From 2010 to 2012, the China Geological Survey Center for Hydrogeology and Environmental Geology Survey (CHEGS) carried out the project "Potential evaluation and demonstration project of CO2 Geological Storage in C...From 2010 to 2012, the China Geological Survey Center for Hydrogeology and Environmental Geology Survey (CHEGS) carried out the project "Potential evaluation and demonstration project of CO2 Geological Storage in China". During this project, we developed an evaluation index system and technical methods for the potential and suitability of CO2 geological storage based on China's geological conditions, and evaluated the potential and suitability of the primary basins for COz geological storage, in order to draw a series of regional scale maps (at a scale of 1:5000000) and develop an atlas of the main sedimentary basins in China. By using these tools, we delineated many potential targets for CO2 storage. We also built techniques and methods for site selection and the exploration and assessment of CO2 geological storage in deep saline aquifers. Furthermore, through cooperation with the China Shenhua Coal to Liquid and Chemical Co., Ltd., we successfully constructed the first coal-based demonstration project for CO2 geological storage in deep saline aquifers in the Yijinhuoluo Banner of Ordos in the Inner Mongolia Autonomous Region, which brought about the basic preliminary theories, techniques, and methods of geological CO2 storage in deep saline aquifers under China's geological conditions.展开更多
Firstly,relying on the science and technology project of high yield in Hebei Province,connotation of agricultural technology demonstration and extension mode and the high yield grain project in Hebei Province is intro...Firstly,relying on the science and technology project of high yield in Hebei Province,connotation of agricultural technology demonstration and extension mode and the high yield grain project in Hebei Province is introduced.Extension mode of agricultural technology demonstration and radiation is constructed.Agricultural technology demonstration and radiation mode includes the radiation center,primary irradiation and secondary irradiation.Secondly,management system and operational mechanism of agricultural technology demonstration and radiation mode are discussed,mainly expressed in establishing leading group in each demonstration county(city),carrying out leader contract responsibility system,establishing expert advisor steering group and setting up core experts group for subject,establishing technical experts group for subject,setting up leading group in the radiation area,carrying out chief expert responsibility system and technician matrix responsibility system,establishing the operating mechanism of "open,flow,competition and collaboration" with "test area-expert two-way selection" as the core content.Finally,countermeasures to improve the agricultural technology demonstration and radiation mode is put forward,such as establishing the rural technology demonstration base,strengthening cooperation with enterprises,and adopting flexible technical training,so as to promote the spread of agricultural high-tech,to increase the contribution rate of agricultural technology,and to offer ideas for agricultural technology extension model at the new era.展开更多
According to the Technical Guide for Climatic Feasibility Demonstration of Airport Project Site Selection,via statistical analysis on historical climate data of reference weather station,climatic background characteri...According to the Technical Guide for Climatic Feasibility Demonstration of Airport Project Site Selection,via statistical analysis on historical climate data of reference weather station,climatic background characteristics and meteorological disaster situation of preselected site,and characteristics of seasonal distribution,interannual variation and long-term trend of main meteorological elements and disasters were summarized.The difference of meteorological elements between preselected site and reference weather station and its cause were analyzed,and fine analysis of fog,low visibility event,wind,cloud and other meteorological elements or weather with high influence in preselected site was conducted.Climatic feasibility,advantages and disadvantages of meteorological conditions and possible meteorological risks in preselected site were evaluated.The research could provide decision-making basis for site selection of Lingling Airport and airport engineering design.Moreover,key technology route and research results were extracted,and technical analysis process of demonstration report was integrated,which could provide reference for climate feasibility demonstration on site selection of similar airports in China.展开更多
On December 26, 2009, in the main control room of Shanghai Fengxian Converter Station, the voltage value on the screen rose from zero to 800 kV. This represented the demonstrative ±800-kV
The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and the largest water resources and hydropower project constructed in China.The impoundment of Three Gorges Reservoir reached ...The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and the largest water resources and hydropower project constructed in China.The impoundment of Three Gorges Reservoir reached the design water level of 175 m for the first time on October 26,2010,which indicated that the project had met design requirements of various functionalities of flood control,power generation and navigation.To complete the project it took nearly 100 years for conception,demonstration,design and construction of the TGP.How was the conception of TGP proposed? What kind of role should it be? What were the different opinions? How was the project demonstrated? What was the conclusion of demonstration? Those are the issues that many people care and don't know about.To memorize the realization of the century dream of Chinese people and to record the history of development of TGP,the author presents a compendious introduction to the project.展开更多
On April 7, the construction of 110-kV Hechanglu intelligent substation in Tianjin Binhai New Area was started, inaugurating the comprehensive demonstration project for smart grid in Sino-Singapore Tianjin Eco-City.
