This article presents information on the study of the flora of Uzbekistan based on grid system mapping. The urban flora of the city of Bukhara was researched in it. As a result of research, the territory of Bukhara ci...This article presents information on the study of the flora of Uzbekistan based on grid system mapping. The urban flora of the city of Bukhara was researched in it. As a result of research, the territory of Bukhara city was divided into 85 indexes based on 1 × 1 km<sup>2</sup> grid mapping system. The diversity and density of species in the indexes are determined. The influence of anthropogenic factors on the diversity of species in the indexes is determined.展开更多
Marine big data are characterized by a large amount and complex structures,which bring great challenges to data management and retrieval.Based on the GeoSOT Grid Code and the composite index structure of the MongoDB d...Marine big data are characterized by a large amount and complex structures,which bring great challenges to data management and retrieval.Based on the GeoSOT Grid Code and the composite index structure of the MongoDB database,this paper proposes a spatio-temporal grid index model(STGI)for efficient optimized query of marine big data.A spatio-temporal secondary index is created on the spatial code and time code columns to build a composite index in the MongoDB database used for the storage of massive marine data.Multiple comparative experiments demonstrate that the retrieval efficiency adopting the STGI approach is increased by more than two to three times compared with other index models.Through theoretical analysis and experimental verification,the conclusion could be achieved that the STGI model is quite suitable for retrieving large-scale spatial data with low time frequency,such as marine big data.展开更多
Optimization and placement of spinning reserve is an important issue in power system planning and operation. Systematic way for security assessment of operating reserve needs to study. A security assessment index syst...Optimization and placement of spinning reserve is an important issue in power system planning and operation. Systematic way for security assessment of operating reserve needs to study. A security assessment index system for operating reserve in large interconnected power grids is presented in this paper. Firstly, classification and determination methods of operating reserve at home and abroad are investigated, and operating reserve is divided into transient state operating reserve and quasi-steady state operating reserve from the view of security assessment. Secondly, assessment indexes and optimization methods for transient state operating reserve are studied. Thirdly, optimization model, deterministic and probabilistic optimization methods for quasi-steady state operating reserve are explored. Finally, some principles for determination of operating reserve are suggested, and a security assessment index system is put forward. The proposed index system, considering both transient and quasi-steady state, both deterministic and probabilistic methods, provides a systematic way to assessment and arrangement of operating reserve.展开更多
To analyze and control complex networks effectively, this paper puts forward a new kind of scheme, which takes control separately in each area and can achieve the network’s coordinated optimality. The proposed algori...To analyze and control complex networks effectively, this paper puts forward a new kind of scheme, which takes control separately in each area and can achieve the network’s coordinated optimality. The proposed algorithm is made up of two parts: the first part decomposes the network into several independent areas based on community structure and decouples the information flow and control power among areas; the second part selects the center nodes from each area with the help of the control centrality index. As long as the status of center nodes is kept on a satisfactory level in each area, the whole system is under effective control. Finally, the algorithm is applied to power grids, and the simulations prove its effectiveness.展开更多
Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such proj...Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such projects and effectively prevent investment risks,this paper proposes an investment optimization decision-making method for multiple power grid construction projects under a certain investment scale.Firstly,an in-depth analysis of the characteristics and development requirements of China’s power grid projects was performed.Thereafter,the time sequence and holographic method was adopted to conduct multi-dimensional,multi-perspective risk assessment of different parts of power grid projects,and a holographic risk assessment index system was developed.Moreover,an investment decision model considering the comprehensive risk based on combination weighting was developed according to the output and input of power grid construction projects.A new combination weighting optimization method that takes into account the investment willingness of enterprises was designed to improve the current weighting evaluation methods.Finally,the validity and applicability of the proposed evaluation method were verified by case examples.展开更多
文摘This article presents information on the study of the flora of Uzbekistan based on grid system mapping. The urban flora of the city of Bukhara was researched in it. As a result of research, the territory of Bukhara city was divided into 85 indexes based on 1 × 1 km<sup>2</sup> grid mapping system. The diversity and density of species in the indexes are determined. The influence of anthropogenic factors on the diversity of species in the indexes is determined.
基金This research was funded by the National Key Research and Development Plan(2018YFB0505300)the Guangxi Science and Technology Major Project(AA18118025)+1 种基金the Opening Foundation of Key Laboratory of Environment Change and Resources Use in Beibu Gulf,Ministry of Education(Nanning Normal University)Guangxi Key Laboratory of Earth Surface Processes and Intelligent Simulation(Nanning Normal University)(No.NNNU-KLOP-K1905).
文摘Marine big data are characterized by a large amount and complex structures,which bring great challenges to data management and retrieval.Based on the GeoSOT Grid Code and the composite index structure of the MongoDB database,this paper proposes a spatio-temporal grid index model(STGI)for efficient optimized query of marine big data.A spatio-temporal secondary index is created on the spatial code and time code columns to build a composite index in the MongoDB database used for the storage of massive marine data.Multiple comparative experiments demonstrate that the retrieval efficiency adopting the STGI approach is increased by more than two to three times compared with other index models.Through theoretical analysis and experimental verification,the conclusion could be achieved that the STGI model is quite suitable for retrieving large-scale spatial data with low time frequency,such as marine big data.
文摘Optimization and placement of spinning reserve is an important issue in power system planning and operation. Systematic way for security assessment of operating reserve needs to study. A security assessment index system for operating reserve in large interconnected power grids is presented in this paper. Firstly, classification and determination methods of operating reserve at home and abroad are investigated, and operating reserve is divided into transient state operating reserve and quasi-steady state operating reserve from the view of security assessment. Secondly, assessment indexes and optimization methods for transient state operating reserve are studied. Thirdly, optimization model, deterministic and probabilistic optimization methods for quasi-steady state operating reserve are explored. Finally, some principles for determination of operating reserve are suggested, and a security assessment index system is put forward. The proposed index system, considering both transient and quasi-steady state, both deterministic and probabilistic methods, provides a systematic way to assessment and arrangement of operating reserve.
基金the National Science Foundation of China (No.50525721, 50595411)the National Basic Research Program of China(No.G2004CB217902)
文摘To analyze and control complex networks effectively, this paper puts forward a new kind of scheme, which takes control separately in each area and can achieve the network’s coordinated optimality. The proposed algorithm is made up of two parts: the first part decomposes the network into several independent areas based on community structure and decouples the information flow and control power among areas; the second part selects the center nodes from each area with the help of the control centrality index. As long as the status of center nodes is kept on a satisfactory level in each area, the whole system is under effective control. Finally, the algorithm is applied to power grids, and the simulations prove its effectiveness.
基金supported by the State Grid Science and Technology Project (SGTYHT/16-JS-198)
文摘Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such projects and effectively prevent investment risks,this paper proposes an investment optimization decision-making method for multiple power grid construction projects under a certain investment scale.Firstly,an in-depth analysis of the characteristics and development requirements of China’s power grid projects was performed.Thereafter,the time sequence and holographic method was adopted to conduct multi-dimensional,multi-perspective risk assessment of different parts of power grid projects,and a holographic risk assessment index system was developed.Moreover,an investment decision model considering the comprehensive risk based on combination weighting was developed according to the output and input of power grid construction projects.A new combination weighting optimization method that takes into account the investment willingness of enterprises was designed to improve the current weighting evaluation methods.Finally,the validity and applicability of the proposed evaluation method were verified by case examples.