Key technologies and equipment for a fully mechanized top-coal caving operation with a large mining height at ultra-thick coal seams 被引量:61
1
作者 Jinhua Wang Bin Yu +4 位作者 Hongpu Kang Guofa Wang Debing Mao Yuntao Liang Pengfei Jiang 《International Journal of Coal Science & Technology》 EI 2015年第2期97-162,共66页
Thick and ultra-thick coal seams are main coal seams for high production rate and high efficiency in Chinese coal mines, which accounts for 44 % of the total minable coal reserve. A fully mechanized top-coal caving mi... Thick and ultra-thick coal seams are main coal seams for high production rate and high efficiency in Chinese coal mines, which accounts for 44 % of the total minable coal reserve. A fully mechanized top-coal caving mining method is a main underground coal extraction method for ultra-thick coal seams. The coal extraction technologies for coal seams less than 14 m thick were extensively used in China. However, for coal seams with thickness greater than 14 m, there have been no reported cases in the world for underground mechanical extraction with safe performance, high efficiency and high coal recovery ratio. To deal with this case, China Coal Technology & Engineering Group, Datong Coal Mine Group, and other 15 organizations in China launched a fundamental and big project to develop coal mining technologies and equipment for coal seams with thicknesses greater than 14 m. After the completion of the project, a coal extraction method was developed for top-coal caving with a large mining height, as well as a ground control theory for ultra-thick coal seams. In addition, the mining technology for top-coal caving with a large mining height, the ground support technology for roadway in coal seams with a large cross-section, and the prevention and control technology for gas and fire hazards were developed and applied. Furthermore, a hydraulic support with a mining height of 5.2 m, a shearer with high reliability, and auxiliary equipment were developed and manufactured. Practical implication on the technologies and equipment developed was successfully completed at the No. 8105 coal face in the Tashan coal mine, Datong, China. The major achievements of the project are summarized as follows: 1. A top-coal caving method for ultra-thick coal seams is proposed with a cutting height of 5 m and a top-coal caving height of 15 m. A structural mechanical model of overlying strata called cantilever beam-articulated rock beam is established. Based on the model, the load resistance of the hydraulic support with a large mining height for top-coal caving method is determined. With the analysis, the movement characteristics of the top coal and above strata are evaluated during top-coal caving operation at the coal face with a large mining height. Furthermore, there is successful development of comprehensive technologies for preventing and controlling spalling of the coal wall, and the top-coal