The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work i...The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work is to study the feasibility of the MHP of Batcheu, to show its contribution to sustainable development in this locality and to prove that it is a profitable project. After study, it appears that the waterfall of Batcheu is favourable to the establishment of a MHP with an installed power of 260 kW with an operating diagram corresponding to a Francis turbine. Given that it is a renewable energy that can supply more than 800 households in rural areas, its contribution to sustainable development is obvious. Its investment cost is estimated at 171,465,396 FCFA. It is a profitable project with a payback time of 7 years and 2 months.展开更多
The production of hydro power from its natural water resources has come to mean more to Norway than to possibly any other country in world. The right to utilize the falling water in the rivers belonged to whoever owne...The production of hydro power from its natural water resources has come to mean more to Norway than to possibly any other country in world. The right to utilize the falling water in the rivers belonged to whoever owned the adjacent ground. The acquisition of water rights is not allowed without a license from the government. Any development is also dependent on a governmental licence. Important conditions such as return of the property to the government without any compensation after 60 years, compulsory delivery of power at production cost and license fees to the local municipalities have been important incentives for the public and political acceptance of hydro power development in Norway during a long period of economic development. Today, Norway is a rich and materially well developed country, and there is no longer any acceptance for further hydro power development. Some of the remaining potential will be utilized for small-scale local developments, but most of it will be incorporated in governmental conservation plans.展开更多
Since Turkey’s economy and population is rapidly growing, Turkey mostly meets its energy demand from imported fossil sources due to the very limited indigenous oil and natural gas resources. However, Turkey has abund...Since Turkey’s economy and population is rapidly growing, Turkey mostly meets its energy demand from imported fossil sources due to the very limited indigenous oil and natural gas resources. However, Turkey has abundant renewable resources especially, hydro power potential to be used for generation of electricity. But only one-third of this significant economical potential could be used. This usage seems insufficient when compared with that of European countries. In order to analyze the potential long term impacts of the hydro power expanding shock on some macroeconomic variables of interest such as GDP, real consumption, real investment, exports, imports, trade balance, and carbon emissions, we developed TurGEM-D, a dynamic multisectoral general equilibrium model of the Turkish economy. Using TurGEM-D, we analyzed the impact of hydro power shock under policy scenario doubling hydro power generation. The simulation results show that doubling hydro power have slightly positive effects on macro indicators and carbon emissions for Turkish economy.展开更多
MHPPs (micro hydro power plants) have become prominent in hydropower plants as a solution to provide the energy demands of the grid. In this study, a new hybrid renewable energy based DC excitation system for synchr...MHPPs (micro hydro power plants) have become prominent in hydropower plants as a solution to provide the energy demands of the grid. In this study, a new hybrid renewable energy based DC excitation system for synchronous generator in the developed MHPP system is introduced. Proposed hybrid DC excitation system consists of solar & hydrogen energy based power generating systems. Hybrid renewable energy based system is used for the excitation of the synchronous generator in the MHPP test system. The renewables are used as a secondary energy source to provide the excitation current to a synchronous generator that generates energy in MHPP. A PV (photovoltaic) array is used as the main source of excitation, and a FC (fuel cell) stack is used for DC excitation in the lack of sunshine. In the experimental setup, an electrical control card is developed, and a microcontroller is used to perform the proposed excitation system. All experimental results obtained from 5 kW rated power MHHP test system. Experimental results show that, the proposed method provides the continuous excitation current, and the operation of the synchronous generator is uninterrupted. The proposed method is also practical and easily implemented for MHPP systems.展开更多
Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated...Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated at around 170 kg. In these mining areas, people still live in a screaming precariousness of which one of the main causes is often the lack of electricity, because of the distance of these localities to the national electricity network. Cameroon has a great hydroelectric potential, but the access rate to electricity is still very low in isolate or rural areas of this country. The objective of this work is to show that it is possible to efficiently exploit gold in isolated areas and contribute to the sustainable development of these localities through the development of micro hydro power (MHP). The mining community of Tikondi in the East Region of Cameroon is the practical case study for an illustration. The results of this study show that the development of the MHP project can be developed with installed power of 87 kW, where the Banki-Michell turbine is recommended according to the Sulzer-Escher Wyss diagram. The investment cost evaluated at 79,832,775 FCFA (1 Euro = 656 FCFA). It is a profitable project with a maximum payback period of 8 years. This project can be easily funded by gold mining activity. That Tikondi’s MHP can make this village becoming attractive for others activities, improving the quality of education of children (there is not any school and lots of them do not go to school), the building of health centers and the quality of life in that locality and therefore contribute to their sustainable development too.展开更多
