This article outlines the development of separated zone oil production in foreign countries,and details its development in China.According to the development process,production needs,technical characteristics and adap...This article outlines the development of separated zone oil production in foreign countries,and details its development in China.According to the development process,production needs,technical characteristics and adaptability of oilfields in China,the development of separate zone oil production technology is divided into four stages:flowing well zonal oil production,mechanical recovery and water blocking,hydraulically adjustable zonal oil production,and intelligent zonal production.The principles,construction processes,adaptability,advantages and disadvantages of the technology are introduced in detail.Based on the actual production situation of the oilfields in China at present,three development directions of the technology are proposed.First,the real-time monitoring and adjustment level of separated zone oil production needs to be improved by developing downhole sensor technology and two-way communication technology between ground and downhole and enhancing full life cycle service capability and adaptability to horizontal wells.Second,an integrated platform of zonal oil production and management should be built using a digital artificial lifting system.Third,integration of injection and production should be implemented through large-scale application of zonal oil production and zonal water injection to improve matching and adjustment level between the injection and production parameters,thus making the development adjustment from"lag control"to"real-time optimization"and improving the development effect.展开更多
This study describes an automatic berthing system with mooring lines. It is designed to be berthed by using mooring device on the upper deck of a ship. It is to berth once maintaining parallel with the quay by control...This study describes an automatic berthing system with mooring lines. It is designed to be berthed by using mooring device on the upper deck of a ship. It is to berth once maintaining parallel with the quay by controlling both forward and aft breast lines. Berthing method is used through length adjustment of mooring lines connected between ship and quay by controlling the angular velocity and the torque of hydraulic motor in mooring device. The study is conducted under three changing conditions of draft, such as even-keel, rise of the gravity center and trim to stern. Variables affecting berthing stability are determined based on the control performance of each condition. Bond graphs method is used to model the system. Controller is designed as PID control method of reference-model algorithm. The control program is composed of synchronous control system based on the equations derived with the numerical analysis. The tank test is conducted to verify the usefulness of the control program.展开更多
基金Supported by the National Key Research and Development Program of China(2018YFE0196000)National Science and Technology Major Project of China(2016ZX05010-006)CNPC Scientific Research and Technical Development Project(2019B-4113)
文摘This article outlines the development of separated zone oil production in foreign countries,and details its development in China.According to the development process,production needs,technical characteristics and adaptability of oilfields in China,the development of separate zone oil production technology is divided into four stages:flowing well zonal oil production,mechanical recovery and water blocking,hydraulically adjustable zonal oil production,and intelligent zonal production.The principles,construction processes,adaptability,advantages and disadvantages of the technology are introduced in detail.Based on the actual production situation of the oilfields in China at present,three development directions of the technology are proposed.First,the real-time monitoring and adjustment level of separated zone oil production needs to be improved by developing downhole sensor technology and two-way communication technology between ground and downhole and enhancing full life cycle service capability and adaptability to horizontal wells.Second,an integrated platform of zonal oil production and management should be built using a digital artificial lifting system.Third,integration of injection and production should be implemented through large-scale application of zonal oil production and zonal water injection to improve matching and adjustment level between the injection and production parameters,thus making the development adjustment from"lag control"to"real-time optimization"and improving the development effect.
基金financially supported by the Post Innovation Program of the Fisheries Science Institute of Chonnam National University
文摘This study describes an automatic berthing system with mooring lines. It is designed to be berthed by using mooring device on the upper deck of a ship. It is to berth once maintaining parallel with the quay by controlling both forward and aft breast lines. Berthing method is used through length adjustment of mooring lines connected between ship and quay by controlling the angular velocity and the torque of hydraulic motor in mooring device. The study is conducted under three changing conditions of draft, such as even-keel, rise of the gravity center and trim to stern. Variables affecting berthing stability are determined based on the control performance of each condition. Bond graphs method is used to model the system. Controller is designed as PID control method of reference-model algorithm. The control program is composed of synchronous control system based on the equations derived with the numerical analysis. The tank test is conducted to verify the usefulness of the control program.