caving technology with high efficiency and high recovery at the top-coal caving face with a large mining height. This means that the technologies developed have overcome the difficulties in strata control, top-coal caving with high efficiency and high coal recovery, and enabled to achieve a production rate of more than 10 Mtpa at a single top-coal caving face with a large mining height in ultra-thick coal seams; 2. A hydraulic support with 5.2 m supporting height and anti-rockburst capacity, a shearer with high reliability, a scraper conveyor with a large power at the back of face, and a large load and long distance headgate belt conveyor have been successfully developed for a top-coal caving face with large mining height. The study has developed the key technologies for improving the reliability of equipment at the coal face and has overcome the challenges in equipping the top-coal caving face with a large mining height in ultra-thick coal seams; 3. The deformation characteristics of a large cross-section roadway in ultra-thick coal seams are discovered. Based on the findings above, a series of bolt materials with a high yielding strength of 500-830 MPa and a high extension ratio, and cable bolt material with a 1 × 19 structure, large tonnage and high extension ratio are developed. In addition, in order to achieve a safe roadway and a fast face advance, installation equipment for high pre-tension bolt is developed to solve the problems with the support of roadway in coal seams for top-coal caving operation with a large mining height; 4. The characteristics of gas distribution and uneven emission at top-coal caving face with large mining height in ultra-thick coal seams are evaluated. With the application of the technologies of gas drainage in the roof, the difficulties in gas control for high intensive top-coal caving mining operations, known as "low gas content, high gas emission", are solved. In addition, large flow-rate underground mobile equipment for making nitrogen are developed to solve the problems with fire prevention and safe mining at a top-coal caving face with large mining height and production rate of more than 10 Mtpa. A case study to apply the developed technologies has been conducted at the No. 8105 face, the Tashan coal mine in Datong, China. The case study demonstrates that the three units of equipment, i.e., the support, shearer and scraper conveyor, are rationally equipped. Average equipment usage at the coal face is 92.1%. The coal recovery ratio at the coal face is up to 88.9 %. In 2011, the coal production at the No. 8105 face reached 10.849 Mtpa, exceeding the target of 10 Mtpa for a topcoal caving operation with large mining height performed by Chinese-made mining equipment. The technologies and equipment developed provide a way for extracting ultra-thick coal seams. Currently, the technologies and equipment are used in 13 mining areas in China including Datong, Pingshuo, Shendong and Xinjiang. With the exploitation of coal resources in Western China, there is great potential for the application of the technologies and equipment developed. 展开更多