The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the ...The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the impact of wind power generation on ATC (available transmission capacity) calculation. In order to determine the maximum incremental MW transfer possible between two parts of a power system without violating any specified limits, ATCs are calculated. When calculating ATC values, it is necessary to assume production and consumption pattern in power system. Production of wind power depends on the wind speed, which is a random variable and it is impossible to forecast exactly the production of wind power that is needed for the ATCs calculation. In order to investigate influence of the stochastic wind power production on the ATCs value, computer model of Croatian electric power system is made in Power World Simulator. ATCs are calculated for southern part of Croatian power system in which besides wind power, hydro power plants are only type of power generation. Available wind speed measurements are used as input data for wind power production. The results of the ATC calculation for different scenario of wind power production and location in the Southern Croatian power system are presented and discussed in the paper.展开更多
在中长期水火发电调度中考虑检修计划的影响是目前中长期水火发电调度面临的难题。利用现代整数代数建模技术,建立发电计划和检修计划协调优化的多场景调度模型。在该模型中,鉴于设备检修计划的连续性,在预测场景树的基础上,将场景...在中长期水火发电调度中考虑检修计划的影响是目前中长期水火发电调度面临的难题。利用现代整数代数建模技术,建立发电计划和检修计划协调优化的多场景调度模型。在该模型中,鉴于设备检修计划的连续性,在预测场景树的基础上,将场景节点划分成不同的场景,通过节点和场景关联矩阵,实现多场景下设备检修模型的构建。同时,鉴于中长期调度计划中发电计划和检修计划对时段间隔要求的不同,分别设置电量相关节点和电力相关节点,实现中长期发电计划和检修计划的协调。上述模型是一个大规模混合整数线性规划(mixed integer linear programming,MILP)问题,采用商用MILP求解器进行求解。大规模实际水火电系统的实例分析结果表明,所提模型和方法是可行、有效的。展开更多
To improve the vehicular power and acceleration performance and reduce the shift impact, the study of the characteristics on power shift is necessary. Based on the flexible hydraulic unit of hydro-mechanical transmiss...To improve the vehicular power and acceleration performance and reduce the shift impact, the study of the characteristics on power shift is necessary. Based on the flexible hydraulic unit of hydro-mechanical transmission, this paper explores the feasibility of shift without power interruption. With the four models concerning displacement ratio, rotational speed, rotational torque and power at ideal shift point, the characteristics on power shift in different running conditions are analyzed, and the rules of power shift are revealed. The theoretical analysis and test results show that the hydro-mechanical transmission can shift without power interruption in different running conditions. Furthermore, there exists an ideal shift point in theory, at which point the cycle power in hydro-mechanical transmission can't be generated, and the impact on the system can be reduced to the minimum. However, if before or after this ideal shift point, a cycle power can be generated.展开更多
Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electr...Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electricity we have to rely on renewable energy resources. To address these challenges, wind power generation is among the popular options in the world which is now being considered in Pakistan as well. However unremitting change in wind speed from calm to stormy introduces real challenges. Storing wind energy in batteries during the periods of low demand seems an expensive option, especially when dealing with large scale power generation. Due to incessantly varying nature of wind speed, it is not feasible to rely only on wind power for cheap power production. Also, it is not thriftily possible to construct separate transmission line. However if we integrate wind power with hydro power, we can utilize the maximum possible transmission capacity. Existing hydro power station operating in that area or pumped storage scheme can be used. This paper is an attempt to analyze coordination of wind generation with hydro power in those areas of Pakistan where both wind and hydro power sources exist. In this paper, different issues have been analyzed taking case study of Dargai. This paper is first attempt in Pakistan about integration of wind and hydro power to draw some general conclusions and to point out some areas in which further research can be done.展开更多
Small-hydro power station is often used in remote areas beside a river,but it doesn't match electricity demand so well,especially in dry seasons. A photovoltaic (PV) system with battery is a suitable option to com...Small-hydro power station is often used in remote areas beside a river,but it doesn't match electricity demand so well,especially in dry seasons. A photovoltaic (PV) system with battery is a suitable option to complement the electricity gap. In this paper,a new structure of megawatt-class PV system integrating battery at DC-bus (DC: direct current) is proposed to be used in hydro/PV hybrid power system,and 4 main designing considerations and several key equipments are discussed. In 2011,a 2 MWp PV station with the proposed structure was built up in Yushu,China. From stability analysis,the station shows a strong stability under load cut-in/off and solar irradiance's fluctuation.展开更多
