<div style="text-align:justify;"> In most cases, copper ore deposits occur at great depths, so the optimization of excavation costs is of utmost importance to identify the most cost effective and produ...<div style="text-align:justify;"> In most cases, copper ore deposits occur at great depths, so the optimization of excavation costs is of utmost importance to identify the most cost effective and productive mining methods, such as block caving or similar methods specifically developed for these deposits. To be able to apply such methods, it is necessary to have a detailed knowledge of the rock mass in terms of its geomechanical, engineering geological and hydrogeological characteristics. This research aims to reduce geological and geotechnical unknowns, analyze in detail the geological environment, and predict geotechnical conditions for the construction of the shaft. This paper uses the example of Borska Reka Copper Deposit, located in Serbia to illustrate the importance of geotechnical investigation to enable best practice in design and construction of shafts that are over 1000 m deep. </div>展开更多
So many potential risks can be identifed for application of trenchless technology especially using microtunneling methods.Unexpected changes in ground conditions,such as encountering boulders,tree roots,ground water a...So many potential risks can be identifed for application of trenchless technology especially using microtunneling methods.Unexpected changes in ground conditions,such as encountering boulders,tree roots,ground water and man-made structures such as old foundations are the principal geotechnical risks,which affect the selection of an appropriate microtunnel boring machine.On the other hand,the performance of each microtunneling technique will differ while encountering such conditions.Hence,predicting the potential hazards provides a better safety and risk management plan.In this study,a couple of potentially hazardous situation,which are commonly associated with ground conditions,were identifed and investigated.A decision tree aid methodology was proposed based on geotechnical risk assessment for selection of proper microtunneling technique.Based on the approach the most appropriate microtunneling technique has the minimum risk level either before or after hazards mitigation measures.In order to check the effciency of the approach in practice,selection of microtunnel boring machine for Hamadan sewerage pipeline project was evaluated.Accordingly,an earth pressure balance(EPB)MTBM was selected for the project.展开更多
文摘<div style="text-align:justify;"> In most cases, copper ore deposits occur at great depths, so the optimization of excavation costs is of utmost importance to identify the most cost effective and productive mining methods, such as block caving or similar methods specifically developed for these deposits. To be able to apply such methods, it is necessary to have a detailed knowledge of the rock mass in terms of its geomechanical, engineering geological and hydrogeological characteristics. This research aims to reduce geological and geotechnical unknowns, analyze in detail the geological environment, and predict geotechnical conditions for the construction of the shaft. This paper uses the example of Borska Reka Copper Deposit, located in Serbia to illustrate the importance of geotechnical investigation to enable best practice in design and construction of shafts that are over 1000 m deep. </div>
文摘So many potential risks can be identifed for application of trenchless technology especially using microtunneling methods.Unexpected changes in ground conditions,such as encountering boulders,tree roots,ground water and man-made structures such as old foundations are the principal geotechnical risks,which affect the selection of an appropriate microtunnel boring machine.On the other hand,the performance of each microtunneling technique will differ while encountering such conditions.Hence,predicting the potential hazards provides a better safety and risk management plan.In this study,a couple of potentially hazardous situation,which are commonly associated with ground conditions,were identifed and investigated.A decision tree aid methodology was proposed based on geotechnical risk assessment for selection of proper microtunneling technique.Based on the approach the most appropriate microtunneling technique has the minimum risk level either before or after hazards mitigation measures.In order to check the effciency of the approach in practice,selection of microtunnel boring machine for Hamadan sewerage pipeline project was evaluated.Accordingly,an earth pressure balance(EPB)MTBM was selected for the project.