关键词 Ultra-thick coal seams top-coal caving mining Large mining height mining method - mining equipment Roadway support Safety guarantee
下载PDF
Technical parameters of drawing and coal-gangue field movements of a fully mechanized large mining height top coal caving working face 被引量:7
2
作者 LIU Chang-you HUANG Bing-xiang WU Feng-feng 《Mining Science and Technology》 EI CAS 2009年第5期549-555,共7页
Under fully mechanized, large mining height top coal caving conditions, the shield beam slope angle of the support increases due to the enlargement of the top coal breaking and caving space. This results in a change o... Under fully mechanized, large mining height top coal caving conditions, the shield beam slope angle of the support increases due to the enlargement of the top coal breaking and caving space. This results in a change of the caving window location and dimensions and, therefore, the granular coal-gangue movement and flows provide new characteristics during top coal caving. The main inferences we draw are as follows. Firstly, after shifting the supports, the caved top coal layer line and the coal gangue boundary line become steeper and are clearly larger than those under common mining heights. Secondly, during the top coal caving procedure, the speed of the coal-gangue flow increases and at the same drawing interval, the distance between the coal-gangue boundary line and the top beam end is reduced. Thirdly, affected by the drawing ratio, the slope angle of the shield beam and the dimensions of the caving window, it is easy to mix the gangue. A rational drawing interval will cause the coal-gangue boundary line to be slightly behind the down tail boom lower boundary. This rational drawing interval under conditions of large mining heights has been analyzed and determined. 展开更多
关键词 large mining height top coal caving coal-gangue movement field coal caving technical parameters coal caving window
下载PDF
Similar material simulation research on movement law of roof over-lying strata in stope of fully mechanized caving face with large mining height 被引量:2
3
作者 ZHU Yong-jian PENG Gang 《Journal of Coal Science & Engineering(China)》 2010年第1期6-10,共5页
Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof over... Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height was studied and show that the roof overlying strata in the stope of a fully mechanized caving face with large mining height can be formed into a stable arch structure; the fracture rock beam is formed resembling a "bond beam", but it has essentially the structure of "multi-span beams" under the big structure of the stable arch. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height is similar to that of the common, fully mechanized caving stope, which is determined by the deformation and instability of the structure of "multi-span beams". But because of the differences between the mining heights, the peak pressure in the stope of a fully mechanized caving face with large mining height is smaller while the affected area of abutment pressure is wider in the front of the working face; this is the obvious difference in abutment pressure between the stope of a fully mechanized caving face with large mining height and that of the common. 展开更多
关键词 fully mechanized caving face with large mining height StopE roof overlyingstrata stable arch structure
下载PDF
Technological optimization of fully mechanized caving mining face with large mining heights 被引量:1
4
作者 Lu-Jia FAN Sheng-Li YANG 《Journal of Coal Science & Engineering(China)》 2013年第3期290-294,共5页
Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order... Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal. 展开更多
关键词 fully mechanized caving face large mining height caving process optimization numerical calculation by PFC top-coal tracking system
下载PDF
Back-and-forth mining for hard and thick coal seams—research about the mining technology for fully mechanized caving working face of Datong Mine
5
作者 金智新 于红 +1 位作者 于斌 宋华岭 《Journal of Coal Science & Engineering(China)》 2005年第2期1-4,共4页
The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the s... The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the systemic design and working face out-play, tried to perfect the caving mining technology of hard-thick coal seams further. 展开更多
关键词 hard and thick coal seams fully mechanized caving working face back-and- forth mining
下载PDF
Development and prospect on fully mechanized mining in Chinese coal mines 被引量:104
6
作者 Jinhua Wang 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期253-260,共8页
Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new de... Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new developments in FMM technology and equipment in Chinese coal mines during past decades are introduced.The automatic FMM technology for thin seams,complete sets of FMM technology with ultra large shear height of 7 m for thick seams,complete sets of fully mechanized top coal caving technology with large shear height for ultra-thick seams of 20 m,complete sets of FMM technology for complex and difficult seams,including steeply inclined seams,soft coal seams with large inclination angle,and the mechanized filling mining technology and equipment are presented.Some typical case studies are also introduced.Finally,the existing problems with the FMM technology are discussed,and prospect of FMM technology and equipment applied in Chinese coal mines is put forward. 展开更多
关键词 Fully mechanized mining mining with large shear height Fully mechanized top coal caving Steeply inclined seam Back filling mining PROSPECT
下载PDF
Systematic principles of surrounding rock control in longwall mining within thick coal seams 被引量:9
