Focusing on the extending length restriction of the completion screen pipe resistance running into ultra-short radius horizontal well,this paper proposed technology of hydraulic drive completion tubular string running...Focusing on the extending length restriction of the completion screen pipe resistance running into ultra-short radius horizontal well,this paper proposed technology of hydraulic drive completion tubular string running into ultra-short radius horizontal well.Innovative hydraulic drive tools and string structure are designed,which are composed of guide tubing,hydraulic drive tubing and non-metallic completion screen pipe from inside to outside.A novel mechanical-hydraulic coupling model is established.Based on the wellbore structure of an ultra-short radius horizontal well for deep coalbed methane,the numerical calculations of force and hydraulic load on tubular strings were accomplished by the mechanical-hydraulic coupling model.The results show that the extending length of completion tubular string with the hydraulic drive is 17 times that of conventional completion technology under the same conditions.The multi-factor orthogonal design is adopted to analyze the numerical calculations,and the results show that the extending length of the completion tubular string is mainly affected by the completion tubular string structure and the friction coefficient between the non-metallic composite continuous screen pipe and the wellbore.Two series of hydraulic drive completion tubular string structures suitable for ultra-short radius horizontal wells under different conditions are optimized,with the extending limits of 381 m and 655 m,respectively.These researches will provide theoretical guidance for design and control of hydraulic drive non-metallic composite continuous completion screen pipe running into ultra-short radius horizontal wells.展开更多
The objective of the present experimental work is to investigate the performance of a wrapped screen heat pipe for atmospheric air heating to compare with the limits of this pipe. The experiment was conducted using co...The objective of the present experimental work is to investigate the performance of a wrapped screen heat pipe for atmospheric air heating to compare with the limits of this pipe. The experiment was conducted using copper pipe material and acetone as working fluid at different vapor temperatures. The testing also consists of a heater, a blower for heat removal (condenser), temperature measuring device, a vapor temperature probe, acetone charging system, and a vacuum pump. The copper outside diameterof the pipe is 0.022 m, with a total length of 0.6 m. The results showed that the pipe wall temperature (Tw) for a wrapped screen heat pipe has a rapid increase and takes 50 min to reach steady state at (Q = 63 W). The vapour temperature of working fluid increases as the heat load increases at constant air velocity. It was also been found that the range of vapour temperature deceases as the filling ratio increases that means the increasing of the filling ratio results the decrease of the maximum vapour temperature and the variation in the vapour temperature. The best recorded filling ratio is 0.6 which has the lowest vapour temperature at highest heat load. The maximum heat transport limit for this pipe is 80 W and the maximum temperature difference for air is 5。C.展开更多
温度的变化对导波传播有着很大的影响,但温度与其他因素对导波造成的复合误差却少有研究,而管道常常处于各种严峻环境下,对其进行温度变化与不同工况之间的复合误差研究十分有必要。本文就充水管道与温度变化之间的关系,提出了一种新的...温度的变化对导波传播有着很大的影响,但温度与其他因素对导波造成的复合误差却少有研究,而管道常常处于各种严峻环境下,对其进行温度变化与不同工况之间的复合误差研究十分有必要。本文就充水管道与温度变化之间的关系,提出了一种新的补偿思路,即用信号集匹配相近的基线信号,同时判断充水信息,再用基线拉伸法拉伸监测信号中的时域部分,最后减去相对应的最大残余幅值与充水偏差,完成信号的复合误差补偿。通过COMSOL模拟仿真分析该方法的可行性,同时设计实验验证效果,实验结果表明,进行补偿后的残余信号平均幅值比进行补偿后的残余信号平均幅值低约5 d B,即该方法能够有效的补偿由变温与充水共同造成的复合性误差。展开更多
基金Supported by the Innovative Research Group Project of China National Natural Science Foundation(51821092)Key Project of China National Natural Science Foundation(U1762214).
文摘Focusing on the extending length restriction of the completion screen pipe resistance running into ultra-short radius horizontal well,this paper proposed technology of hydraulic drive completion tubular string running into ultra-short radius horizontal well.Innovative hydraulic drive tools and string structure are designed,which are composed of guide tubing,hydraulic drive tubing and non-metallic completion screen pipe from inside to outside.A novel mechanical-hydraulic coupling model is established.Based on the wellbore structure of an ultra-short radius horizontal well for deep coalbed methane,the numerical calculations of force and hydraulic load on tubular strings were accomplished by the mechanical-hydraulic coupling model.The results show that the extending length of completion tubular string with the hydraulic drive is 17 times that of conventional completion technology under the same conditions.The multi-factor orthogonal design is adopted to analyze the numerical calculations,and the results show that the extending length of the completion tubular string is mainly affected by the completion tubular string structure and the friction coefficient between the non-metallic composite continuous screen pipe and the wellbore.Two series of hydraulic drive completion tubular string structures suitable for ultra-short radius horizontal wells under different conditions are optimized,with the extending limits of 381 m and 655 m,respectively.These researches will provide theoretical guidance for design and control of hydraulic drive non-metallic composite continuous completion screen pipe running into ultra-short radius horizontal wells.
文摘The objective of the present experimental work is to investigate the performance of a wrapped screen heat pipe for atmospheric air heating to compare with the limits of this pipe. The experiment was conducted using copper pipe material and acetone as working fluid at different vapor temperatures. The testing also consists of a heater, a blower for heat removal (condenser), temperature measuring device, a vapor temperature probe, acetone charging system, and a vacuum pump. The copper outside diameterof the pipe is 0.022 m, with a total length of 0.6 m. The results showed that the pipe wall temperature (Tw) for a wrapped screen heat pipe has a rapid increase and takes 50 min to reach steady state at (Q = 63 W). The vapour temperature of working fluid increases as the heat load increases at constant air velocity. It was also been found that the range of vapour temperature deceases as the filling ratio increases that means the increasing of the filling ratio results the decrease of the maximum vapour temperature and the variation in the vapour temperature. The best recorded filling ratio is 0.6 which has the lowest vapour temperature at highest heat load. The maximum heat transport limit for this pipe is 80 W and the maximum temperature difference for air is 5。C.
文摘温度的变化对导波传播有着很大的影响,但温度与其他因素对导波造成的复合误差却少有研究,而管道常常处于各种严峻环境下,对其进行温度变化与不同工况之间的复合误差研究十分有必要。本文就充水管道与温度变化之间的关系,提出了一种新的补偿思路,即用信号集匹配相近的基线信号,同时判断充水信息,再用基线拉伸法拉伸监测信号中的时域部分,最后减去相对应的最大残余幅值与充水偏差,完成信号的复合误差补偿。通过COMSOL模拟仿真分析该方法的可行性,同时设计实验验证效果,实验结果表明,进行补偿后的残余信号平均幅值比进行补偿后的残余信号平均幅值低约5 d B,即该方法能够有效的补偿由变温与充水共同造成的复合性误差。