Rockburst criterion and evaluation method for potential rockburst pit depth considering excavation damage effect 被引量:2
1
作者 Jinhao Dai Fengqiang Gong Lei Xu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第5期1649-1666,共18页
Excavation-induced disturbances in deep tunnels will lead to deterioration of rock properties and formation of excavation damaged zone(EDZ).This excavation damage effect may affect the potential rockburst pit depth.Ta... Excavation-induced disturbances in deep tunnels will lead to deterioration of rock properties and formation of excavation damaged zone(EDZ).This excavation damage effect may affect the potential rockburst pit depth.Taking two diversion tunnels of Jinping II hydropower station for example,the relationship between rockburst pit depth and excavation damage effect is first surveyed.The results indicate that the rockburst pit depth in tunnels with severe damage to rock masses is relatively large.Subsequently,the excavation-induced damage effect is characterized by disturbance factor D based on the Hoek-Brown criterion and wave velocity method.It is found that the EDZ could be further divided into a high-damage zone(HDZ)with D=1 and weak-damage zone(WDZ),and D decays from one to zero linearly.For this,a quantitative evaluation method for potential rockburst pit depth is established by presenting a three-element rockburst criterion considering rock strength,geostress and disturbance factor.The evaluation results obtained by this method match well with actual observations.In addition,the weakening of rock mass strength promotes the formation and expansion of potential rockburst pits.The potential rockburst pit depth is positively correlated with HDZ and WDZ depths,and the HDZ depth has a significant contribution to the potential rockburst pit depth. 展开更多
关键词 Deep tunnel ROCKBURST Rockburst pit excavation damage effect Hoek-Brown criterion
下载PDF
Subsurface multi-physical characterization of mountain excavation and city construction in loess plateau with a fiber-optic sensing system 被引量:1
2
作者 Jie Liu Bin Shi +3 位作者 Kai Gu Meng-Ya Sun Jun-Cheng Yao He-Ming Han 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第8期2935-2946,共12页
Mountain excavation and city construction(MECC)projects being launched in the Loess Plateau in China involve the creation of large-scale artificial land.Understanding the subsurface evolution characteristics of the ar... Mountain excavation and city construction(MECC)projects being launched in the Loess Plateau in China involve the creation of large-scale artificial land.Understanding the subsurface evolution characteristics of the artificial land is essential,yet challenging.Here,we use an improved fiber-optic monitoring system for its subsurface multi-physical characterization.The system enables us to gather spatiotemporal distribution of various parameters,including strata deformation,temperature,and moisture.Yan’an New District was selected as a case study to conduct refined in-situ monitoring through a 77 m-deep borehole and a 30 m-long trench.Findings reveal that the ground settlement involves both the deformation of the filling loess and the underlying intact loess.Notably,the filling loess exhibits a stronger creep capability compared to underlying intact loess.The deformation along the profile is unevenly distributed,with a positive correlation with soil moisture.Water accumulation has been observed at the interface between the filling loess and the underlying intact loess,leading to a significant deformation.Moreover,the temperature and moisture in the filling loess have reached a new equilibrium state,with their depths influenced by atmospheric conditions measuring at 31 m and 26 m,respectively.The refined investigation allows us to identify critical layers that matter the sustainable development of newly created urban areas,and provide improved insights into the evolution mechanisms of land creation. 展开更多
关键词 Mountain excavation and city construction Fiber-optic monitoring Multi-physical characterization Compacted loess
下载PDF
Modeling time-dependent mechanical behavior of hard rock considering excavation-induced damage and complex 3D stress states 被引量:1
3
作者 Peiyang Yu Xiuli Ding +3 位作者 Peng-Zhi Pan Shuting Miao Zhaofeng Wang Shuling Huang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第10期4046-4065,共20页
