The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 20...The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.展开更多
This paper presents aspects of study and simulation approach for planned wind power projects in Kosovo Power System in relation with Grid Code requirements. All generators, connected to the Kosovo Transmission System ...This paper presents aspects of study and simulation approach for planned wind power projects in Kosovo Power System in relation with Grid Code requirements. All generators, connected to the Kosovo Transmission System are required to comply with the Grid Code. The Grid Code was originally developed with conventional synchronous generators. Since Wind Turbine Generators don’t have the same characteristics as synchronous generators, it was considered appropriate to develop a new set of Grid Code provisions specifically for Wind Farm Power Stations in relation with specific characteristic of Kosovo Power System. With high excepted penetration of wind power, a simultaneous loss of Wind Farms generation will put in the risk the security and reliability of Power System. Therefore, the main requirements for Wind farm power stations concern the fault ride through capability, frequency operation range, and reactive power capability of wind turbines. In the case of grid faults wind turbines have to supply a definite reactive power depending on the instantaneous voltage level of connection point and they must return quickly to normal operation.展开更多
The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These...The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These projects may be influenced by a few factors that are neither technological nor economic,such as political,social,and international factors.This paper thus presents a multi-level model for recognizing which factor from a compiled list of 14 would impact a particular intercontinental interconnection project and for assessing the degree of the factor’s influence.In the first part of the model,the Analytic Hierarchy Process(AHP)method is used to recognize the project’s most significant impact factors.Using the recognition results,the second part of the model can assess the degree of the factor’s influence on the project based on ratings provided by experts.A comprehensive evaluation can thus be provided.As a case study,the proposed Saudi Arabia-Ethiopia power grid interconnection project connecting Asia and Africa was analyzed.Derived from a combination of multiple opinions from experts,evaluations from the model will be of direct benefit to decision-makers,investors,project implementers,and engineers,providing them with a deeper insight into the project.展开更多
基金Supported by the National Key Technology R&D Program(2012BAC20B1003)the Key National Social Science Fund Project(12&ZD214)the Special Fund Project for the Scientific Research of the Environmental Protection Welfare Industry(201209001)
文摘The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.
文摘This paper presents aspects of study and simulation approach for planned wind power projects in Kosovo Power System in relation with Grid Code requirements. All generators, connected to the Kosovo Transmission System are required to comply with the Grid Code. The Grid Code was originally developed with conventional synchronous generators. Since Wind Turbine Generators don’t have the same characteristics as synchronous generators, it was considered appropriate to develop a new set of Grid Code provisions specifically for Wind Farm Power Stations in relation with specific characteristic of Kosovo Power System. With high excepted penetration of wind power, a simultaneous loss of Wind Farms generation will put in the risk the security and reliability of Power System. Therefore, the main requirements for Wind farm power stations concern the fault ride through capability, frequency operation range, and reactive power capability of wind turbines. In the case of grid faults wind turbines have to supply a definite reactive power depending on the instantaneous voltage level of connection point and they must return quickly to normal operation.
基金supported by the State Grid Science and Technology Project“Research on Method and Evaluation Principle for the Cross-Continent Power Transmission Planning Scheme”(SGTYHT/16-JS-198)。
文摘The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These projects may be influenced by a few factors that are neither technological nor economic,such as political,social,and international factors.This paper thus presents a multi-level model for recognizing which factor from a compiled list of 14 would impact a particular intercontinental interconnection project and for assessing the degree of the factor’s influence.In the first part of the model,the Analytic Hierarchy Process(AHP)method is used to recognize the project’s most significant impact factors.Using the recognition results,the second part of the model can assess the degree of the factor’s influence on the project based on ratings provided by experts.A comprehensive evaluation can thus be provided.As a case study,the proposed Saudi Arabia-Ethiopia power grid interconnection project connecting Asia and Africa was analyzed.Derived from a combination of multiple opinions from experts,evaluations from the model will be of direct benefit to decision-makers,investors,project implementers,and engineers,providing them with a deeper insight into the project.