Solar PV is expected to become the most cost-competitive renewable energy owing to the rapidly decreasing cost of the system. On the other hand, hydropower is a high-quality and reliable regulating power source that c...Solar PV is expected to become the most cost-competitive renewable energy owing to the rapidly decreasing cost of the system. On the other hand, hydropower is a high-quality and reliable regulating power source that can be bundled with solar PV to improve the economic feasibility of long-distance transmitted power. In this paper, a quantification model is established taking into account the regulating capacity of the reservoir, the characteristics of solar generation, and cost of hydro and solar PV with long-distance transmission based on the installed capacity ratio of hydro–solar hybrid power. Results indicate that for hydropower stations with high regulating capacity and generation factor of approximately 0.5, a hydro–solar installed capacity ratio of 1:1 will yield overall optimal economic performance, whereas for hydropower stations with daily regulating capacity reservoir and capacity factor of approximately 0.65, the optimal hydro–solar installed capacity ratio is approximately 1:0.3. In addition, the accuracy of the approach used in this study is verified through operation simulation of a hydro–solar hybrid system including ultra high-voltage direct current(UHVDC) transmission using two case studies in Africa.展开更多
Due to the intermittency and instability of Wind-Solar energy and easy compensation of hydropower, this study proposes a Wind-Solar-Hydro power optimal scheduling model. This model is aimed at maximizing the total sys...Due to the intermittency and instability of Wind-Solar energy and easy compensation of hydropower, this study proposes a Wind-Solar-Hydro power optimal scheduling model. This model is aimed at maximizing the total system power generation and the minimum ten-day joint output. To effectively optimize the multi-objective model, a new algorithm named non-dominated sorting culture differential evolution algorithm(NSCDE) is proposed. The feasibility of NSCDE was verified through several well-known benchmark problems. It was then applied to the Jinping Wind-Solar-Hydro complementary power generation system. The results demonstrate that NSCDE can provide decision makers a series of optimized scheduling schemes.展开更多
A comparison analysis based method for computing the water consumption volume needed for electric energy production of optimal scheduling in hydro-thermal power systems is presented in this paper. The electric energy ...A comparison analysis based method for computing the water consumption volume needed for electric energy production of optimal scheduling in hydro-thermal power systems is presented in this paper. The electric energy produced by hydroelectric plants and coal-fired plants is divided into 4 components: potential energy, kinetic energy, water-deep pressure energy and reservoir energy. A new and important concept, reservoir energy, is proposed, based on which is divided into a number of water bodies, for example 3 water bodies, and a reservoir is analyzed in a new way. This paper presents an optimal scheduling solution of elec-tric energy production of hydro-thermal power systems based on multi-factors analytic method, in which some important factors, such as load demand, reservoir in-flow, water consumption volume increment rate of hydroelectric plants or converted from coal-fired plants, and so on are given to model the objective function and the constraints. A study example with three simulation cases is carried out to illustrate flexibility, adapta-bility, applicability of the proposed method.展开更多
The low electricity supply rate is a major cause of underdevelopment in Cameroon. To address this issue, Cameroon outlined a strategy in 2003 aiming for a production capacity of 3000 MW by 2020. However, by 2020, prod...The low electricity supply rate is a major cause of underdevelopment in Cameroon. To address this issue, Cameroon outlined a strategy in 2003 aiming for a production capacity of 3000 MW by 2020. However, by 2020, production had only reached 1040 MW, leading Cameroon to devise a new national energy sector development strategy targeting 5000 MW by 2035. This paper provides an overview of the current state of energy production and projects future output by 2035. Scientific articles and investigative reports on energy production in Cameroon have enabled an assessment of the current electrical energy production. The 2035 production estimate is based on the Energy Sector Development Projects (PDSEN) report in Cameroon. The current production is estimated at around 1600 MW. Considering the ongoing construction of power plants, future projects, and financing delays, achieving the 5000 MW goal by 2035 appears challenging. Nonetheless, diversifying energy production sources could bring Cameroon closer to this target.展开更多
文摘The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work is to study the feasibility of the MHP of Batcheu, to show its contribution to sustainable development in this locality and to prove that it is a profitable project. After study, it appears that the waterfall of Batcheu is favourable to the establishment of a MHP with an installed power of 260 kW with an operating diagram corresponding to a Francis turbine. Given that it is a renewable energy that can supply more than 800 households in rural areas, its contribution to sustainable development is obvious. Its investment cost is estimated at 171,465,396 FCFA. It is a profitable project with a payback time of 7 years and 2 months.