7
作者 Jiachen Wang Zhaohui Wang 《International Journal of Mining Science and Technology》 EI CSCD 2019年第1期65-71,共7页
Effective surrounding rock control is a prerequisite for realizing safe mining in underground coal mines.In the past three decades, longwall top-coal caving mining(LTCC) and single pass large height longwall mining(SP... Effective surrounding rock control is a prerequisite for realizing safe mining in underground coal mines.In the past three decades, longwall top-coal caving mining(LTCC) and single pass large height longwall mining(SPLL) found expanded usage in extracting thick coal seams in China. The two mining methods lead to large void space left behind the working face, which increases the difficulty in ground control.Longwall face failure is a common problem in both LTCC and SPLL mining. Such failure is conventionally attributed to low strength and high fracture intensity of the coal seam. However, the stiffness of main components included in the surrounding rock system also greatly influences longwall face stability.Correspondingly, surrounding rock system is developed for LTCC and SPLL faces in this paper. The conditions for simultaneous balance of roof structure and longwall face are put forward by taking the stiffness of coal seam, roof strata and hydraulic support into account. The safety factor of the longwall face is defined as the ratio between the ultimate bearing capacity and actual load imposed on the coal wall.The influences provided by coal strength, coal stiffness, roof stiffness, and hydraulic support stiffness,as well as the movement of roof structure are analyzed. Finally, the key elements dominating longwall face stability are identified for improving surrounding rock control effectiveness in LTCC and SPLL faces. 展开更多
关键词 LONGWALL top coal caving mining Single PASS large height LONGWALL mining SURROUNDING rock system LONGWALL face stability
下载PDF
Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining 被引量:10
8
作者 Jiang Bangyou Wang Lianguo +2 位作者 Lu Yinlong Sun Xiaokang Jin Gan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期645-652,共8页
To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were dev... To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis. The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting condi- tions of the repeated mining face were obtained. The results indicate that when the repeated mining face passes the residual pillars, the sudden instability causes fracturing in the main roof above the old goal and forms an extra-large rock block above the mining face. A relatively stable "Voussoir beam" structure is formed after the advance fracturing of the main roof. When the repeated mining face passes the old goaf, as the large rock block revolves and touches gangue, the rock block will break secondarily under overburden rock loads. An example calculation was performed involving an integrated mine in Shanxi province, results showed that minimum working resistance values of support determined to be reason- able were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf. On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable. 展开更多