To investigate the long-term stability of deep rocks,a three-dimensional(3D)time-dependent model that accounts for excavation-induced damage and complex stress state is developed.This model comprises three main compon... To investigate the long-term stability of deep rocks,a three-dimensional(3D)time-dependent model that accounts for excavation-induced damage and complex stress state is developed.This model comprises three main components:a 3D viscoplastic isotropic constitutive relation that considers excavation damage and complex stress state,a quantitative relationship between critical irreversible deformation and complex stress state,and evolution characteristics of strength parameters.The proposed model is implemented in a self-developed numerical code,i.e.CASRock.The reliability of the model is validated through experiments.It is indicated that the time-dependent fracturing potential index(xTFPI)at a given time during the attenuation creep stage shows a negative correlation with the extent of excavationinduced damage.The time-dependent fracturing process of rock demonstrates a distinct interval effect of the intermediate principal stress,thereby highlighting the 3D stress-dependent characteristic of the model.Finally,the influence of excavation-induced damage and intermediate principal stress on the time-dependent fracturing characteristics of the surrounding rocks around the tunnel is discussed. 展开更多
关键词 Hard rock excavation damage Complex stress state Three-dimensional(3D)time-dependent model
下载PDF
Effect of slope angle on fractured rock masses under combined influence of variable rainfall infiltration and excavation unloading 被引量:1
4
作者 Xiaoshuang Li Qihang Li +3 位作者 Yunmin Wang Wei Liu Di Hou Chun Zhu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第10期4154-4176,共23页
Intense precipitation infiltration and intricate excavation processes are crucial factors that impact the stability and security of towering and steep rock slopes within mining sites.The primary aim of this research w... Intense precipitation infiltration and intricate excavation processes are crucial factors that impact the stability and security of towering and steep rock slopes within mining sites.The primary aim of this research was to investigate the progression of cumulative failure within a cracked rock formation,considering the combined effects of precipitation and excavation activities.The study was conducted in the Huangniuqian eastern mining area of the Dexing Copper Mine in Jiangxi Province,China.An engineering geological investigation was conducted,a physical model experiment was performed,numerical calculations and theoretical analysis were conducted using the matrix discrete element method(Mat-DEM),and the deformation characteristics and the effect of the slope angle of a fractured rock mass under different scenarios were examined.The failure and instability mechanisms of the fractured rock mass under three slope angle models were analyzed.The experimental results indicate that as the slope angle increases,the combined effect of rainfall infiltration and excavation unloading is reduced.A novel approach to simulating unsaturated seepage in a rock mass,based on the van Genuchten model(VGM),has been developed.Compared to the vertical displacement observed in a similar physical experiment,the average relative errors associated with the slope angles of 45,50,and 55were 2.094%,1.916%,and 2.328%,respectively.Accordingly,the combined effect of rainfall and excavation was determined using the proposed method.Moreover,the accuracy of the numerical simulation was validated.The findings contribute to the seepage field in a meaningful way,offering insight that can inform and enhance existing methods and theories for research on the underlying mechanism of ultra-high and steep rock slope instability,which can inform the development of more effective risk management strategies. 展开更多
关键词 Open-pit to underground excavation Rainfall infiltration Similarity simulation Numerical simulation Image recognition Slope angle
下载PDF
A spatiotemporal deep learning method for excavation-induced wall deflections 被引量:1
5
作者 Yuanqin Tao Shaoxiang Zeng +3 位作者 Honglei Sun Yuanqiang Cai Jinzhang Zhang Xiaodong Pan 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第8期3327-3338,共12页
Data-driven approaches such as neural networks are increasingly used for deep excavations due to the growing amount of available monitoring data in practical projects.However,most neural network models only use the da... Data-driven approaches such as neural networks are increasingly used for deep excavations due to the growing amount of available monitoring data in practical projects.However,most neural network models only use the data from a single monitoring point and neglect the spatial relationships between multiple monitoring points.Besides,most models lack flexibility in providing predictions for multiple days after monitoring activity.This study proposes a sequence-to-sequence(seq2seq)two-dimensional(2D)convolutional long short-term memory neural network(S2SCL2D)for predicting the spatiotemporal wall deflections