Since the launch of the reform and openingin China, the civil aviation service inJiangsu Province has been developed. ByJune 1996, nine airports scattered across theprovince in Nanjing Dajiaochang, WuxiShuofang, Chang...Since the launch of the reform and openingin China, the civil aviation service inJiangsu Province has been developed. ByJune 1996, nine airports scattered across theprovince in Nanjing Dajiaochang, WuxiShuofang, Changzhou Benniu, Nantong Xing-dong and Rugao, Lianyungang Baitapu,Xuzhou Daguozhuang and Yancheng andSuzhou Guangfu have opened services tothe public. Apart from Yancheng展开更多
The reasonable calculation of ground appropriateness index in permafrost region is the precondition of highway route design in permafrost region. The theory of knowledge base and fuzzy mathematics are applied, and the...The reasonable calculation of ground appropriateness index in permafrost region is the precondition of highway route design in permafrost region. The theory of knowledge base and fuzzy mathematics are applied, and the damage effect of permafrost is considered in the paper. Based on the idea of protecting permafrost the calculation method of ground appro- priateness index is put forward. Firstly, based on the actual environment conditions, the paper determines the factors affecting the road layout in permafrost areas by qualitative and quantitative analysis, including the annual slope, the average annual ground temperature of permafrost, the amount of ice in frozen soil, and the interference engineering. Secondly, based on the knowledge base theory and the use of Delphi method, the paper establishes the knowledge base, the rule base of the permafrost region and inference mechanism. The method of selecting the road in permafrost region is completed and realized by using the software platform. Thirdly, taking the Tuotuo River to Kaixin Mountain section of permafrost region as an example, the application of the method is studied by using an ArcGIS platform. Results show that the route plan determined by the method of selecting the road in perma-frost region can avoid the high temperature and high ice content area, conform the terrain changes and evade the heat disturbance among the existing projects. A reasonable route plan can be achieved, and it can provide the basis for the next engineering construction.展开更多
The problem of designing integrated traffic control strategies for highway networks with the use of route guidance, ramp metering is considered. The highway network is simulated using a first order macroscopic model c...The problem of designing integrated traffic control strategies for highway networks with the use of route guidance, ramp metering is considered. The highway network is simulated using a first order macroscopic model called LWR model which is a mathematical traffic flow model that formulates the relationships among traffic flow characteristics in terms of density, flow, and mean speed of the traffic stream. An integrated control algorithm is designed to solve the proposed problem, based on the inverse control technique and variable structure control(super twisting sliding mode). Three case studies have been tested in the presence of an on-ramp at each alternate route and where there is a capacity constraint in the network. In the first case study, there is no capacity constraint at either upstream or downstream of the alternate routes and the function of the proposed algorithm is only to balance the traffic flow on the alternate routes. In the second case study, there is capacity constraint at downstream of alternate routes. The proposed algorithm aims to avoid congestion on the main road and balance the traffic flow on the alternate routes. In the last case study, there is capacity constraint at upstream of alternate routes. The objective of proposed algorithm is to avoid congestion on the main road and to balance the traffic flow on the alternate routes. The obtained results show that the proposed algorithms can establish user equilibrium between two alternate routes even when the on-ramps, located at alternate routes, have different traffic demands.展开更多
文摘Since the launch of the reform and openingin China, the civil aviation service inJiangsu Province has been developed. ByJune 1996, nine airports scattered across theprovince in Nanjing Dajiaochang, WuxiShuofang, Changzhou Benniu, Nantong Xing-dong and Rugao, Lianyungang Baitapu,Xuzhou Daguozhuang and Yancheng andSuzhou Guangfu have opened services tothe public. Apart from Yancheng
基金support provide by Special Fund for Basic Scientific Research of Central Col leges, Changan University (310821172002)Postdoctoral Science Foundation of China (2016M590915)+2 种基金Basic Research Func of Ministry of Transportation (2014319812170)National Sci Tech Support Plan (2014BAG05B01)Basic Research Program of Natural Science in Shaanxi Province (S2017-ZRJJ-MS0603)
文摘The reasonable calculation of ground appropriateness index in permafrost region is the precondition of highway route design in permafrost region. The theory of knowledge base and fuzzy mathematics are applied, and the damage effect of permafrost is considered in the paper. Based on the idea of protecting permafrost the calculation method of ground appro- priateness index is put forward. Firstly, based on the actual environment conditions, the paper determines the factors affecting the road layout in permafrost areas by qualitative and quantitative analysis, including the annual slope, the average annual ground temperature of permafrost, the amount of ice in frozen soil, and the interference engineering. Secondly, based on the knowledge base theory and the use of Delphi method, the paper establishes the knowledge base, the rule base of the permafrost region and inference mechanism. The method of selecting the road in permafrost region is completed and realized by using the software platform. Thirdly, taking the Tuotuo River to Kaixin Mountain section of permafrost region as an example, the application of the method is studied by using an ArcGIS platform. Results show that the route plan determined by the method of selecting the road in perma-frost region can avoid the high temperature and high ice content area, conform the terrain changes and evade the heat disturbance among the existing projects. A reasonable route plan can be achieved, and it can provide the basis for the next engineering construction.
文摘The problem of designing integrated traffic control strategies for highway networks with the use of route guidance, ramp metering is considered. The highway network is simulated using a first order macroscopic model called LWR model which is a mathematical traffic flow model that formulates the relationships among traffic flow characteristics in terms of density, flow, and mean speed of the traffic stream. An integrated control algorithm is designed to solve the proposed problem, based on the inverse control technique and variable structure control(super twisting sliding mode). Three case studies have been tested in the presence of an on-ramp at each alternate route and where there is a capacity constraint in the network. In the first case study, there is no capacity constraint at either upstream or downstream of the alternate routes and the function of the proposed algorithm is only to balance the traffic flow on the alternate routes. In the second case study, there is capacity constraint at downstream of alternate routes. The proposed algorithm aims to avoid congestion on the main road and balance the traffic flow on the alternate routes. In the last case study, there is capacity constraint at upstream of alternate routes. The objective of proposed algorithm is to avoid congestion on the main road and to balance the traffic flow on the alternate routes. The obtained results show that the proposed algorithms can establish user equilibrium between two alternate routes even when the on-ramps, located at alternate routes, have different traffic demands.