The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic st...The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic stability and seismic activity,stability of reservoir bank and reservoir-induced earthquake.Meanwhile,the above mentioned engineering geological problems are evaluated according to the preliminary test results since TGP operation and impoundment in 2003.展开更多
To carefully implement the rural revitalization strategy,further promote the structural reform of the agricultural supply front,implement the "155 Development Strategy",speed up the cultivation of the modern...To carefully implement the rural revitalization strategy,further promote the structural reform of the agricultural supply front,implement the "155 Development Strategy",speed up the cultivation of the modern agricultural industrial clusters with output of 100 billion yuan,and constantly consolidate the industrial foundation of the " Second City in Chengdu-Chongqing Line",the Municipal Party Committee and the Municipal Government of Nanchong City decided to implement the " 300 Demonstration Projects" of modern agriculture. It firmly grasps the " bull nose"( key part) of the project,energetically implements the construction of 100 modern circular agricultural demonstration parks,100 agricultural leading enterprises with output value of 100 billion yuan,and 100 agricultural new business model demonstration projects( hereinafter referred to as 300 Demonstration Projects),to realize the goal of the output value of the modern agriculture industrial clusters of Nanchong City exceeds 100 billion yuan in 2020.展开更多
The diffusion of e-commerce has played a significant role in recent rural economic development in China.E-commerce is also considered as an efficient channel to alleviate poverty in rural China.Voluminous studies have...The diffusion of e-commerce has played a significant role in recent rural economic development in China.E-commerce is also considered as an efficient channel to alleviate poverty in rural China.Voluminous studies have investigated the contribution of e-commerce to agricultural development,yet it is lacking empirical evidence as to the effects of e-commerce on rural poverty alleviation.Since the year of 2014,in order to develop rural e-commerce,Chinese government launched the National Rural E-commerce Comprehensive Demonstration Project.This gradual involvement policy offered a natural experiment for evaluation of e-commerce.Based on village-level survey data from rural China and Heckit method,our study finds that rural e-commerce has a significantly positive effect on rural income.Moreover,the effect is inverted U-shaped for the relative-poverty villages.The estimation of the propensity scores matching model confirms that the results are robust.The following policy recommendations are proposed:(1)policy support to rural e-commerce should prioritize the povertystricken villages.By doing so,the marginal income effects of e-commerce will be maximized.(2)Investment in internet infrastructure and establishment of human resources for e-commerce in rural areas will have spillover effects,increasing rural income through the"digital dividend".展开更多
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t...Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China.展开更多
Nearly zero energy buildings (nZEB) will become an obligatory energy efficiency standard in Europe. Following to common guidelines in European legislation, the countries investigated technical and economic framework f...Nearly zero energy buildings (nZEB) will become an obligatory energy efficiency standard in Europe. Following to common guidelines in European legislation, the countries investigated technical and economic framework for the preparation of detailed national technical definition of nZEB. Slovenia accepted the nZEB criteria in early 2015. This paper describes the technical and economic background for identification of economically viable concepts of highly energy efficient apartment building. The highrise demonstration building Eco Silver House revealed that meeting nZEB standards was not an easy task, not so much for technical reasons, but mostly due to the processes, inadequate skills, not fully compliant regulation and insufficient possibilities for interaction between the building and energy networks. Analysis of cost effectiveness showed that the Eco Silver House fulfilled minimal requirements of cost-optimal for apartment building with Net Present Value of 272 EUR/m2 and Primary energy use of 79 kWh/ m2?a in line with the Slovenian national cost optimal study of minimum energy performance requirements from the year 2014. At the time, the requirement of 50% share of renewables in final energy use is not fulfilled, but will be easily reached when EU2020 energy efficiency targets set in the Slovenian Energy Act regarding the RES share in district heating systems and public power grid will be gradually implemented. The demonstration project FP7 EE-HIGHRISE confirms that in spite of the barriers, the nZEB minimum requirements defined on profound theoretical studies can be met in practice.展开更多
文摘From 2010 to 2012, the China Geological Survey Center for Hydrogeology and Environmental Geology Survey (CHEGS) carried out the project "Potential evaluation and demonstration project of CO2 Geological Storage in China". During this project, we developed an evaluation index system and technical methods for the potential and suitability of CO2 geological storage based on China's geological conditions, and evaluated the potential and suitability of the primary basins for COz geological storage, in order to draw a series of regional scale maps (at a scale of 1:5000000) and develop an atlas of the main sedimentary basins in China. By using these tools, we delineated many potential targets for CO2 storage. We also built techniques and methods for site selection and the exploration and assessment of CO2 geological storage in deep saline aquifers. Furthermore, through cooperation with the China Shenhua Coal to Liquid and Chemical Co., Ltd., we successfully constructed the first coal-based demonstration project for CO2 geological storage in deep saline aquifers in the Yijinhuoluo Banner of Ordos in the Inner Mongolia Autonomous Region, which brought about the basic preliminary theories, techniques, and methods of geological CO2 storage in deep saline aquifers under China's geological conditions.
