The DP1500 steel series successfully produced by Baosteel is a marked improvement over the cold-rolled hot-dip galvanized dual-phase steel series.Sufficient parameter data related to forming characteristics are needed...The DP1500 steel series successfully produced by Baosteel is a marked improvement over the cold-rolled hot-dip galvanized dual-phase steel series.Sufficient parameter data related to forming characteristics are needed for the successful application of dual-phase steel series in engineering structures.Therefore,differences in the mech-anical properties,forming limit,hole expansion ratio,and stretch bend limit of the 1.5 GPa ultrahigh-strength steel,including DP1500,QP1500,and MS1500,have been systematically studied.Results show that the DP1500 exhibits good plastic deformation performance and approximately 5% uniform elongation,and its true major strain minimum on the forming limit curve(FLC_(0)) value is approximately 0.083,which is higher and lower than the FLC_(0) values of MS1500 and QP1500 of the same strength grade,respectively.DP1500 also exhibits good flanging and pore expansion capabilities and superior performance to QP1500 and MS1500.The minimum radius-to-thickness(R/T) ratio(1.4) of DP1500 in the 90° bend tests transverse to the rolling direction is between the R/T ratios of MS1500 and the QP1500.Overall,the formability performance of DP1500 is between that of MS1500 and QP1500.Its excellent crash energy absorption and formability performance render it a suitable structural component,and it has been successfully tested and verified on a typical complex ultrahigh-strength steel skeleton structure.展开更多
The influence of the size of pre-cut hole of blank on the formability of cylindrical hole flanging in single point incremental forming(SPIF) was studied. The flange is produced in four stages starting from 45° ...The influence of the size of pre-cut hole of blank on the formability of cylindrical hole flanging in single point incremental forming(SPIF) was studied. The flange is produced in four stages starting from 45° to 90° and employing aluminum as the test material. It is shown that the hole size has significant effects on the stress/strain distribution on the cylindrical flange. The magnitude of hoop strains increases and the flange thickness increases as the hole size increases. Likewise, the von Mises stress reduces with the increasing of hole size. Further, there is a threshold value of hole size(i.e., 80 mm) below which severe stresses occur, which lead to sheet fracturing thus failing the successful forming of cylindrical flange. Moreover, the formability reduces as the hole size is increased above the threshold size. Finally, it is concluded that 80 mm is the threshold size of hole for maximizing the formability of aluminum sheet in incremental hole flanging.展开更多
Conventional no-till seeders should cut or remove crop straw and residue,when in operation and thus present a number of problems,including high performance requirements for the cutting component,high power consumption...Conventional no-till seeders should cut or remove crop straw and residue,when in operation and thus present a number of problems,including high performance requirements for the cutting component,high power consumption,dust raising and interference from intertwined straw.In view of this,in this study,a driving roller dibbling-type no-till seeding and hole-forming(DGR-NT-SHF)system was designed to be capable of penetrating soil and creating holes without requiring any special preparation of the surface covering.The core mechanism of this system consisted of a land wheel-driven driving roller and a duckbill-type roller seeder,which were internally tangent to one another.The rotating roller rolled the straw into a thin layer,and the duckbills extended from the roller and penetrated this thin layer of straw and subsequently formed the holes and planted the seeds.Based on kinematic analysis,a mathematical model was established to depict the relations between the rear angle of the duckbill(α),the front angle of the duckbill(β),the angular velocity of the duckbill-type roller seeder(ω0),the angular velocity of the roller(ω1),and the aperture of the duckbill outlet on the roller(θ).In contrast to a driven roller-type no-till seeding and hole-forming DNR-NT-SHF system,several parameters of the DGR-NT-SHF system were established for planting seeds at a plant spacing that was an integral multiple of 100 mm:the radius of the duckbill-type roller seeder,200 mm;radius of the roller,400 mm;α,23°;andβ,5°.Based on the analysis of the models using the MATLAB Image Processing Module with a relation betweenω1 and the number of outlets on the roller as the constraint,the optimal number of outlets on the roller and theω1/ω0 ratio were determined to be 21 and 4/7,respectively.Kinematic simulation on a digital prototype was performed using computer aided three-dimensional interactive application(CATIA)to observe the motion of the DGR-NT-SHF system,when the duckbills on the duckbill-type roller seeder were open and to determine the locations of the duckbills relative to the outlets.To ensure the duckbills could be successfully opened,the chord length of the outlets was ultimately determined to be 71 mm.The prototype test results showed that the DGR-NT-SHF system met the design requirements and that the operation was straightforward and reliable.In addition,compared to the DNR-NT-SHF system,the DGR-NT-SHF system performed better in penetration and exerted no impact on the duckbills,thus providing an effective technical option for no-till seeding.展开更多
Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and...Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.展开更多
文摘The DP1500 steel series successfully produced by Baosteel is a marked improvement over the cold-rolled hot-dip galvanized dual-phase steel series.Sufficient parameter data related to forming characteristics are needed for the successful application of dual-phase steel series in engineering structures.Therefore,differences in the mech-anical properties,forming limit,hole expansion ratio,and stretch bend limit of the 1.5 GPa ultrahigh-strength steel,including DP1500,QP1500,and MS1500,have been systematically studied.Results show that the DP1500 exhibits good plastic deformation performance and approximately 5% uniform elongation,and its true major strain minimum on the forming limit curve(FLC_(0)) value is approximately 0.083,which is higher and lower than the FLC_(0) values of MS1500 and QP1500 of the same strength grade,respectively.DP1500 also exhibits good flanging and pore expansion capabilities and superior performance to QP1500 and MS1500.The minimum radius-to-thickness(R/T) ratio(1.4) of DP1500 in the 90° bend tests transverse to the rolling direction is between the R/T ratios of MS1500 and the QP1500.Overall,the formability performance of DP1500 is between that of MS1500 and QP1500.Its excellent crash energy absorption and formability performance render it a suitable structural component,and it has been successfully tested and verified on a typical complex ultrahigh-strength steel skeleton structure.
文摘The influence of the size of pre-cut hole of blank on the formability of cylindrical hole flanging in single point incremental forming(SPIF) was studied. The flange is produced in four stages starting from 45° to 90° and employing aluminum as the test material. It is shown that the hole size has significant effects on the stress/strain distribution on the cylindrical flange. The magnitude of hoop strains increases and the flange thickness increases as the hole size increases. Likewise, the von Mises stress reduces with the increasing of hole size. Further, there is a threshold value of hole size(i.e., 80 mm) below which severe stresses occur, which lead to sheet fracturing thus failing the successful forming of cylindrical flange. Moreover, the formability reduces as the hole size is increased above the threshold size. Finally, it is concluded that 80 mm is the threshold size of hole for maximizing the formability of aluminum sheet in incremental hole flanging.
基金Supported by the Postdoctoral Scientific Research Developmental Fund of Heilongjiang Province(LBH-Q14024)
文摘Conventional no-till seeders should cut or remove crop straw and residue,when in operation and thus present a number of problems,including high performance requirements for the cutting component,high power consumption,dust raising and interference from intertwined straw.In view of this,in this study,a driving roller dibbling-type no-till seeding and hole-forming(DGR-NT-SHF)system was designed to be capable of penetrating soil and creating holes without requiring any special preparation of the surface covering.The core mechanism of this system consisted of a land wheel-driven driving roller and a duckbill-type roller seeder,which were internally tangent to one another.The rotating roller rolled the straw into a thin layer,and the duckbills extended from the roller and penetrated this thin layer of straw and subsequently formed the holes and planted the seeds.Based on kinematic analysis,a mathematical model was established to depict the relations between the rear angle of the duckbill(α),the front angle of the duckbill(β),the angular velocity of the duckbill-type roller seeder(ω0),the angular velocity of the roller(ω1),and the aperture of the duckbill outlet on the roller(θ).In contrast to a driven roller-type no-till seeding and hole-forming DNR-NT-SHF system,several parameters of the DGR-NT-SHF system were established for planting seeds at a plant spacing that was an integral multiple of 100 mm:the radius of the duckbill-type roller seeder,200 mm;radius of the roller,400 mm;α,23°;andβ,5°.Based on the analysis of the models using the MATLAB Image Processing Module with a relation betweenω1 and the number of outlets on the roller as the constraint,the optimal number of outlets on the roller and theω1/ω0 ratio were determined to be 21 and 4/7,respectively.Kinematic simulation on a digital prototype was performed using computer aided three-dimensional interactive application(CATIA)to observe the motion of the DGR-NT-SHF system,when the duckbills on the duckbill-type roller seeder were open and to determine the locations of the duckbills relative to the outlets.To ensure the duckbills could be successfully opened,the chord length of the outlets was ultimately determined to be 71 mm.The prototype test results showed that the DGR-NT-SHF system met the design requirements and that the operation was straightforward and reliable.In addition,compared to the DNR-NT-SHF system,the DGR-NT-SHF system performed better in penetration and exerted no impact on the duckbills,thus providing an effective technical option for no-till seeding.
文摘Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.