induced by deep excavations.The model utilizes the data from all monitoring points on the entire wall and extracts spatiotemporal features from data by combining the 2D convolutional layers and long short-term memory(LSTM)layers.The S2SCL2D model achieves a long-term prediction of wall deflections through a recursive seq2seq structure.The excavation depth,which has a significant impact on wall deflections,is also considered using a feature fusion method.An excavation project in Hangzhou,China,is used to illustrate the proposed model.The results demonstrate that the S2SCL2D model has superior prediction accuracy and robustness than that of the LSTM and S2SCL1D(one-dimensional)models.The prediction model demonstrates a strong generalizability when applied to an adjacent excavation.Based on the long-term prediction results,practitioners can plan and allocate resources in advance to address the potential engineering issues. 展开更多
关键词 Braced excavation Wall deflections Deep learning Convolutional layer Long short-term memory(LSTM) Sequence to sequence(seq2seq)
下载PDF
An efficient physics-guided Bayesian framework for predicting ground settlement profile during excavations in clay
6
作者 Cong Tang Shuyu He Wanhuan Zhou 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第4期1411-1424,共14页
Recently,the application of Bayesian updating to predict excavation-induced deformation has proven successful and improved prediction accuracy significantly.However,updating the ground settlement profile,which is cruc... Recently,the application of Bayesian updating to predict excavation-induced deformation has proven successful and improved prediction accuracy significantly.However,updating the ground settlement profile,which is crucial for determining potential damage to nearby infrastructures,has received limited attention.To address this,this paper proposes a physics-guided simplified model combined with a Bayesian updating framework to accurately predict the ground settlement profile.The advantage of this model is that it eliminates the need for complex finite element modeling and makes the updating framework user-friendly.Furthermore,the model is physically interpretable,which can provide valuable references for construction adjustments.The effectiveness of the proposed method is demonstrated through two field case studies,showing that it can yield satisfactory predictions for the settlement profile. 展开更多
关键词 Bayesian updating excavationS Ground settlement profile Simplified model UNCERTAINTY
下载PDF
Numerical Simulation of Surrounding Rock Deformation and Grouting Reinforcement of Cross-Fault Tunnel under Different Excavation Methods
7
作者 Duan Zhu Zhende Zhu +2 位作者 Cong Zhang LunDai Baotian Wang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第3期2445-2470,共26页
Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability a... Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability and damageto the tunnel. As a result, it is essential to conduct research on tunnel construction and grouting reinforcementtechnology in fault fracture zones to address these issues and ensure the safety of tunnel excavation projects. Thisstudy utilized the Xianglushan cross-fault tunnel to conduct a comprehensive analysis on the construction, support,and reinforcement of a tunnel crossing a fault fracture zone using the three-dimensional finite element numericalmethod. The study yielded the following research conclusions: The excavation conditions of the cross-fault tunnelarray were analyzed to determine the optimal construction method for excavation while controlling deformationand stress in the surrounding rock. The middle partition method (CD method) was found to be the most suitable.Additionally, the effects of advanced reinforcement grouting on the cross-fault fracture zone tunnel were studied,and the optimal combination of grouting reinforcement range (140°) and grouting thickness (1m) was determined.The stress and deformation data obtained fromon-site monitoring of the surrounding rock was slightly lower thanthe numerical simulation results. However, the change trend of both sets of data was found to be consistent. Theseresearch findings provide technical analysis and data support for the construction and design of cross-fault tunnels. 展开更多
关键词 Cross-fault tunnel finite element analysis excavation methods surrounding rock deformation grouting reinforcement
下载PDF
Application of excavation compensation method for enhancing stability and efficiency in shallow large-span rock tunnels
8
作者 BIAN Wen-hui YANG Jun +2 位作者 ZHU Chun WANG Ke-xue XU Dong-ming 《Journal of Central South University》 SCIE EI CAS CSCD 2024年第9期3242-3263,共22页
