It is of crucial importance to investigate the spatial structures of ancient landslides in the eastern Tibetan Plateau’s alpine canyons as they could provide valuable insights into the evolutionary history of the lan...It is of crucial importance to investigate the spatial structures of ancient landslides in the eastern Tibetan Plateau’s alpine canyons as they could provide valuable insights into the evolutionary history of the landslides and indicate the potential for future reactivation.This study examines the Deda ancient landslide,situated in the Chalong-ranbu fault zone,where creep deformation suggests a complex underground structure.By integrating remote sensing,field surveys,Audio-frequency Magnetotellurics(AMT),and Microtremor Survey Method(MSM)techniques,along with engineering geological drilling for validation,to uncover the landslide’s spatial feature s.The research indicates that a fault is developed in the upper part of the Deda ancient landslide,and the gully divides it into Deda landslide accumulation zoneⅠand Deda landslide accumulation zoneⅡin space.The distinctive geological characteristics detectable by MSM in the shallow subsurface and by AMT in deeper layers.The findings include the identification of two sliding zones in the Deda I landslide,the shallow sliding zone(DD-I-S1)depth is approximately 20 m,and the deep sliding zone(DD-I-S2)depth is 36.2-49.9 m.The sliding zone(DD-Ⅱ-S1)depth of the DedaⅡlandslide is 37.6-43.1 m.A novel MSM-based method for sliding zone identification is proposed,achieving less than 5%discrepancy in depth determination when compared with drilling data.These results provide a valuable reference for the spatial structural analysis of large-deepseated landslides in geologically complex regions like the eastern Tibetan Plateau.展开更多
The presence of seam gas in the form of methane or carbon dioxide presents a hazard to underground coal mining operations.In-seam drilling has been undertaken for the past three decades for gas drainage to reduce the ...The presence of seam gas in the form of methane or carbon dioxide presents a hazard to underground coal mining operations.In-seam drilling has been undertaken for the past three decades for gas drainage to reduce the risk of gas outburst and lower the concentrations of seam gas in the underground ventilation.The drilling practices have reflected the standards of the times and have evolved with the development of technology and equipment and the needs to provide a safe mining environment underground.Early practice was to adapt equipment from other felds,with rotary drilling being the only form of drilling available.This form of drainage allowed various levels of gas drainage coverage but with changing emphasis,research and development within the coal industry has created specifc equipment,technology and practices to accurately place in-seam boreholes to provide effcient and effective gas drainage.Research into gas content determination established a standard for the process and safe levels for mining operations to continue.Surveying technology improved from the wire-line,single-shot Eastman survey instruments which was time-dependent on borehole depth to electronic instruments located in the drill string which transmitted accurate survey data to the drilling crew without time delays.This allowed improved directional control and increased drilling rates.Directional drilling technology has now been established as the industry standard to provide effective gas drainage drilling.Exploration was identifed as an additional beneft with directional drilling as it has the ability to provide exploration data from long boreholes.The ability of the technology to provide safe and reliable means to investigate the need for inrush protection and water drainage ahead of mining has been established.Directional drilling technology has now been introduced to the Chinese coal industry for gas drainage through a practice of auditing,design,supply,training and ongoing support.Experienced drilling crews can offer site specifc gas drainage drilling services utilising the latest equipment and technology.展开更多
The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-...The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-seismic information integration is proposed which consists of seismic velocity update of drilled formations,seismic velocity prediction of the formation ahead of drilling bit,and the prediction of geological feature and drilling geological environmental factors ahead of bit.In this technology,real information(velocity,formation and depth)behind the drilling bit and local pre-stack seismic data around the wellbore being drilled are used to correct the primitive seismic velocity field for a re-migration of seismic data and to update geological features and drilling geological environmental factors ahead of the drilling bit.Field application shows that this technology can describe and predict the geological features,drilling geological environmental factors and complex drilling problems ahead of the bit timely and improve the prediction efficiency and accuracy greatly.These new updated results are able to provide scientific basis for optimizing drilling decisions.展开更多
