In the practice of mining shallow buried ultra-close seams,support failure tends to occur during the process of longwall undermining beneath two layers of room mining goaf(TLRMG).In this paper,the factors causing supp...In the practice of mining shallow buried ultra-close seams,support failure tends to occur during the process of longwall undermining beneath two layers of room mining goaf(TLRMG).In this paper,the factors causing support failure are summarized into geology and mining technology.Combining column lithology and composite beam theory,the key stratum of the rock strata is determined.A finite element numerical simulation is used to analyze the overlying load distribution rule of the main roof for different plane positions of the upper and lower room mining pillars.The tributary area theory(TAT)is adopted to analyze the vertical load distribution of each pillar,and dynamic models of coal pillar instability and main roof fracture are established.Through key block instability analysis,two critical moments are established,of which critical moment A has the greater dynamic load strength.Great economic losses and safety hazards are created by the dynamic load of the fracturing of the main roof.To reduce these negative effects,a method of pulling out supports is developed and two alternative measures for support failure prevention are proposed:reinforcing stope supports in conjunction with reducing mining height,or drilling ground holes to pre-split the main roof.Based on a comprehensive consideration of economic factors and the two categories of support failure causes,the method of reinforcing stope supports while reducing mining height was selected for use on the mining site.展开更多
Long piles of the ocean oil platform are usually manufactured as the integration of several segments, which have to be assembled one by one during installation. During pile driving, excessive pore pressure will build ...Long piles of the ocean oil platform are usually manufactured as the integration of several segments, which have to be assembled one by one during installation. During pile driving, excessive pore pressure will build up in such a high level that hydraulic fracturing in the soil round the pile may take place, which will cause the soil to consolidate much faster during pile extension period. Consequently, after pile extension, the soil strength will recover to some extent and the driving resistance will increase considerably, which makes restarting driving the pile very difficult and even causes refusal. A finite element (FE) analysis procedure is presented for judging the risk of refusal by estimating the blow counts after pile extension, in which the regain of soil strength is considered. A case analysis in Bohai Gulf is performed using the proposed orocedure to exolain the nile refusal phenomenon.展开更多
基金supported by the National Natural Science Foundation of China (No. 51374200)
文摘In the practice of mining shallow buried ultra-close seams,support failure tends to occur during the process of longwall undermining beneath two layers of room mining goaf(TLRMG).In this paper,the factors causing support failure are summarized into geology and mining technology.Combining column lithology and composite beam theory,the key stratum of the rock strata is determined.A finite element numerical simulation is used to analyze the overlying load distribution rule of the main roof for different plane positions of the upper and lower room mining pillars.The tributary area theory(TAT)is adopted to analyze the vertical load distribution of each pillar,and dynamic models of coal pillar instability and main roof fracture are established.Through key block instability analysis,two critical moments are established,of which critical moment A has the greater dynamic load strength.Great economic losses and safety hazards are created by the dynamic load of the fracturing of the main roof.To reduce these negative effects,a method of pulling out supports is developed and two alternative measures for support failure prevention are proposed:reinforcing stope supports in conjunction with reducing mining height,or drilling ground holes to pre-split the main roof.Based on a comprehensive consideration of economic factors and the two categories of support failure causes,the method of reinforcing stope supports while reducing mining height was selected for use on the mining site.
基金supported by the National Natural Science Foundation of China(51322904 and 51279127)the Program for New Century Excellent Talents in University(HCET-11-0370)
文摘Long piles of the ocean oil platform are usually manufactured as the integration of several segments, which have to be assembled one by one during installation. During pile driving, excessive pore pressure will build up in such a high level that hydraulic fracturing in the soil round the pile may take place, which will cause the soil to consolidate much faster during pile extension period. Consequently, after pile extension, the soil strength will recover to some extent and the driving resistance will increase considerably, which makes restarting driving the pile very difficult and even causes refusal. A finite element (FE) analysis procedure is presented for judging the risk of refusal by estimating the blow counts after pile extension, in which the regain of soil strength is considered. A case analysis in Bohai Gulf is performed using the proposed orocedure to exolain the nile refusal phenomenon.