关键词 Residual coal after room and pillar mining Repeated mining Fully mechanized caving face Roof control Support resistance
下载PDF
Mating model on production capacity for the system of cutting coal and drawing top-coal in FMMSC
9
作者 翟新献 《Journal of Coal Science & Engineering(China)》 2007年第2期113-117,共5页
Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to par... Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to parallel work with shearer cutting coal, decrease failure ratio of rear scraper conveyor and increase safe production capacity of equipments, based on production technology, set up the mating model of safe production capacity of equipments for the system of drawing top-coal and shearer cutting coal in coal face with sublevel caving. It is mean capability of drawing top-coal adapted to the capability of shearer cutting coal in a working circle in the coal face that was deduced. The type selection of equipment of rear scraper conveyor can be tackled with this mating model. The model was applied in FMMSC in Yangcun Coal Mine, Yima Coal Group of China. With the mating light-equipments, the coal output in coal face attained 1.05 Mt in 2004. It gained better technical-economic benefit. 展开更多
关键词 coal mine coal face fully mechanized mining with sublevel caving (FMMSC) system of curing coal and drawing top-coal mating equipments
下载PDF
厚煤层大采高综放工作面覆岩断裂演化规律研究 被引量:1
10
作者 刘洪涛 罗紫龙 +3 位作者 韩子俊 韩洲 陈小港 彭佳琛 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第3期1-12,共12页
大采高综放开采易形成强烈的矿压显现,上覆岩层的断裂演化规律对工作面安全生产至关重要。以羊场湾煤矿160206工作面为工程背景,运用相似模拟试验、数值模拟和理论分析的综合研究方法,对大采高综放工作面覆岩的断裂过程与覆岩运移规律... 大采高综放开采易形成强烈的矿压显现,上覆岩层的断裂演化规律对工作面安全生产至关重要。以羊场湾煤矿160206工作面为工程背景,运用相似模拟试验、数值模拟和理论分析的综合研究方法,对大采高综放工作面覆岩的断裂过程与覆岩运移规律进行系统研究。研究表明:导水裂隙带内岩层随工作面推进表现为“台阶下沉”,同层岩层下沉趋势沿走向表现为“急剧下降—稳定(最大值)—快速上升—稳定(最小值)”。工作面覆岩运动场由两区分布(加速下沉区、缓慢下沉区)演化为三区分布(加速下沉区、缓慢下沉区、稳定区)。对离层演化与地表下沉规律进行了定量描述,运用理论计算表达式深入地剖析了地表的动态下沉机理及其相关因素。结合相似模拟与数值模拟的试验结果,提出了覆岩断裂演化的形态变化特征:覆岩断裂形态由“单等腰梯形”演化为“双等腰梯形”,表土层影响区由“矩形”演化为“倒梯形”。分析了覆岩中垮落区、离层区、压实区、裂隙富集区的动态演化过程:垮落区逐渐增大至一定程度,高度小幅度降低并趋于稳定,离层区由下至上逐渐发育并随工作面向前移动,离层区逐渐闭合形成压实区,且压实区逐渐增大并最终保持稳定,裂隙富集区位于采空区前后端部并随工作面向前移动。 展开更多
关键词 大采高综放 相似模拟 覆岩运动场 覆岩运移 覆岩断裂形态
下载PDF
大倾角大采高工作面煤壁失稳机理分析
11
作者 张浩 伍永平 解盘石 《中国矿业》 北大核心 2024年第8期107-114,共8页
大倾角大采高工作面煤壁灾变易诱使支架-围岩系统失衡,导致围岩稳定性控制复杂化,故煤壁灾变防控对保障工作面安全生产十分关键,而科学化防控技术的前提是明晰煤壁失稳孕育机制,为此采用数值计算及理论分析法展开研究。研究结果表明:大... 大倾角大采高工作面煤壁灾变易诱使支架-围岩系统失衡,导致围岩稳定性控制复杂化,故煤壁灾变防控对保障工作面安全生产十分关键,而科学化防控技术的前提是明晰煤壁失稳孕育机制,为此采用数值计算及理论分析法展开研究。研究结果表明:大倾角大采高工作面煤壁承压倾向分区异化,下部区域应力集中程度较中部、上部高,集中区范围由下至上减小,垂向中部应力值较低,应力极值及走向位置与回采距具有正相关性,煤壁揭露前后邻域承压环境会突变,且承压态随煤体破坏演变异化,煤体承压结构会由非连续态经压实过渡为类连续状,而后整体移动至阈值后发生破断结构离散化。煤壁前方塑性区随采动作用不同幅度扩展,其稳定性受制于回采距及速度,低速回采、回采距离增加时煤壁稳定性逐步降低,塑性破裂发育区煤体为支承压力等动载、静载主承体,煤壁失稳是支承压力与扰动区内煤体自身抗压性能动态失衡,由运移、变形等承压行为量变诱发煤体结构质变而破断失稳,承压非对称性及多向耦合造成煤壁失稳分区及范围倾向扩展。 展开更多