Field experimental seismic sounding permitted us to obtain optimal shallow seismic reflection sounding parameters.In process of data processing,we obtained a high-qualitative shallow seismic reflection sounding profil...Field experimental seismic sounding permitted us to obtain optimal shallow seismic reflection sounding parameters.In process of data processing,we obtained a high-qualitative shallow seismic reflection sounding profile by using the techniques such as filtering,edition surgical blanking,prediction deconvolution,fitting static correlation of first arrival time,and velocity analysis.Comprehensive analysis on the information of reflection wave groups along the seismic sounding profile and the stratigraphic and neogeochronological data obtained from many drills near the sounding line reveals that the upper termination of the detected fault zone is located at depth of 75~80 m,in the Middle Pleistocene deposits dated to be about 220 ka BP.The continuity,discontinuity,increasing and decreasing amount of reflection wave groups and change of their configurations,in combination with geological columns of drills,permitted us to know that the width of upper termination of the fault zone is 100 m.It can be inferred from the variation of number of reflection wave groups along the profile that the scarp of hidden fault is 200 m wide and the fault is a synsedimentary active fault in the Early Pleistocene and the early stage of Middle Pleistocene.No tectonic movement,which offset the covering deposits,had occurred since the late stage of Middle Pleistocene.展开更多
For city planning and reducing potential earthquake risk,it’s necessary to detect the information of the buried faults in an urban area especially,including the location and activities.An integrated technique with ge...For city planning and reducing potential earthquake risk,it’s necessary to detect the information of the buried faults in an urban area especially,including the location and activities.An integrated technique with geophysical and geological methods,including the shallow seismic reflection profile,electrical resistivity measurement,geologic borehole section,and exploration trench,was used to detect the Chengnanhe fault,which is one of the two main faults passing through the Weihai urban area in Shandong province,China.The results show that it is a normal fault striking with E-W direction,and it is relatively inactive and stable.By using the thermoluminescence(TL)dating,we found that the Chengnanhe fault initiated in mid-Pleistocene and there was no offset after late Pleistocene.Such an integrated technique with multiple geological and geophysical methods provides a significant assessment of earthquake risk for city planning in urban areas.展开更多
基金supported by the National Natural Science Foundation of China(42372339)the China Geological Survey Project(DD20221816,DD20190319)。
文摘It is of crucial importance to investigate the spatial structures of ancient landslides in the eastern Tibetan Plateau’s alpine canyons as they could provide valuable insights into the evolutionary history of the landslides and indicate the potential for future reactivation.This study examines the Deda ancient landslide,situated in the Chalong-ranbu fault zone,where creep deformation suggests a complex underground structure.By integrating remote sensing,field surveys,Audio-frequency Magnetotellurics(AMT),and Microtremor Survey Method(MSM)techniques,along with engineering geological drilling for validation,to uncover the landslide’s spatial feature s.The research indicates that a fault is developed in the upper part of the Deda ancient landslide,and the gully divides it into Deda landslide accumulation zoneⅠand Deda landslide accumulation zoneⅡin space.The distinctive geological characteristics detectable by MSM in the shallow subsurface and by AMT in deeper layers.The findings include the identification of two sliding zones in the Deda I landslide,the shallow sliding zone(DD-I-S1)depth is approximately 20 m,and the deep sliding zone(DD-I-S2)depth is 36.2-49.9 m.The sliding zone(DD-Ⅱ-S1)depth of the DedaⅡlandslide is 37.6-43.1 m.A novel MSM-based method for sliding zone identification is proposed,achieving less than 5%discrepancy in depth determination when compared with drilling data.These results provide a valuable reference for the spatial structural analysis of large-deepseated landslides in geologically complex regions like the eastern Tibetan Plateau.