文摘The production of hydro power from its natural water resources has come to mean more to Norway than to possibly any other country in world. The right to utilize the falling water in the rivers belonged to whoever owned the adjacent ground. The acquisition of water rights is not allowed without a license from the government. Any development is also dependent on a governmental licence. Important conditions such as return of the property to the government without any compensation after 60 years, compulsory delivery of power at production cost and license fees to the local municipalities have been important incentives for the public and political acceptance of hydro power development in Norway during a long period of economic development. Today, Norway is a rich and materially well developed country, and there is no longer any acceptance for further hydro power development. Some of the remaining potential will be utilized for small-scale local developments, but most of it will be incorporated in governmental conservation plans.
文摘Since Turkey’s economy and population is rapidly growing, Turkey mostly meets its energy demand from imported fossil sources due to the very limited indigenous oil and natural gas resources. However, Turkey has abundant renewable resources especially, hydro power potential to be used for generation of electricity. But only one-third of this significant economical potential could be used. This usage seems insufficient when compared with that of European countries. In order to analyze the potential long term impacts of the hydro power expanding shock on some macroeconomic variables of interest such as GDP, real consumption, real investment, exports, imports, trade balance, and carbon emissions, we developed TurGEM-D, a dynamic multisectoral general equilibrium model of the Turkish economy. Using TurGEM-D, we analyzed the impact of hydro power shock under policy scenario doubling hydro power generation. The simulation results show that doubling hydro power have slightly positive effects on macro indicators and carbon emissions for Turkish economy.
文摘MHPPs (micro hydro power plants) have become prominent in hydropower plants as a solution to provide the energy demands of the grid. In this study, a new hybrid renewable energy based DC excitation system for synchronous generator in the developed MHPP system is introduced. Proposed hybrid DC excitation system consists of solar & hydrogen energy based power generating systems. Hybrid renewable energy based system is used for the excitation of the synchronous generator in the MHPP test system. The renewables are used as a secondary energy source to provide the excitation current to a synchronous generator that generates energy in MHPP. A PV (photovoltaic) array is used as the main source of excitation, and a FC (fuel cell) stack is used for DC excitation in the lack of sunshine. In the experimental setup, an electrical control card is developed, and a microcontroller is used to perform the proposed excitation system. All experimental results obtained from 5 kW rated power MHHP test system. Experimental results show that, the proposed method provides the continuous excitation current, and the operation of the synchronous generator is uninterrupted. The proposed method is also practical and easily implemented for MHPP systems.