关键词 大倾角 大采高 煤壁 塑性区 失稳机理
下载PDF
综放工作面围岩控制与智能化放煤技术现状及展望
12
作者 庞义辉 关书方 +2 位作者 姜志刚 白云 李鹏 《工矿自动化》 CSCD 北大核心 2024年第9期20-27,共8页
分析了厚及特厚煤层智能化综放工作面围岩控制技术与智能化放顶煤技术发展现状及存在的问题,从巷道围岩高效支护、工作面超前支护、坚硬特厚顶煤冒放性、液压支架位姿监测及智能化放顶煤5个方面提出了工程实际需求。针对综放工作面实现... 分析了厚及特厚煤层智能化综放工作面围岩控制技术与智能化放顶煤技术发展现状及存在的问题,从巷道围岩高效支护、工作面超前支护、坚硬特厚顶煤冒放性、液压支架位姿监测及智能化放顶煤5个方面提出了工程实际需求。针对综放工作面实现安全、高效、智能化开采存在的技术难题与工程需求,对综放工作面围岩控制技术、智能化放煤技术进行了研究:构建了坚硬特厚煤层顶煤悬臂梁力学模型,研发了提高顶煤冒放性及放出率关键技术,实现了坚硬特厚煤层超大采高综放开采;研发了单元式超前液压支架顶梁可旋转自复位装置,实现了液压支架顶梁根据巷道顶板倾斜角度自动旋转支护,有效提高了单元式超前液压支架对巷道顶底板的适应性;提出了采用巷道支护液压支架替代传统锚网支护结构的思路,具有支护效率高、成本低、节省工作面超前支护等优点;开发了基于立柱与尾梁千斤顶行程的综放液压支架支护姿态监测装置与算法,提高了液压支架支护姿态解算效率与精度;提出了基于透明地质模型、煤量监测装置与煤矸识别装置融合的智能放煤控制方法,可有效解决多夹矸层特厚顶煤智能化放煤技术难题。提出智能地质保障技术、机器视觉精准测量与智能感知技术、综放工作面设备智能精准自适应控制技术、综放工作面数字孪生技术等是智能化综放开采技术与装备的发展趋势。 展开更多
关键词 特厚煤层 综放开采 综放工作面 围岩控制 智能化放煤
下载PDF
多频雷达融合的顶煤结构精准探测技术
13
作者 刘万里 王诚龙 +1 位作者 王浩宇 张学亮 《岩土力学》 EI CAS CSCD 北大核心 2024年第2期633-646,共14页
顶煤结构的准确探测是实现综放智能化开采的重要依据,然而我国煤层结构复杂且内部常含多层夹矸,易影响综放智能化开采的水平。为此,提出一种多频雷达融合的顶煤结构精准探测方法,可提高雷达天线探测深度内的浅部探测精度,同时对顶煤内... 顶煤结构的准确探测是实现综放智能化开采的重要依据,然而我国煤层结构复杂且内部常含多层夹矸,易影响综放智能化开采的水平。为此,提出一种多频雷达融合的顶煤结构精准探测方法,可提高雷达天线探测深度内的浅部探测精度,同时对顶煤内部的结构信息进行解释。主要研究步骤如下:首先,对不同频率的雷达数据进行预处理和空间对齐,建立不同频率雷达数据之间的空间对应关系;其次,利用滑动窗口与小波变换加权融合方法对多频率雷达数据进行处理,根据窗口内各分段小波信号的能量占比确定各频率信号的时变权重值,并引入边缘检测算法来提高小波变换对雷达数据的融合效率,实现多频雷达数据有效融合;最后,根据煤-矸-岩的介电常数差异和电磁波传播的衰减特性,建立顶煤内部回波强度模型,并利用分层识别方法计算出顶煤内部煤-矸-岩之间的界面信息,进而反演出顶煤内部结构(包括顶煤厚度、夹矸厚度及层数、夹矸层间距等)。试验结果表明:所提出的方法能有效地将不同频率雷达数据进行融合,并能有效地探测出顶煤内部结构特征,且顶煤厚度、夹矸厚度和夹矸层间距的探测误差均小于10%。该方法有助于实现顶煤结构的精准探测,为综放智能化开采提供理论技术支撑。 展开更多
关键词 综放开采 多频雷达融合 顶煤结构 探测
下载PDF
6~10 m厚煤层超大采高液压支架及其工作面系统自适应智能耦合控制 被引量:3
14
作者 韩会军 王国法 +3 位作者 许永祥 张金虎 雷声 李艳鹏 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第5期276-288,共13页
厚煤层储量及产量占我国原煤总储量及产量的一半,通过梳理厚煤层开采历史沿革,总结了我国厚煤层开采40年来的技术及装备研发实践,系统分析了以高端大采高液压支架及围岩智能耦合理论为代表的6~10 m大采高综采高效智能化综采技术及装备... 厚煤层储量及产量占我国原煤总储量及产量的一半,通过梳理厚煤层开采历史沿革,总结了我国厚煤层开采40年来的技术及装备研发实践,系统分析了以高端大采高液压支架及围岩智能耦合理论为代表的6~10 m大采高综采高效智能化综采技术及装备研究进展,提出了大采高支护理论及围岩智能耦合控制的突破是厚煤层一次开采高度突破的首要因素,完善的感知体系建立是液压支架自适应支护的前提,数字技术的应用为大采高工作面高效推进及装备智能协同控制提供了新的技术途径;阐明了大采高综放液压支架与围岩耦合关系,剖析了采高增加对硬煤层冒放性的有利影响,提出了基于煤矸识别、放煤机构控制的“纯煤段记忆放煤+煤岩分界模糊段人工反馈式干预放煤”的智能放煤控制策略;分析了大采高开采“采–运”协同智能耦合控制关键技术,构建了基于采煤机牵引速度与刮板输送机链速间联动调节的工作面装备间多机异构耦合自适应协同控制模型;研发了厚煤层开采中10 m超大采高液压支架,分析了厚煤层开采不断突破开采高度极限的新认识,从开采装备、控制系统等方面提出厚煤层一次开采高度的突破的研发方向。 展开更多
关键词 厚煤层开采 高端开采装备 支架–围岩耦合 大采高综采 大采高综放
下载PDF
两次采动影响下小煤柱巷道切顶卸压围岩控制技术 被引量:2
15
作者 李汉璞 张百胜 +2 位作者 郭俊庆 杨依卓 崔俊彪 《矿业安全与环保》 CAS 北大核心 2024年第2期90-97,共8页
为解决多次采动影响下留小煤柱巷道矿压显现剧烈、围岩变形量大的问题,提出了“切顶卸压+顶、帮锚索补强”联合控制技术。以贾家沟煤矿10115运输巷为工程背景,分析了切顶卸压位置、高度与巷道围岩垂直应力分布的关系,给出切顶卸压关键参... 为解决多次采动影响下留小煤柱巷道矿压显现剧烈、围岩变形量大的问题,提出了“切顶卸压+顶、帮锚索补强”联合控制技术。以贾家沟煤矿10115运输巷为工程背景,分析了切顶卸压位置、高度与巷道围岩垂直应力分布的关系,给出切顶卸压关键参数,并研究了留小煤柱巷道在切顶卸压后受两次采动影响下的矿压显现规律。结果表明:切顶卸压后,煤柱上的应力峰值随切顶深度的增加呈指数降低;10115运输巷在邻近工作面一次采动过程中巷道围岩变形依次呈现出无变形、缓慢变形、快速变形和围岩稳定的变化规律,本工作面二次采动过程中巷道围岩变形依次呈现出明显变形和剧烈变形的规律;巷道围岩在受二次采动影响时变形更加剧烈,巷道变形量为一次采动时的3.0~7.5倍。 展开更多
关键词 切顶卸压 小煤柱 矿压显现 二次采动 综放工作面 围岩控制
下载PDF