Engineering shallow,large-span rock tunnels challenges deformation control and escalates construction costs.This study investigates the excavation compensation method(ECM)and its associated technologies to address the... Engineering shallow,large-span rock tunnels challenges deformation control and escalates construction costs.This study investigates the excavation compensation method(ECM)and its associated technologies to address these issues.Utilizing five key technologies,the ECM effectively modulates radial stress post-excavation,redistributes stress in the surrounding rock,and eliminates tensile stress at the excavation face.Pre-tensioning measures further enhance the rock’s residual strength,establishing a new stability equilibrium.Field tests corroborate the method’s effectiveness,demonstrating a crown settlement reduction of 3–8 mm,a nearly 50%decrease compared to conventional construction approaches.Additionally,material consumption and construction duration were reduced by approximately 30%–35%and 1.75 months per 100 m,respectively.Thus,the ECM represents a significant innovation in enhancing the stability and construction efficiency of large-span rock tunnels,marking a novel contribution to the engineering field. 展开更多
关键词 excavation compensation method rocky tunnels shallow spanning tunnels tunnel support field test
下载PDF
Exploring the feasibility of prestressed anchor cables as an alternative to temporary support in the excavation of super-large-span tunnel
9
作者 Shunhua Zhou Yuyin Jin +3 位作者 Zhiyao Tian Chunhua Zou Heming Zhao Zengrun Miao 《Railway Engineering Science》 EI 2024年第3期344-360,共17页
Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partit... Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partition the tunnel face and divide the excavation into multiple stages.However,these internal supports generally impose spatial constraints,limiting the use of large-scale excavation equipment and reducing construction efficiency.To address this constraint,this study adopts the“Shed-frame”principle to explore the feasibility of an innovative support system,which aims to replace internal supports with prestressed anchor cables and thus provide a more spacious working space with fewer internal obstructions.To evaluate its effectiveness,a field case involving the excavation of a 24-m span tunnel in soft rock is presented,and an analysis of extensive field data is conducted to study the deformation characteristics of the surrounding rock and the mechanical behavior of the support system.The results revealed that prestressed anchor cables integrated the initial support with the shed,creating an effective“shed-frame”system,which successively maintained tunnel deformation and frame stress levels within safe regulatory bounds.Moreover,the prestressed anchor cables bolstered the surrounding rock effectively and reduced the excavation-induced disturbance zone significantly.In summary,the proposed support system balances construction efficiency and safety.These field experiences may offer valuable insights into the popularization and further development of prestressed anchor cable support systems. 展开更多
关键词 Super-large-span tunnel Construction safety Sequential excavation method Shed-frame principle Prestressed anchor cables
下载PDF
A hybrid ventilation scheme applied to bidirectional excavation tunnel construction with a long inclined shaft
10
作者 YANG Wei-chao WANG Jian +3 位作者 DENG E LIU Yi-kang LUO Lu-sen YANG Jia 《Journal of Central South University》 SCIE EI CAS CSCD 2024年第9期3187-3205,共19页
The breakage and bending of ducts result in a difficulty to cope with ventilation issues in bidirectional excavation tunnels with a long inclined shaft using a single ventilation method based on ducts.To discuss the h... The breakage and bending of ducts result in a difficulty to cope with ventilation issues in bidirectional excavation tunnels with a long inclined shaft using a single ventilation method based on ducts.To discuss the hybrid ventilation system applied in bidirectional excavation tunnels with a long inclined shaft,this study has established a full-scale computational fluid dynamics model based on field tests,the Poly-Hexcore method,and the sliding mesh technique.The distribution of wind speed,temperature field,and CO in the tunnel are taken as indices to compare the ventilation efficiency of three ventilation systems(duct,duct-ventilation shaft,duct–ventilated shaft-axial fan).The results show that the hybrid ventilation scheme based on duct-ventilation shaft–axial fan performs the best among the three ventilation systems.Compared to the duct,the wind speed and cooling rate in the tunnel are enhanced by 7.5%–30.6%and 14.1%–17.7%,respectively,for the duct-vent shaft-axial fan condition,and the volume fractions of CO are reduced by 26.9%–73.9%.This contributes to the effective design of combined ventilation for bidirectional excavation tunnels with an inclined shaft,ultimately improving the air quality within the tunnel. 展开更多