基金Supported by the State Grain High Yield Science and Technology Project in Hebei Province of Eleventh Five-Year Plan(2006BAD02A08-5-1)
文摘Firstly,relying on the science and technology project of high yield in Hebei Province,connotation of agricultural technology demonstration and extension mode and the high yield grain project in Hebei Province is introduced.Extension mode of agricultural technology demonstration and radiation is constructed.Agricultural technology demonstration and radiation mode includes the radiation center,primary irradiation and secondary irradiation.Secondly,management system and operational mechanism of agricultural technology demonstration and radiation mode are discussed,mainly expressed in establishing leading group in each demonstration county(city),carrying out leader contract responsibility system,establishing expert advisor steering group and setting up core experts group for subject,establishing technical experts group for subject,setting up leading group in the radiation area,carrying out chief expert responsibility system and technician matrix responsibility system,establishing the operating mechanism of "open,flow,competition and collaboration" with "test area-expert two-way selection" as the core content.Finally,countermeasures to improve the agricultural technology demonstration and radiation mode is put forward,such as establishing the rural technology demonstration base,strengthening cooperation with enterprises,and adopting flexible technical training,so as to promote the spread of agricultural high-tech,to increase the contribution rate of agricultural technology,and to offer ideas for agricultural technology extension model at the new era.
文摘According to the Technical Guide for Climatic Feasibility Demonstration of Airport Project Site Selection,via statistical analysis on historical climate data of reference weather station,climatic background characteristics and meteorological disaster situation of preselected site,and characteristics of seasonal distribution,interannual variation and long-term trend of main meteorological elements and disasters were summarized.The difference of meteorological elements between preselected site and reference weather station and its cause were analyzed,and fine analysis of fog,low visibility event,wind,cloud and other meteorological elements or weather with high influence in preselected site was conducted.Climatic feasibility,advantages and disadvantages of meteorological conditions and possible meteorological risks in preselected site were evaluated.The research could provide decision-making basis for site selection of Lingling Airport and airport engineering design.Moreover,key technology route and research results were extracted,and technical analysis process of demonstration report was integrated,which could provide reference for climate feasibility demonstration on site selection of similar airports in China.
文摘On December 26, 2009, in the main control room of Shanghai Fengxian Converter Station, the voltage value on the screen rose from zero to 800 kV. This represented the demonstrative ±800-kV
文摘The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and the largest water resources and hydropower project constructed in China.The impoundment of Three Gorges Reservoir reached the design water level of 175 m for the first time on October 26,2010,which indicated that the project had met design requirements of various functionalities of flood control,power generation and navigation.To complete the project it took nearly 100 years for conception,demonstration,design and construction of the TGP.How was the conception of TGP proposed? What kind of role should it be? What were the different opinions? How was the project demonstrated? What was the conclusion of demonstration? Those are the issues that many people care and don't know about.To memorize the realization of the century dream of Chinese people and to record the history of development of TGP,the author presents a compendious introduction to the project.
文摘On April 7, the construction of 110-kV Hechanglu intelligent substation in Tianjin Binhai New Area was started, inaugurating the comprehensive demonstration project for smart grid in Sino-Singapore Tianjin Eco-City.
