An industrial park is one of the typical en ergy con sumption schemes in power systems owing to the heavy in dustrial loads and their abilities to resp ond to electricity price cha nges.Therefore,en ergy in tegrati on...An industrial park is one of the typical en ergy con sumption schemes in power systems owing to the heavy in dustrial loads and their abilities to resp ond to electricity price cha nges.Therefore,en ergy in tegrati on in the industrial sector is significant.Accordingly,the concept of industrial virtual power plant(IVPP)has been proposed to deal with such problems.This study demonstrates an IVPP model to man age resources in an eco-i ndustrial park,including en ergy storage systems,dema nd resp onse(DR)resources,and distributed energies.In addition,fuzzy theory is used to cha nge the deterministic system constraints to fuzzy parameters,considering the uncertainty of renewable energy,and fuzzy chance constraints are then set based on the credibility theory.By maximizi ng the daily ben efits of the IVPP owners in day-ahead markets,DR and energy storage systems can be scheduled economically.Therefore,the energy between the grid and IVPP can flow in both directions:the surplus renewable electricity of IVPP can be sold in the market;when the electricity gen erated in side IVPP is not enough for its use,IVPP can also purchase power through the market.Case studies based on three win d-level scenarios dem on strate the efficie nt syn ergies betwee n IVPP resources.The validatio n results indicate that IVPP can optimize the supply and demand resources in in dustrial parks,thereby decarbonizing the power systems.展开更多
With the large-scale development and utilization of renewable energy,industrial flexible loads,as a kind of loadside resource with strong regulation ability,provide new opportunities for the research on renewable ener...With the large-scale development and utilization of renewable energy,industrial flexible loads,as a kind of loadside resource with strong regulation ability,provide new opportunities for the research on renewable energy consumption problem in power systems.This paper proposes a two-layer active power optimization model based on industrial flexible loads for power grid partitioning,aiming at improving the line over-limit problem caused by renewable energy consumption in power grids with high proportion of renewable energy,and achieving the safe,stable and economical operation of power grids.Firstly,according to the evaluation index of renewable energy consumption characteristics of line active power,the power grid is divided into several partitions,and the interzone tie lines are taken as the optimization objects.Then,on the basis of partitioning,a two-layer active power optimization model considering the power constraints of industrial flexible loads is established.The upper-layer model optimizes the planned power of the inter-zone tie lines under the constraint of the minimum peak-valley difference within a day;the lower-layer model optimizes the regional source-load dispatching plan of each resource in each partition under the constraint of theminimumoperation cost of the partition,so as to reduce the line overlimit phenomenon caused by renewable energy consumption and save the electricity cost of industrial flexible loads.Finally,through simulation experiments,it is verified that the proposed model can effectively mobilize industrial flexible loads to participate in power grid operation and improve the economic stability of power grid.展开更多
基金Department of Science and Technology of Guangdong Province(Project 2019B0909011001).
文摘An industrial park is one of the typical en ergy con sumption schemes in power systems owing to the heavy in dustrial loads and their abilities to resp ond to electricity price cha nges.Therefore,en ergy in tegrati on in the industrial sector is significant.Accordingly,the concept of industrial virtual power plant(IVPP)has been proposed to deal with such problems.This study demonstrates an IVPP model to man age resources in an eco-i ndustrial park,including en ergy storage systems,dema nd resp onse(DR)resources,and distributed energies.In addition,fuzzy theory is used to cha nge the deterministic system constraints to fuzzy parameters,considering the uncertainty of renewable energy,and fuzzy chance constraints are then set based on the credibility theory.By maximizi ng the daily ben efits of the IVPP owners in day-ahead markets,DR and energy storage systems can be scheduled economically.Therefore,the energy between the grid and IVPP can flow in both directions:the surplus renewable electricity of IVPP can be sold in the market;when the electricity gen erated in side IVPP is not enough for its use,IVPP can also purchase power through the market.Case studies based on three win d-level scenarios dem on strate the efficie nt syn ergies betwee n IVPP resources.The validatio n results indicate that IVPP can optimize the supply and demand resources in in dustrial parks,thereby decarbonizing the power systems.
基金supported by State Grid Corporation of China Project“Research and Application of Key Technologies for Active Power Control in Regional Power Grid with High Penetration of Distributed Renewable Generation”(5108-202316044A-1-1-ZN).
文摘With the large-scale development and utilization of renewable energy,industrial flexible loads,as a kind of loadside resource with strong regulation ability,provide new opportunities for the research on renewable energy consumption problem in power systems.This paper proposes a two-layer active power optimization model based on industrial flexible loads for power grid partitioning,aiming at improving the line over-limit problem caused by renewable energy consumption in power grids with high proportion of renewable energy,and achieving the safe,stable and economical operation of power grids.Firstly,according to the evaluation index of renewable energy consumption characteristics of line active power,the power grid is divided into several partitions,and the interzone tie lines are taken as the optimization objects.Then,on the basis of partitioning,a two-layer active power optimization model considering the power constraints of industrial flexible loads is established.The upper-layer model optimizes the planned power of the inter-zone tie lines under the constraint of the minimum peak-valley difference within a day;the lower-layer model optimizes the regional source-load dispatching plan of each resource in each partition under the constraint of theminimumoperation cost of the partition,so as to reduce the line overlimit phenomenon caused by renewable energy consumption and save the electricity cost of industrial flexible loads.Finally,through simulation experiments,it is verified that the proposed model can effectively mobilize industrial flexible loads to participate in power grid operation and improve the economic stability of power grid.