文摘The presence of seam gas in the form of methane or carbon dioxide presents a hazard to underground coal mining operations.In-seam drilling has been undertaken for the past three decades for gas drainage to reduce the risk of gas outburst and lower the concentrations of seam gas in the underground ventilation.The drilling practices have reflected the standards of the times and have evolved with the development of technology and equipment and the needs to provide a safe mining environment underground.Early practice was to adapt equipment from other felds,with rotary drilling being the only form of drilling available.This form of drainage allowed various levels of gas drainage coverage but with changing emphasis,research and development within the coal industry has created specifc equipment,technology and practices to accurately place in-seam boreholes to provide effcient and effective gas drainage.Research into gas content determination established a standard for the process and safe levels for mining operations to continue.Surveying technology improved from the wire-line,single-shot Eastman survey instruments which was time-dependent on borehole depth to electronic instruments located in the drill string which transmitted accurate survey data to the drilling crew without time delays.This allowed improved directional control and increased drilling rates.Directional drilling technology has now been established as the industry standard to provide effective gas drainage drilling.Exploration was identifed as an additional beneft with directional drilling as it has the ability to provide exploration data from long boreholes.The ability of the technology to provide safe and reliable means to investigate the need for inrush protection and water drainage ahead of mining has been established.Directional drilling technology has now been introduced to the Chinese coal industry for gas drainage through a practice of auditing,design,supply,training and ongoing support.Experienced drilling crews can offer site specifc gas drainage drilling services utilising the latest equipment and technology.
基金Supported by the Sinopec Scientific Research Project(P17030-4)
文摘The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-seismic information integration is proposed which consists of seismic velocity update of drilled formations,seismic velocity prediction of the formation ahead of drilling bit,and the prediction of geological feature and drilling geological environmental factors ahead of bit.In this technology,real information(velocity,formation and depth)behind the drilling bit and local pre-stack seismic data around the wellbore being drilled are used to correct the primitive seismic velocity field for a re-migration of seismic data and to update geological features and drilling geological environmental factors ahead of the drilling bit.Field application shows that this technology can describe and predict the geological features,drilling geological environmental factors and complex drilling problems ahead of the bit timely and improve the prediction efficiency and accuracy greatly.These new updated results are able to provide scientific basis for optimizing drilling decisions.
基金A High-new Technique Project by State Development and Planning Commission of China (2001977).
文摘Field experimental seismic sounding permitted us to obtain optimal shallow seismic reflection sounding parameters.In process of data processing,we obtained a high-qualitative shallow seismic reflection sounding profile by using the techniques such as filtering,edition surgical blanking,prediction deconvolution,fitting static correlation of first arrival time,and velocity analysis.Comprehensive analysis on the information of reflection wave groups along the seismic sounding profile and the stratigraphic and neogeochronological data obtained from many drills near the sounding line reveals that the upper termination of the detected fault zone is located at depth of 75~80 m,in the Middle Pleistocene deposits dated to be about 220 ka BP.The continuity,discontinuity,increasing and decreasing amount of reflection wave groups and change of their configurations,in combination with geological columns of drills,permitted us to know that the width of upper termination of the fault zone is 100 m.It can be inferred from the variation of number of reflection wave groups along the profile that the scarp of hidden fault is 200 m wide and the fault is a synsedimentary active fault in the Early Pleistocene and the early stage of Middle Pleistocene.No tectonic movement,which offset the covering deposits,had occurred since the late stage of Middle Pleistocene.
基金the Special Fund of China Seismic Experimental Site(Nos.2019CSES0103,2018CESE0102 and 2016CESE0203)the National Natural Science Foundation of China(Nos.41630210,41674060,41974054,and 41974061)the“Active Faults Exploration and Seismic Hazard Assessment in Weihai City”funded by Weihai Municipal People's Government.
文摘For city planning and reducing potential earthquake risk,it’s necessary to detect the information of the buried faults in an urban area especially,including the location and activities.An integrated technique with geophysical and geological methods,including the shallow seismic reflection profile,electrical resistivity measurement,geologic borehole section,and exploration trench,was used to detect the Chengnanhe fault,which is one of the two main faults passing through the Weihai urban area in Shandong province,China.The results show that it is a normal fault striking with E-W direction,and it is relatively inactive and stable.By using the thermoluminescence(TL)dating,we found that the Chengnanhe fault initiated in mid-Pleistocene and there was no offset after late Pleistocene.Such an integrated technique with multiple geological and geophysical methods provides a significant assessment of earthquake risk for city planning in urban areas.