文摘The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic stability and seismic activity,stability of reservoir bank and reservoir-induced earthquake.Meanwhile,the above mentioned engineering geological problems are evaluated according to the preliminary test results since TGP operation and impoundment in 2003.
基金the Project of National Modern Agriculture Demonstration Area of the Ministry of Agriculture(Nong Ji Fa[2010]22)Project of Nanchong City National Modern Agriculture Demonstration Area Agricultural Reform and Construction Pilot Demonstration Area of the Ministry of Agriculture and Ministry of Finance(Nong Cai Fa[2013]13)Project of Nanchong City Nanchong National Agricultural Science and Technology Park of Ministry of Science and Technology(Guo Ke Ban Nong[2015]9)
文摘To carefully implement the rural revitalization strategy,further promote the structural reform of the agricultural supply front,implement the "155 Development Strategy",speed up the cultivation of the modern agricultural industrial clusters with output of 100 billion yuan,and constantly consolidate the industrial foundation of the " Second City in Chengdu-Chongqing Line",the Municipal Party Committee and the Municipal Government of Nanchong City decided to implement the " 300 Demonstration Projects" of modern agriculture. It firmly grasps the " bull nose"( key part) of the project,energetically implements the construction of 100 modern circular agricultural demonstration parks,100 agricultural leading enterprises with output value of 100 billion yuan,and 100 agricultural new business model demonstration projects( hereinafter referred to as 300 Demonstration Projects),to realize the goal of the output value of the modern agriculture industrial clusters of Nanchong City exceeds 100 billion yuan in 2020.
基金financial support from the National Natural Science Foundation of China(71673274)the Outstanding Innovative Talents Cultivation Funded Programs 2019 of Renmin University of China。
文摘The diffusion of e-commerce has played a significant role in recent rural economic development in China.E-commerce is also considered as an efficient channel to alleviate poverty in rural China.Voluminous studies have investigated the contribution of e-commerce to agricultural development,yet it is lacking empirical evidence as to the effects of e-commerce on rural poverty alleviation.Since the year of 2014,in order to develop rural e-commerce,Chinese government launched the National Rural E-commerce Comprehensive Demonstration Project.This gradual involvement policy offered a natural experiment for evaluation of e-commerce.Based on village-level survey data from rural China and Heckit method,our study finds that rural e-commerce has a significantly positive effect on rural income.Moreover,the effect is inverted U-shaped for the relative-poverty villages.The estimation of the propensity scores matching model confirms that the results are robust.The following policy recommendations are proposed:(1)policy support to rural e-commerce should prioritize the povertystricken villages.By doing so,the marginal income effects of e-commerce will be maximized.(2)Investment in internet infrastructure and establishment of human resources for e-commerce in rural areas will have spillover effects,increasing rural income through the"digital dividend".
文摘Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China.
基金The research presented in this paper is a part of the research and demonstration project FP7 EE-Highrise—Energy efficient demo multi-residential high-rise building supported by the European Commission within the 7th Framework Programme(FP7-2011-NMP-ENV-ENERGY-ICT-EEB)(2013-2015)(www.ee-highrise.eu).
文摘Nearly zero energy buildings (nZEB) will become an obligatory energy efficiency standard in Europe. Following to common guidelines in European legislation, the countries investigated technical and economic framework for the preparation of detailed national technical definition of nZEB. Slovenia accepted the nZEB criteria in early 2015. This paper describes the technical and economic background for identification of economically viable concepts of highly energy efficient apartment building. The highrise demonstration building Eco Silver House revealed that meeting nZEB standards was not an easy task, not so much for technical reasons, but mostly due to the processes, inadequate skills, not fully compliant regulation and insufficient possibilities for interaction between the building and energy networks. Analysis of cost effectiveness showed that the Eco Silver House fulfilled minimal requirements of cost-optimal for apartment building with Net Present Value of 272 EUR/m2 and Primary energy use of 79 kWh/ m2?a in line with the Slovenian national cost optimal study of minimum energy performance requirements from the year 2014. At the time, the requirement of 50% share of renewables in final energy use is not fulfilled, but will be easily reached when EU2020 energy efficiency targets set in the Slovenian Energy Act regarding the RES share in district heating systems and public power grid will be gradually implemented. The demonstration project FP7 EE-HIGHRISE confirms that in spite of the barriers, the nZEB minimum requirements defined on profound theoretical studies can be met in practice.