期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
HYDRAULIC ACTIVE GUIDE ROLLER SYSTEM FOR HIGH-SPEED ELEVATOR BASED ON FUZZY CONTROLLER 被引量:1
1
作者 FENG Yonghui ZHANG Jianwu 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2007年第5期68-73,共6页
Increase of elevator speed brings about amplified vibrations of high-speed elevator. In order to reduce the horizontal vibrations of high-speed elevator, a new type of hydraulic active guide roller system based on fuz... Increase of elevator speed brings about amplified vibrations of high-speed elevator. In order to reduce the horizontal vibrations of high-speed elevator, a new type of hydraulic active guide roller system based on fuzzy logic controller is developed. First the working principle of the hydraulic guide system is introduced, then the dynamic model of the horizontal vibrations for elevator cage with active guide roller system and the mathematical model of the hydraulic system are given. A fuzzy logic controller for the hydraulic system is designed to control the hydraulic actuator. To improve the control performance, preview compensation for the controller is provided. Finally, simulation and experiments are executed to verify the hydraulic active guide roller system and the control strategy. Both the simulation and experimental results indicate that the hydraulic active guide roller system can reduce the horizontal vibrations of the elevator effectively and has better effects than the passive one, and the fuzzy logic controller with preview compensation can give superior control performance. 展开更多
关键词 high-speed elevator Horizontal vibrations Hydraulic active guide roller system Fuzzy logic control
下载PDF
Ground-borne vibration generated by high-speed train viaduct systems in soft-upper/hard-lower rock strata 被引量:4
2
作者 XING Meng-ting WANG Ping +2 位作者 ZHAO Cai-you WU Xue KANG Xiu-shan 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第7期2140-2157,共18页
An experimental study and theoretical analysis were carried out to explore the ground-borne vibration generated by elevated high-speed railway in rock strata.Taking a typical rail line constructed on rock area in Chin... An experimental study and theoretical analysis were carried out to explore the ground-borne vibration generated by elevated high-speed railway in rock strata.Taking a typical rail line constructed on rock area in China as the research object,a set of field tests was performed on Rizhao-Lankao High-Speed Railway,the bridge and ground vibrations were measured as trains passed at 330−340 km/h,then the transferring law and spatial distribution under individual frequencies were investigated.The experiment results indicate that the bridge frequency spectrum exhibited relatively high-frequency vibration peaks caused by short-wavelength irregularity;ground vibration farther than 30 m away can be amplified with a higher frequency and numerous components.Furthermore,the wave propagation equation of a stratified rock strata was established based on direct-stiffness method to explore the vibration attenuation rules via frequency-domain analysis.It is found that the rock area has a weaker correlation between vibration transmissibility and frequency,thicker and harder rock strata loss their vibration attenuation capacity.It can be concluded that the high-speed railways induced vibration on rock strata shows a wide frequency band and large amplitude,the design of reducing vibration aimed at specific frequency is important according to next more detailed numerical study. 展开更多
关键词 rock stratum vibration and wave elevated high-speed railways in situ test transferring law
下载PDF
超高层建筑高速穿梭电梯辅助疏散的可行性 被引量:8
3
作者 朱惠军 《消防科学与技术》 CAS 北大核心 2012年第9期931-934,共4页
结合武汉绿地中心塔楼项目,采用人员仿真软件对传统疏散体系及新型疏散体系进行模拟,在提供定量可视化结果对比的基础上,分析采用高速穿梭电梯作为辅助疏散的新型疏散体系的可行性。建立仅用楼梯疏散和利用电梯辅助疏散的场景模拟疏散,... 结合武汉绿地中心塔楼项目,采用人员仿真软件对传统疏散体系及新型疏散体系进行模拟,在提供定量可视化结果对比的基础上,分析采用高速穿梭电梯作为辅助疏散的新型疏散体系的可行性。建立仅用楼梯疏散和利用电梯辅助疏散的场景模拟疏散,疏散时间分别为2h27min和1h49min。针对火灾时使用电梯的主要危害分别提出辅助疏散电梯分区设计及电梯井本身的防火、防烟、防水、供电保障、应急管理等多方面的改进措施。 展开更多
关键词 超高层建筑 高速穿梭电梯 疏散模拟 应急疏散预案
下载PDF
NUMERICAL SIMULATION OF UNSTEADY TURBULENT FLOW INDUCED BY TWO-DIMENSIONAL ELEVATOR CAR AND COUNTER WEIGHT SYSTEM 被引量:6
4
作者 SHI Li-qun LIU Ying-zheng JIN Si-yu CAO Zhao-min 《Journal of Hydrodynamics》 SCIE EI CSCD 2007年第6期720-725,共6页
A two-dimensional model of unsteady turbulent flow induced by high-speed elevator system was established in the present study. The research was focused on the instantaneous variation of the aerodynamic force on the ca... A two-dimensional model of unsteady turbulent flow induced by high-speed elevator system was established in the present study. The research was focused on the instantaneous variation of the aerodynamic force on the car structure during traversing motion of the counter weight in the hoistway. A dynamic meshing method was employed to treat the multi-body motion system to avoid poor distortion of meshes. A comprehensive understanding of this significant aspect was obtained by varying the horizontal gap (δ =0.1m, 0.2m, and 0.3m) between the elevator car and the counter weight, and the moving speed ( U 0= 2m/s, 6m/s, and 10m/s) of the elevator system. A pulsed intensification of the aerodynamic force on the elevator car and subsequent appearance of large valley with negative aerodynamic force were clearly observed in the numerical results. In parameters studied ( δ =0.1m, U 0= 2m/s, 6m/s, 10m/s), the peaked horizontal and vertical forces are respectively 7-11 and 4.3-5.65 times of that when the counter weight is far from the car. These results demonstrated the prominent influence of the traversing counter weight on aerodynamic force on the elevator car, which is of great significance to designers of high-speed elevator system. 展开更多
关键词 high-speed elevator turbulent flow aerodynamic force Computational Fluid Dynamics (CFD)
原文传递
对《高层民用建筑设计防火规范》防排烟部分条款的理解和修改建议
5
作者 贺绮华 计泉 +2 位作者 张力 肖志兰 井洁 《暖通空调》 北大核心 2010年第8期114-117,共4页
结合工程设计中遇到的问题,针对规范第8章部分条款提出修改建议,讨论高层、超高层建筑防烟楼梯间、电梯井加压送风的重要性。
关键词 防烟楼梯间 电梯井 加压送风口 双层百叶送风口
下载PDF
Design of the Minimum Curve Radius of the Hainan East Ring Railway
6
作者 虞先溢 李照宇 李远富 《Journal of Southwest Jiaotong University(English Edition)》 2010年第3期201-205,共5页
The minimum curve radius is one of the most important factors in railway route design. The minimum curve radius of the Hainan East Ring Railway, a newly built high-speed passenger-dedicated line from Haikou to Sanya, ... The minimum curve radius is one of the most important factors in railway route design. The minimum curve radius of the Hainan East Ring Railway, a newly built high-speed passenger-dedicated line from Haikou to Sanya, Hainan, China, was determined through comparative analysis of the design codes both in China and Germany. The results show that the design parameters of the Hainan East Ring Railway in terms of the minimum curve radius determined by China's Temporary Regulations, conform to the ones by German code, and even preserve some capacity for speeds up to 300 km/h in the future. Additionally, the related counter- measures for speed increases in this line were proposed on the premise of the safety and riding comfort of the trains. 展开更多
关键词 high-speed railway Minimum curve radius Target speed elevATION
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部