期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
A novel optical burst switching architecture for high speed networks 被引量:2
1
作者 Amit Kumar Garg R.S.Kaler 《Chinese Optics Letters》 SCIE EI CAS CSCD 2008年第11期807-811,共5页
A novel optical burst switching (OBS) high speed network architecture has been proposed. To verify its feasibility and evaluate its performance, just-enough-time (JET) signaling has been considered as a high perfo... A novel optical burst switching (OBS) high speed network architecture has been proposed. To verify its feasibility and evaluate its performance, just-enough-time (JET) signaling has been considered as a high performance protocol. In the proposed architecture, to avoid burst losses, firstly, a short-prior- confirmation-packet (SPCP) is sent over the control channel that simulates the events that the actual packet will experience. Once SPCP detects a drop at any of the intermediate nodes, the actual packet is not sent but the process repeats. In order to increase network utilization, cost effectiveness and to overcome some limitations of conventional OBS, inherent codes (e.g., orthogonal optical codes (OOC)), which are codified only in intensity, has been used. Through simulations, it shows that a decrease in burst loss probability, cost effectiveness and a gain in processing time are obtained when optical label processing is used as compared with electronic processing. 展开更多
关键词 NODE OBS A novel optical burst switching architecture for high speed networks LENGTH high
原文传递
Cascading Delays for the High-Speed Rail Network Under Different Emergencies:A Double Layer Network Approach
2
作者 Xingtang Wu Mingkun Yang +3 位作者 Wenbo Lian Min Zhou Hongwei Wang Hairong Dong 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI CSCD 2023年第10期2014-2025,共12页
High-speed rail(HSR) has formed a networked operational scale in China. Any internal or external disturbance may deviate trains’ operation from the planned schedules, resulting in primary delays or even cascading del... High-speed rail(HSR) has formed a networked operational scale in China. Any internal or external disturbance may deviate trains’ operation from the planned schedules, resulting in primary delays or even cascading delays on a network scale. Studying the delay propagation mechanism could help to improve the timetable resilience in the planning stage and realize cooperative rescheduling for dispatchers. To quickly and effectively predict the spatial-temporal range of cascading delays, this paper proposes a max-plus algebra based delay propagation model considering trains’ operation strategy and the systems’ constraints. A double-layer network based breadth-first search algorithm based on the constraint network and the timetable network is further proposed to solve the delay propagation process for different kinds of emergencies. The proposed model could deal with the delay propagation problem when emergencies occur in sections or stations and is suitable for static emergencies and dynamic emergencies. Case studies show that the proposed algorithm can significantly improve the computational efficiency of the large-scale HSR network. Moreover, the real operational data of China HSR is adopted to verify the proposed model, and the results show that the cascading delays can be timely and accurately inferred, and the delay propagation characteristics under three kinds of emergencies are unfolded. 展开更多
关键词 Delay propagation double layer network high speed rail network max-plus algebra
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部