黄土梁峁地形大采高煤层开采地表移动规律数值模拟研究 被引量:1
16
作者 陈红凯 郭庆彪 +2 位作者 郭广礼 马洪浩 罗锦 《金属矿山》 CAS 北大核心 2024年第4期170-176,共7页
相较于平原地区,黄土梁峁地形下的煤层开采地表移动特征存在明显不同。为分析并揭示梁峁地形下煤层开采地表沉陷异常形变机理,结合现场实测与数值模拟手段,以山西某矿1313工作面为研究对象,对黄土梁峁地形大采高综放开采引起的地表沉陷... 相较于平原地区,黄土梁峁地形下的煤层开采地表移动特征存在明显不同。为分析并揭示梁峁地形下煤层开采地表沉陷异常形变机理,结合现场实测与数值模拟手段,以山西某矿1313工作面为研究对象,对黄土梁峁地形大采高综放开采引起的地表沉陷进行了现场实测,分析了地表移动特征及相关参数取值;利用Rhino软件建立考虑地形的三维模型,导入离散单元法软件3DEC进行数值模拟计算,分析了开采过程中的岩层移动以及梁峁内部塑性破坏演变。研究表明:1313工作面地表移动剧烈,地表下沉起动距小于30 m,超前影响距为73 m,超前影响角为68.7°,走向边界角与上山边界角为40.3°,走向移动角与上山移动角为37.8°,以水平拉伸变形2 mm/m为移动边界的危险移动范围明显大于以下沉值10 mm确定的地表移动盆地范围;利用数值模拟分析黄土梁峁采动滑移过程发现,当工作面自开切眼沿走向回采30 m时,采空区周围岩体应力平衡被打破,顶板在自重以及上覆岩层的载荷作用下产生剪切破坏,采空区周边岩体发生塑性屈服,当工作面回采到120 m时,煤层处于非充分开采阶段,梁峁底部岩体剪切破坏带出现贯通现象,坡体在重力作用下发生向邻空侧的剪切滑移,相较于地表坡度15°的截面,地表坡度18°和22°的截面X轴负方向最大水平移动提升了107.3%与246.5%。 展开更多
关键词 开采沉陷 黄土梁峁 综放开采 黄土滑坡 数值模拟
下载PDF
深部特厚煤层综放沿空掘巷煤柱优化及巷道支护 被引量:1
17
作者 彭林军 吴家遥 +3 位作者 何满潮 宫凯旋 陈东旭 徐顺钰 《西安科技大学学报》 CAS 北大核心 2024年第3期563-574,共12页
为研究深部大采高综放工作面窄煤柱沿空掘巷巷道矿压控制问题,以国能宁煤集团枣泉煤矿2^(-2)特厚煤层130203大采高综放工作面回风巷道为背景,基于实用矿山压力理论,建立了巷道围岩内、外应力场动态结构力学模型,运用理论计算和数值计算... 为研究深部大采高综放工作面窄煤柱沿空掘巷巷道矿压控制问题,以国能宁煤集团枣泉煤矿2^(-2)特厚煤层130203大采高综放工作面回风巷道为背景,基于实用矿山压力理论,建立了巷道围岩内、外应力场动态结构力学模型,运用理论计算和数值计算针对不同尺寸煤柱煤体应力对比分析,将原留设15 m护巷煤柱缩小至5 m进行了煤柱优化。结果表明:在稳定的内应力场掘巷有利于巷道的稳定性,避免了顶板事故及冲击地压相关灾害的发生,现场5 m小煤柱护巷工程应用中,130203回风巷道小煤柱侧变形量为1050 mm,实体煤帮变形量为400 mm,两帮呈现不对称性变形,底板局部底鼓量为1400 mm;深部特厚煤层综放开采沿空掘巷采用5 m小煤柱护巷方案设计正确,极大改善了巷道围岩的应力环境,整体设计满足生产要求,现场应用良好。130203工作面小煤柱沿空掘巷技术成功应用,为矿井开采提供了可靠的科学依据。 展开更多
关键词 深部特厚煤层 大采高综放开采 沿空巷道 煤柱优化 巷道支护
下载PDF
10m超大采高智能化开采关键技术及装备研究
18
作者 韩会军 韩春福 +3 位作者 李明忠 张金虎 张权 曾明胜 《中国煤炭》 北大核心 2024年第7期82-90,共9页
通过调研陕西陕煤曹家滩煤矿业有限公司22煤层赋存条件,探究了超大开采空间矿压显现规律及超高煤壁片帮特点,总结了超大采高综采工作面围岩控制关键技术,分析了超大采高综采工作面端头区支护特点,提出“大梯度+小台阶”端头区过渡模式,... 通过调研陕西陕煤曹家滩煤矿业有限公司22煤层赋存条件,探究了超大开采空间矿压显现规律及超高煤壁片帮特点,总结了超大采高综采工作面围岩控制关键技术,分析了超大采高综采工作面端头区支护特点,提出“大梯度+小台阶”端头区过渡模式,实现了综采工作面中部到两端头巷道6 m高差的短缓过渡及端头区三角煤高回收率支护;基于综采工作面智能化成套开采装备选型配套,研发了适应10 m超大采高综采工作面的成套开采装备,实现了超大开采空间安全防护、特厚煤层高效截割、超大运量煤流顺畅运输;搭建工作面“采支运”一体化智能协同作业控制系统及多源系统集成与数据融合分析平台,支撑10 m超大采高综采工作面安全高效开采。 展开更多
关键词 10 m超大采高 厚及特厚煤层 开采技术及装备 智能化开采
下载PDF
煤矿大采高智能开采工作面设备选型与关键技术研究 被引量:3
19
作者 侯圣双 张超力 +2 位作者 崔涛 武国旺 王志红 《能源与节能》 2024年第1期158-162,207,共6页
针对红庆梁煤矿现有采煤工艺装备效率低、人员劳动强度大、工作面接续紧张等问题,结合近年来国内采煤工艺装备发展应用情况,对采煤机关键技术、液压支架、刮板输送机、选型配套等进行了新工作面设计分析。分析总结了自动化顺槽集中控制... 针对红庆梁煤矿现有采煤工艺装备效率低、人员劳动强度大、工作面接续紧张等问题,结合近年来国内采煤工艺装备发展应用情况,对采煤机关键技术、液压支架、刮板输送机、选型配套等进行了新工作面设计分析。分析总结了自动化顺槽集中控制、工作面视频监控自动跟机切换、工作面自动调直等大采高智能采掘工作面应用的关键技术。实践应用结果表明,新型智能采掘工作面减员增效效果明显,为企业带来了明显的经济效益和社会效益。 展开更多
关键词 大采高 采煤工艺 智能化开采 设备选型配套
下载PDF
深埋薄基岩下区段煤柱工作面综放开采可行性研究
20
作者 李红军 樊旋 +2 位作者 李小磊 郇恒恒 李松涛 《煤炭技术》 CAS 2024年第5期114-118,共5页
赵固二矿在对二1煤层回采过程中,使用分层开采并留设较宽的区段煤柱。矿井拟对区段煤柱进行回采,以赵固二矿二盘区里侧煤柱工作面为工程背景,通过岩石物理力学测试、煤体裂隙观测及顶煤冒放性评价对工作面综放开采适应性进行综合分析,... 赵固二矿在对二1煤层回采过程中,使用分层开采并留设较宽的区段煤柱。矿井拟对区段煤柱进行回采,以赵固二矿二盘区里侧煤柱工作面为工程背景,通过岩石物理力学测试、煤体裂隙观测及顶煤冒放性评价对工作面综放开采适应性进行综合分析,得出煤柱受临近工作面回采影响,裂隙发育,顶煤强度低,顶煤冒放性评价为好;针对深埋薄基岩等条件下煤柱综放开采进行了安全论证,得到了二盘区里侧煤柱工作面可实施综采放顶煤工艺的结论,并进行现场工业性试验,目前已实现安全回采。该研究可为实现区段煤柱综放开采提供成熟方案。 展开更多
关键词 力学测试 裂隙 顶煤冒放性 综放开采 区段煤柱
下载PDF