关键词 bidirectional excavation tunnel inclined shaft hybrid ventilation scheme computational fluid dynamics ventilation efficiency
下载PDF
Evaluation of excavation damaged zones(EDZs)in Horonobe Underground Research Laboratory(URL)
11
作者 Koji Hata Sumio Niunoya +1 位作者 Kazuhei Aoyagi Nobukatsu Miyara 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第2期365-378,共14页
Excavation of underground caverns,such as mountain tunnels and energy-storage caverns,may cause the damages to the surrounding rock as a result of the stress redistribution.In this influenced zone,new cracks and disco... Excavation of underground caverns,such as mountain tunnels and energy-storage caverns,may cause the damages to the surrounding rock as a result of the stress redistribution.In this influenced zone,new cracks and discontinuities are created or propagate in the rock mass.Therefore,it is effective to measure and evaluate the acoustic emission(AE)events generated by the rocks,which is a small elastic vibration,and permeability change.The authors have developed a long-term measurement device that incorporates an optical AE(O-AE)sensor,an optical pore pressure sensor,and an optical temperature sensor in a single multi-optical measurement probe(MOP).Japan Atomic Energy Agency has been conducting R&D activities to enhance the reliability of high-level radioactive waste(HLW)deep geological disposal technology.In a high-level radioactive disposal project,one of the challenges is the development of methods for long-term monitoring of rock mass behavior.Therefore,in January 2014,the long-term measurements of the hydro-mechanical behavior of the rock mass were launched using the developed MOP in the vicinity of 350 m below the surface at the Horonobe Underground Research Center.The measurement results show that AEs occur frequently up to 1.5 m from the wall during excavation.In addition,hydraulic conductivity increased by 2e4 orders of magnitude.Elastoplastic analysis revealed that the hydraulic behavior of the rock mass affected the pore pressure fluctuations and caused micro-fractures.Based on this,a conceptual model is developed to represent the excavation damaged zone(EDZ),which contributes to the safe geological disposal of radioactive waste. 展开更多
关键词 excavation damaged zone(EDZ) Optical sensor Long-term monitoring Acoustic emission(AE) Shaft sinking
下载PDF
A modified back analysis method for deep excavation with multi-objective optimization procedure
12
作者 Chenyang Zhao Le Chen +2 位作者 Pengpeng Ni Wenjun Xia Bin Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第4期1373-1387,共15页
Real-time prediction of excavation-induced displacement of retaining pile during the deep excavation process is crucial for construction safety.This paper proposes a modified back analysis method with multi-objective ... Real-time prediction of excavation-induced displacement of retaining pile during the deep excavation process is crucial for construction safety.This paper proposes a modified back analysis method with multi-objective optimization procedure,which enables a real-time prediction of horizontal displacement of retaining pile during construction.As opposed to the traditional stage-by-stage back analysis,time series monitoring data till the current excavation stage are utilized to form a multi-objective function.Then,the multi-objective particle swarm optimization (MOPSO) algorithm is applied for parameter identification.The optimized model parameters are immediately adopted to predict the excavation-induced pile deformation in the continuous construction stages.To achieve efficient parameter optimization and real-time prediction of system behavior,the back propagation neural network (BPNN) is established to substitute the finite element model,which is further implemented together with MOPSO for automatic operation.The proposed approach is applied in the Taihu tunnel excavation project,where the effectiveness of the method is demonstrated via the comparisons with the site monitoring data.The method is reliable with a prediction accuracy of more than 90%.Moreover,different optimization algorithms,including non-dominated sorting genetic algorithm (NSGA-II),Pareto Envelope-based Selection Algorithm II (PESA-II) and MOPSO,are compared,and their influences on the prediction accuracy at different excavation stages are studied.The results show that MOPSO has the best performance for high dimensional optimization task. 展开更多
关键词 Multi-objective optimization Back analysis Surrogate model Multi-objective particle swarm optimization(MOPSO) Deep excavation