文摘Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated at around 170 kg. In these mining areas, people still live in a screaming precariousness of which one of the main causes is often the lack of electricity, because of the distance of these localities to the national electricity network. Cameroon has a great hydroelectric potential, but the access rate to electricity is still very low in isolate or rural areas of this country. The objective of this work is to show that it is possible to efficiently exploit gold in isolated areas and contribute to the sustainable development of these localities through the development of micro hydro power (MHP). The mining community of Tikondi in the East Region of Cameroon is the practical case study for an illustration. The results of this study show that the development of the MHP project can be developed with installed power of 87 kW, where the Banki-Michell turbine is recommended according to the Sulzer-Escher Wyss diagram. The investment cost evaluated at 79,832,775 FCFA (1 Euro = 656 FCFA). It is a profitable project with a maximum payback period of 8 years. This project can be easily funded by gold mining activity. That Tikondi’s MHP can make this village becoming attractive for others activities, improving the quality of education of children (there is not any school and lots of them do not go to school), the building of health centers and the quality of life in that locality and therefore contribute to their sustainable development too.
文摘The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the impact of wind power generation on ATC (available transmission capacity) calculation. In order to determine the maximum incremental MW transfer possible between two parts of a power system without violating any specified limits, ATCs are calculated. When calculating ATC values, it is necessary to assume production and consumption pattern in power system. Production of wind power depends on the wind speed, which is a random variable and it is impossible to forecast exactly the production of wind power that is needed for the ATCs calculation. In order to investigate influence of the stochastic wind power production on the ATCs value, computer model of Croatian electric power system is made in Power World Simulator. ATCs are calculated for southern part of Croatian power system in which besides wind power, hydro power plants are only type of power generation. Available wind speed measurements are used as input data for wind power production. The results of the ATC calculation for different scenario of wind power production and location in the Southern Croatian power system are presented and discussed in the paper.
文摘在中长期水火发电调度中考虑检修计划的影响是目前中长期水火发电调度面临的难题。利用现代整数代数建模技术,建立发电计划和检修计划协调优化的多场景调度模型。在该模型中,鉴于设备检修计划的连续性,在预测场景树的基础上,将场景节点划分成不同的场景,通过节点和场景关联矩阵,实现多场景下设备检修模型的构建。同时,鉴于中长期调度计划中发电计划和检修计划对时段间隔要求的不同,分别设置电量相关节点和电力相关节点,实现中长期发电计划和检修计划的协调。上述模型是一个大规模混合整数线性规划(mixed integer linear programming,MILP)问题,采用商用MILP求解器进行求解。大规模实际水火电系统的实例分析结果表明,所提模型和方法是可行、有效的。
基金supported by National Key Laboratory of Vehicular Transmission Foundation of China (Grant No. 9140C3402050702)
文摘To improve the vehicular power and acceleration performance and reduce the shift impact, the study of the characteristics on power shift is necessary. Based on the flexible hydraulic unit of hydro-mechanical transmission, this paper explores the feasibility of shift without power interruption. With the four models concerning displacement ratio, rotational speed, rotational torque and power at ideal shift point, the characteristics on power shift in different running conditions are analyzed, and the rules of power shift are revealed. The theoretical analysis and test results show that the hydro-mechanical transmission can shift without power interruption in different running conditions. Furthermore, there exists an ideal shift point in theory, at which point the cycle power in hydro-mechanical transmission can't be generated, and the impact on the system can be reduced to the minimum. However, if before or after this ideal shift point, a cycle power can be generated.
文摘Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electricity we have to rely on renewable energy resources. To address these challenges, wind power generation is among the popular options in the world which is now being considered in Pakistan as well. However unremitting change in wind speed from calm to stormy introduces real challenges. Storing wind energy in batteries during the periods of low demand seems an expensive option, especially when dealing with large scale power generation. Due to incessantly varying nature of wind speed, it is not feasible to rely only on wind power for cheap power production. Also, it is not thriftily possible to construct separate transmission line. However if we integrate wind power with hydro power, we can utilize the maximum possible transmission capacity. Existing hydro power station operating in that area or pumped storage scheme can be used. This paper is an attempt to analyze coordination of wind generation with hydro power in those areas of Pakistan where both wind and hydro power sources exist. In this paper, different issues have been analyzed taking case study of Dargai. This paper is first attempt in Pakistan about integration of wind and hydro power to draw some general conclusions and to point out some areas in which further research can be done.
