of settlement control and uneven settlement.These engineering countermeasures have been applied during the construction of Jakarta-Bandung HSR and achieved good results.展开更多
This paper summarizes the negative effects on geological environment caused by groundwater exploitation and its distribution. There are seven main types of the geological environment negative effects, which are genera...This paper summarizes the negative effects on geological environment caused by groundwater exploitation and its distribution. There are seven main types of the geological environment negative effects, which are generally as follows:(1) Constant decrease of groundwater level is mainly distributed in China(East Asia), India(South Asia), Tajikistan(Central Asia) and Saudi Arabia(West Asia);(2) land subsidence occurs mainly in eastern plains of East Asia and west Siberian Plain of North Asia;(3) seawater intrusion occurs mainly in China, Japan and South Korea in East Asia, Philippines and Indonesia in Southeast Asia, the Indian coastal areas in South Asia;(4) groundwater level decline caused by groundwater exploitation in oil fields;(5) mining collapse is mainly in 50° to 70° north latitude band;(6) the total area of karst collapse in China of East Asia is as much as 197.05 km^2; and(7) ground fracture is mainly distributed in the North China Plain, Fenwei Plain and the Yangtze River Delta. Asia can be divided into 6 zones in terms of the geological environment negative effect caused by groundwater exploitation. According to analysis, with the increasing intensity of human activities, geological environment issues become more and more serious, therefore it is vital to control the human activities within the scope of 5× 10~5 people/km^2 to 9.9× 10~5 people/km^2 for the effective control of the size of the affected area by geological environment problems.展开更多
文摘The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic stability and seismic activity,stability of reservoir bank and reservoir-induced earthquake.Meanwhile,the above mentioned engineering geological problems are evaluated according to the preliminary test results since TGP operation and impoundment in 2003.
文摘The geological features of three types of tropical volcanic rock and soil distributed along Jakarta-Bandung high-speed railway(HSR),including pozzolanic clayey soil,mud shale and deep soft soil,are studied through field and laboratory tests.The paper analyzes the mechanism and causes of engineering geological problems caused by tropical volcanic rock and soil and puts forward measures to control subgrade slope instability by rationally determining project type,making side slope stability control and strengthening waterproofing and drainage.The“zero front slope”tunneling technology at the portal,the simplified excavation method of double-side wall heading and the cross brace construction method of arch protection within the semi-open cut row pile frame in the“mountainside”eccentrically loaded soft soil stratum are adopted to control the instability of tunnel side and front slopes,foundation pits and working faces;CFG or pipe piles shall be used to reinforce soft and expansive foundation or replacement measures shall be taken,and the scheme of blind ditch+double-layer water sealing in ballastless track section shall be put forward to prevent arching deformation of foundation;the treatment measures of CFG pile,pipe pile and vacuum combined piled preloading are adopted to improve the bearing capacity of foundation in deep soft soil section and solve the problems of settlement control and uneven settlement.These engineering countermeasures have been applied during the construction of Jakarta-Bandung HSR and achieved good results.
基金supported by Geological Map of Groundwater Resources and Environment of China and Surrounding Areas(12120113014200)Series Maps of Karst Environment Geology of China and South East Asia(12120114006401,12120114006301)
文摘This paper summarizes the negative effects on geological environment caused by groundwater exploitation and its distribution. There are seven main types of the geological environment negative effects, which are generally as follows:(1) Constant decrease of groundwater level is mainly distributed in China(East Asia), India(South Asia), Tajikistan(Central Asia) and Saudi Arabia(West Asia);(2) land subsidence occurs mainly in eastern plains of East Asia and west Siberian Plain of North Asia;(3) seawater intrusion occurs mainly in China, Japan and South Korea in East Asia, Philippines and Indonesia in Southeast Asia, the Indian coastal areas in South Asia;(4) groundwater level decline caused by groundwater exploitation in oil fields;(5) mining collapse is mainly in 50° to 70° north latitude band;(6) the total area of karst collapse in China of East Asia is as much as 197.05 km^2; and(7) ground fracture is mainly distributed in the North China Plain, Fenwei Plain and the Yangtze River Delta. Asia can be divided into 6 zones in terms of the geological environment negative effect caused by groundwater exploitation. According to analysis, with the increasing intensity of human activities, geological environment issues become more and more serious, therefore it is vital to control the human activities within the scope of 5× 10~5 people/km^2 to 9.9× 10~5 people/km^2 for the effective control of the size of the affected area by geological environment problems.