下载PDF
Deterministic and probabilistic analysis of great-depth braced excavations:A 32 m excavation case study in Paris
13
作者 Tingting Zhang Julien Baroth +1 位作者 Daniel Dias Khadija Nejjar 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第5期1505-1521,共17页
The Fort d’Issy-Vanves-Clamart(FIVC)braced excavation in France is analyzed to provide insights into the geotechnical serviceability assessment of excavations at great depth within deterministic and probabilistic fra... The Fort d’Issy-Vanves-Clamart(FIVC)braced excavation in France is analyzed to provide insights into the geotechnical serviceability assessment of excavations at great depth within deterministic and probabilistic frameworks.The FIVC excavation is excavated at 32 m below the ground surface in Parisian sedimentary basin and a plane-strain finite element analysis is implemented to examine the wall deflections and ground surface settlements.A stochastic finite element method based on the polynomial chaos Kriging metamodel(MSFEM)is then proposed for the probabilistic analyses.Comparisons with field measurements and former studies are carried out.Several academic cases are then conducted to investigate the great-depth excavation stability regarding the maximum horizontal wall deflection and maximum ground surface settlement.The results indicate that the proposed MSFEM is effective for probabilistic analyses and can provide useful insights for the excavation design and construction.A sensitivity analysis for seven considered random parameters is then implemented.The soil friction angle at the excavation bottom layer is the most significant one for design.The soil-wall interaction effects on the excavation stability are also given. 展开更多
关键词 Braced deep excavation Soil-wall interaction Stochastic finite element method Horizontal wall deflection SETTLEMENT Failure probability
下载PDF
Optimal depth of in-situ pressure-preserved coring in coal seams considering roadway excavation and drilling disturbance
14
作者 Peng-Fei Cui De-Lei Shang +5 位作者 Peng Chu Ju Li Da-Li Sun Tian-Yu Wang Ming-Zhong Gao He-Ping Xie 《Petroleum Science》 SCIE EI CAS CSCD 2024年第5期3517-3534,共18页
Using pressure-preserved coring technique to determine in-situ gas content provides a more precise assessment of gas resource reserves and safeguard of mining safety in coal seams. How coring technique and depth affec... Using pressure-preserved coring technique to determine in-situ gas content provides a more precise assessment of gas resource reserves and safeguard of mining safety in coal seams. How coring technique and depth affect the determination of gas content is unclear due to borehole zoning rupture caused by roadway excavation and drilling disturbance. To this end, a proposed coupling model of stress distribution and gas migration was simulated and validated by FLAC^(3D) and COMSOL Multiphysics considering superposition effects of roadway excavation and drilling disturbance. The findings indicate that the roadway surrounding rock displays distinct zoning features including stress relief zone, stress concentration zone that is composed of plastic zone, elastic zone, and original stress zone;and the broken situations depending on the borehole peeping are consistent with the corresponding simulation results.On this basis, this study proposes a set of drilling coring depth calculation and prediction model for the gas desorption affected area under engineering disturbance. Optimal depth of coring drilling is not only approach to the in-situ coal bulk, but also can get the balance of the drilling workload and cost controlling. According to the typical mine site geological conditions and the numerical simulation results in this study, if the roadway excavation time is ~1 year, it is recommended that the pressure-preserved coring depth should be greater than 17 m. 展开更多
关键词 In-situ fidelity coring In-situ pressure preserved coring Gas content Drilling disturbance Coring depth excavation damage zone
下载PDF
Application of Roadway Spray Material to Fire Prevention in Goaf Excavation
15
作者 Hao Rong 《World Journal of Engineering and Technology》 2024年第2期389-400,共12页
In order to reduce the risk of spontaneous combustion in goaf during goaf excavation process, polymer modified cement mortar spraying material was used to spray and seal the roadway surface. The experimental applicati... In order to reduce the risk of spontaneous combustion in goaf during goaf excavation process, polymer modified cement mortar spraying material was used to spray and seal the roadway surface. The experimental application was carried out in the upper channel 2304 of a mine in Henan Province. The test results showed that polymer modified cement mortar spraying material could effectively support the roadway and greatly reduce the deformation rate of the roadway. The best spraying thickness is 5 mm. Through the monitoring of tunnel air leakage, it is concluded that the polymer modified cement mortar spraying material can reduce the tunnel air leakage and play a better sealing effect. 展开更多
