期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
The Design and Analysis of Helium Turbine Expander Impeller with a Given All-Over-Controlled Vortex Distribution
1
作者 刘晓东 付豹 庄明 《Plasma Science and Technology》 SCIE EI CAS CSCD 2014年第3期288-293,共6页
To make the large-scale helium cryogenic system of fusion device EAST (experimen- tal advanced super-conducting tokamak) run stably, as the core part, the helium turbine expander must meet the requirement of refrige... To make the large-scale helium cryogenic system of fusion device EAST (experimen- tal advanced super-conducting tokamak) run stably, as the core part, the helium turbine expander must meet the requirement of refrigeration capacity. However, previous designs were based on one dimension flow to determine the average fluid parameters and geometric parameters of impeller cross-sections, so that it could not describe real physical processes in the internal flow of the tur- bine expander. Therefore, based on the inverse proposition of streamline curvature method in the context of quasi-three-dimensional flows, the all-over-controlled vortex concept was adopted to design the impeller under specified condition. The wrap angle of the impeller blade and the whole flow distribution on the meridian plane were obtained; meanwhile the performance of the designed impeller was analyzed. Thus a new design method is proposed here for the inverse proposition of the helium turbine expander impeller. 展开更多
关键词 helium turbine expander streamline curvature method meridian plane all-over-controlled vortex inverse proposition
下载PDF
The Application and Improvement of Helium Turbines in the EAST Cryogenic System
2
作者 付豹 张启勇 +1 位作者 朱平 成安义 《Plasma Science and Technology》 SCIE EI CAS CSCD 2014年第5期527-531,共5页
The helium cryogenic system supplies supercritical helium cooling capacity at 4.5 K for the superconducting magnets in the EAST superconducting tokamak.Four low-temperature helium turbines are used in the 2 kW helium ... The helium cryogenic system supplies supercritical helium cooling capacity at 4.5 K for the superconducting magnets in the EAST superconducting tokamak.Four low-temperature helium turbines are used in the 2 kW helium refrigeration system,and their performance and reliability are critical for the continuous operation of the tokamak.The turbines were made by the Helium Mechanics Company in Russia.The start-up process is very unstable,easily broken,and thus testing and improvements are needed.In this paper,we analyze the structure of the helium turbine,make improvements,and describe the testing process and results of the improved helium turbines.Some of the operational experiences during the start-up process and tests are also presented. 展开更多
关键词 helium turbines helium refrigerator helium cryogenic system EAST tokamak
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部