基金Chinese Academy of Science (No.KGCX2- YW- 366)Ministry of Science and Technology(No. 2011AA05A106)
文摘Small-hydro power station is often used in remote areas beside a river,but it doesn't match electricity demand so well,especially in dry seasons. A photovoltaic (PV) system with battery is a suitable option to complement the electricity gap. In this paper,a new structure of megawatt-class PV system integrating battery at DC-bus (DC: direct current) is proposed to be used in hydro/PV hybrid power system,and 4 main designing considerations and several key equipments are discussed. In 2011,a 2 MWp PV station with the proposed structure was built up in Yushu,China. From stability analysis,the station shows a strong stability under load cut-in/off and solar irradiance's fluctuation.
基金supported by the Global Energy Interconnection Group’s Science & Technology Project “Global Clean Energy Potential Estimating Model: Methodology and Application” (524500180011)
文摘Solar PV is expected to become the most cost-competitive renewable energy owing to the rapidly decreasing cost of the system. On the other hand, hydropower is a high-quality and reliable regulating power source that can be bundled with solar PV to improve the economic feasibility of long-distance transmitted power. In this paper, a quantification model is established taking into account the regulating capacity of the reservoir, the characteristics of solar generation, and cost of hydro and solar PV with long-distance transmission based on the installed capacity ratio of hydro–solar hybrid power. Results indicate that for hydropower stations with high regulating capacity and generation factor of approximately 0.5, a hydro–solar installed capacity ratio of 1:1 will yield overall optimal economic performance, whereas for hydropower stations with daily regulating capacity reservoir and capacity factor of approximately 0.65, the optimal hydro–solar installed capacity ratio is approximately 1:0.3. In addition, the accuracy of the approach used in this study is verified through operation simulation of a hydro–solar hybrid system including ultra high-voltage direct current(UHVDC) transmission using two case studies in Africa.
基金supported by the National Key R&D Program of China (2016YFC0402209)the Major Research Plan of the National Natural Science Foundation of China (No. 91647114)
文摘Due to the intermittency and instability of Wind-Solar energy and easy compensation of hydropower, this study proposes a Wind-Solar-Hydro power optimal scheduling model. This model is aimed at maximizing the total system power generation and the minimum ten-day joint output. To effectively optimize the multi-objective model, a new algorithm named non-dominated sorting culture differential evolution algorithm(NSCDE) is proposed. The feasibility of NSCDE was verified through several well-known benchmark problems. It was then applied to the Jinping Wind-Solar-Hydro complementary power generation system. The results demonstrate that NSCDE can provide decision makers a series of optimized scheduling schemes.
文摘A comparison analysis based method for computing the water consumption volume needed for electric energy production of optimal scheduling in hydro-thermal power systems is presented in this paper. The electric energy produced by hydroelectric plants and coal-fired plants is divided into 4 components: potential energy, kinetic energy, water-deep pressure energy and reservoir energy. A new and important concept, reservoir energy, is proposed, based on which is divided into a number of water bodies, for example 3 water bodies, and a reservoir is analyzed in a new way. This paper presents an optimal scheduling solution of elec-tric energy production of hydro-thermal power systems based on multi-factors analytic method, in which some important factors, such as load demand, reservoir in-flow, water consumption volume increment rate of hydroelectric plants or converted from coal-fired plants, and so on are given to model the objective function and the constraints. A study example with three simulation cases is carried out to illustrate flexibility, adapta-bility, applicability of the proposed method.
文摘The low electricity supply rate is a major cause of underdevelopment in Cameroon. To address this issue, Cameroon outlined a strategy in 2003 aiming for a production capacity of 3000 MW by 2020. However, by 2020, production had only reached 1040 MW, leading Cameroon to devise a new national energy sector development strategy targeting 5000 MW by 2035. This paper provides an overview of the current state of energy production and projects future output by 2035. Scientific articles and investigative reports on energy production in Cameroon have enabled an assessment of the current electrical energy production. The 2035 production estimate is based on the Energy Sector Development Projects (PDSEN) report in Cameroon. The current production is estimated at around 1600 MW. Considering the ongoing construction of power plants, future projects, and financing delays, achieving the 5000 MW goal by 2035 appears challenging. Nonetheless, diversifying energy production sources could bring Cameroon closer to this target.