关键词 Goaf excavation Thin Layer Spraying Construction Technology Shotcrete Plugging Air Leakage Plugging
下载PDF
Stability monitoring and evaluation of the modeled test square for prehistoric earthen sites during excavation period 被引量:3
16
作者 谌文武 戴鹏飞 +3 位作者 张景科 陈鹏飞 郭青林 孙满利 《Journal of Southeast University(English Edition)》 EI CAS 2016年第4期464-471,共8页
In order to explore the stability of test square during archaeological excavation for prehistoric earthen sites in Hangzhou, a modeled test square with 2. 3 min depth, inplane dimensions of 5 min width by 5 m in lengt... In order to explore the stability of test square during archaeological excavation for prehistoric earthen sites in Hangzhou, a modeled test square with 2. 3 min depth, inplane dimensions of 5 min width by 5 m in length, and an archaeological column in the middle was excavated by means of a top-down excavation technique. To investigate the stability performance of the modeled test square and the associated effect on the adjacent area, a real-time comprehensive instrumentation program was conducted during the excavation. Field observations included ground settlements, lateral displacement, pore pressure and underground water level. Monitoring data indicates that the ground settlement induced by dewatering and unloading action basically decreases with the increase of the distance away from the pit edge, and the lateral displacements at four sides showa nonlinear variation along the depth. The maximum value is far below the acceptable value regulated by the related standard,which validates the stability of the modeled test square during excavation. Variations of pore pressure and water level suggest that long-term stability should be paid more attention due to the slowconsolidation of soft soil. Meanwhile, it is proved that the step shape of the wall can resist lateral displacement more effectively than the vertical shape of wall. This case study provides insights into the real archaeological excavation in Hangzhou, in particular Liangzhu prehistoric earthen sites. 展开更多
关键词 prehistoric earthen sites archaeological excavation test square stability monitoring
下载PDF
Reliability analysis of anti-pull piles under excavation
17
作者 徐志军 郑俊杰 +1 位作者 边晓亚 刘勇 《Journal of Southeast University(English Edition)》 EI CAS 2012年第2期203-208,共6页
The impact of excavation on the reliability of anti- pull piles is studied, and three cases of reliability analysis, named reliability of ultimate limit state (ULS), reliability of serviceability limit state (SLS)... The impact of excavation on the reliability of anti- pull piles is studied, and three cases of reliability analysis, named reliability of ultimate limit state (ULS), reliability of serviceability limit state (SLS) and reliability of system (SYS) are studied. The reduction factor of the pile capacity is used to calculate the reliability indices for the three cases. The ratio ξ of the pile capacity of SLS to the pile capacity of ULS has a significant influence on the reliability indices of SLS and SYS. The mean value μξ of the ratio ξ: is considered as a random variable to study the reliability indices of SLS and SYS. The numerical example demonstrates that the excavation depth and the excavation diameter are proved to have significant influences on the reduction factor of the pile capacity and the reliability indices. The reliability indices decrease with the increase in the excavation depth, and the excavation diameter has a considerable influence on the reliability index when the excavation is relatively deep. In addition, μξ has a significant influence on the reliability indices of SLS and SYS. For a more accurate estimation of μξ, further research should be conducted to study μξ. 展开更多
关键词 excavation reliability anti-pull piles reduction factor excavation depth excavation diameter
下载PDF
Numerical analyses of influence of overlying pit excavation on existing tunnels 被引量:34
18
作者 郑刚 魏少伟 《Journal of Central South University》 SCIE EI CAS 2008年第S2期69-75,共7页
The response of existing tunnel due to overlying excavation was studied using 2D FEM (Finite element method). Three typical locations of tunnel with respect to excavation, namely at the central line under the excavati... The response of existing tunnel due to overlying excavation was studied using 2D FEM (Finite element method). Three typical locations of tunnel with respect to excavation, namely at the central line under the excavation bottom, directly under the base of diaphragm wall and outside of diaphragm, were considered. The variation of tunnel response with the change of location of tunnel was analyzed. The stress path of soil surrounding tunnel during the process of excavation was compared. Numerical analysis results indicate that the underlying tunnels at different locations under the excavation will experience convergence and divergence due to overlying excavation. Moreover, the tunnel located below base of diaphragm wall will experience distortion. The deformation is mainly due to the uneven changes of ground contact pressure on tunnel linings. Both the vertical and horizontal displacement of the tunnel decrease with the increase of the tunnel embedded depth beneath the formation of excavation. 展开更多
关键词 PIT excavation TUNNEL RESPONSE FEM
下载PDF
Deformation characteristics and safety assessment of a high-speed railway induced by undercutting metro tunnel excavation 被引量:21
19
作者 Wangping Qian Taiyue Qi +2 位作者 Yunjian Zhao Yizhou Le Haiyang Yi 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第1期88-98,共11页
Stratum deformation(settlement) is a challenging issue in tunnel engineering, especially when construction of metro tunnels has to undercut high-speed railway. For this purpose, we used the FLAC30 software to analyze ... Stratum deformation(settlement) is a challenging issue in tunnel engineering, especially when construction of metro tunnels has to undercut high-speed railway. For this purpose, we used the FLAC30 software to analyze the stratum settlement characteristics of high-speed railway at different crossing angles intersected by metro tunnel, in terms of ground settlement trough, stratum slip line and irregularity of ballastless tracks. According to the evolution of the stratum settlement at different angle regions, an optimized angle is proposed for the actual project design. In order to reduce the influence of stratum settlement on the safety of high-speed railway, an approach of safety assessment is proposed for the shield engineering undercutting high-speed railway, as per Chinese specifications using numerical results and on-site conditions. A case study is conducted for the shield tunnel section crossing the Wuhan-Guangzhou High-speed Railway between the Guangzhou North Railway Station and the Huacheng Road Station, which represents the first metro tunnel project passing below a high-speed railway in China. A series of measures is taken to ensure the safe excavation of the shield tunnel and the operation of the high-speed railway. The results can provide a technical support for performing a safety evaluation between high-speed railways and metro tunnels. 展开更多
关键词 METRO tunnel excavation High-speed RAILWAY SETTLEMENT characteristics Safety assessment Numerical simulation Case application
下载PDF
Evaluation of human response to blasting vibration from excavation of a large scale rock slope:A case study 被引量:8
20
作者 Yan Peng Lu Wenbo +2 位作者 Zhang Jing Zou Yujun Chen Ming 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2017年第2期435-446,共12页
Ground vibration, as the most critical public hazard of blasting, has received much attention from the community. Many countries established national standards to suppress vibration impact on structures, but a world-a... Ground vibration, as the most critical public hazard of blasting, has received much attention from the community. Many countries established national standards to suppress vibration impact on structures, but a world-accepted blasting vibration criterion on human safety is still missing. In order to evaluate human response to the vibration from blasting excavation of a large-scale rock slope in China, this study aims to suggest a revised criterion. The vibration frequency was introduced to improve the existing single-factor (peak particle velocity) standard recommended by the United States Bureau of Mines (USBM). The feasibility of the new criterion was checked based on field vibration monitoring and investigation of human reactions. Moreover, the air overpressure or blast effects on human beings have also been discussed. The result indicates that the entire zone of influence can be divided into three subzones: severe-annoyance, light-annoyance and perception zone according to the revised safety standard. Both the construction company and local residents have provided positive comments on this influence degree assessment, which indicates that the presented criterion is suitable for evaluating human response to nearby blasts. Nevertheless, this specific criterion needs more field tests and verifications before it can be 展开更多
关键词 Construction industry excavation Velocity control
下载PDF