The target of integrated construction of comprehensive transportation hub is to integrate the traffic resources,achieve butt joint of pan-regional transportation mode,and finally realize the"seamless connection&q...The target of integrated construction of comprehensive transportation hub is to integrate the traffic resources,achieve butt joint of pan-regional transportation mode,and finally realize the"seamless connection"of the goods and"zero transfer"of the passenger traffic.Relying on the particularity of the geographical location and the convenience of the Yangtze River channel,Luzhou puts forth effort to build a comprehensive transport hub in Southern Sichuan and has made great efforts in traffic infrastructure construction.However,there are still some problems.Combining practice of Luzhou,using the advanced experience of foreign and domestic cities for reference,the paper pointed out that for the sake of constructing a comprehensive transportation hub,we need to build the traffic integration on the basis of the efficiency.Besides,the paper proposed the strategies for construction.展开更多
The target of integrated construction of comprehensive transportation hub is to integrate the traffi c resources, achieve butt jointof pan-regional transportation mode, and fi nally realize the “seamless connection”...The target of integrated construction of comprehensive transportation hub is to integrate the traffi c resources, achieve butt jointof pan-regional transportation mode, and fi nally realize the “seamless connection”of the goods and “zero transfer” of the passenger traffi c.Relying on the particularity of the geographical location and the convenience of the Yangtze River channel, Luzhou puts forth effort to build acomprehensive transport hub in Southern Sichuan and has made great efforts in traffi c infrastructure construction. However, there are still someproblems. Combining practice of Luzhou, using the advanced experience of foreign and domestic cities for reference, the paper pointed out thatfor the sake of constructing a comprehensive transportation hub, we need to build the traffi c integration on the basis of the effi ciency. Besides, thepaper proposed the strategies for construction.展开更多
To investigate the deformation characteristics and instability mechanism of the transportation hub underdownward traversal conditions of the double-track super-large diameter shield tunnel, take the example of Beijing...To investigate the deformation characteristics and instability mechanism of the transportation hub underdownward traversal conditions of the double-track super-large diameter shield tunnel, take the example of BeijingEast Sixth Ring Road into the ground reconstruction project. Using the field experimental monitoring method andnumerical simulation method, after verifying the accuracy of the model, this manuscript begins to unfold theanalysis. The results show that, without any deformation prevention and control measures, The basement raft ofthe underground structure of the transportation hub will produce a deformation difference of 18 mm, and thetensile stress is more than 1.43 MPa, the inhomogeneous deformation and structural cracking will lead tostructural instability and groundwater surges, which seriously affects the safe operation of the transportation hubstation. When control measures are taken, the deformation and stress of the base raft slab of the undergroundstructure of the transportation hub are within the prescribed limits, which can ensure the safe operation of thestation. The displacement of the base slab of the underground structure in the horizontal direction of the crosssection is all pointing to the east, and the overall trend is to shift from the first tunnel to the backward tunnel. Thehorizontal displacement of the base slab in the direction of the tunnel axis all points to the beginning of thecrossing, and the displacement of the slab in the vertical direction is distributed as "rising in the middle andsinking in the surroundings". For a two-lane super-large diameter shield tunnel penetrating an undergroundstructure, there are two mechanical effects: unloading rebound and perimeter rock pressure. The above deformation characteristics are the superposition effect produced by the two, and this fine assessment of the deformation of the raft foundation provides a scientific basis for formulating the deformation control countermeasuresof the crossing project. At the same time, it makes up for the blank of the double-track super-large diameter shieldtunnel down through the transportation hub project.展开更多
Multimodal transportation hubs serve as transfer points with the function of collecting,transferring,and distributing passengers and play a significant role in the entire multimodal transportation network.In an emerge...Multimodal transportation hubs serve as transfer points with the function of collecting,transferring,and distributing passengers and play a significant role in the entire multimodal transportation network.In an emergency,the development of an effective and efficient emergency evacuation strategy to evacuate passengers from multimodal transportation hubs is very important.This paper aims to conduct a comprehensive review on passenger emergency evacuations from multimodal transportation hubs,summarize the achievements,identify gaps in existing literature,thus to lay a solid foundation for future studies.This paper first reviewed studies on evacuee behavior characteristics in emergency evacuations,including pedestrian characteristics,pedestrian behavior characteristics,and pedestrian flow characteristics.Then evacuation models,including pedestrian evacuation models and multimodal transportation evacuation models,were investigated.In addition,a retrospective analysis was carried out for evacuation simulation.It is found that while many studies have been conducted on passenger emergency evacuations from multimodal transportation hubs,most of them focus more on evacuating pedestrians from inside to outside of hub buildings;the studies on evacuation at multimodal transfer points are limited.It is also found that most existing studies tried to establish a general model to handle all types of emergency evacuations;in fact,a model would be more efficient if it is just established for a specific emergency and for a specific type of hubs.Also,existing data collection methods may collect biased data;new data collection methods need to be explored to increase the accuracy of data collection.Future study directions include the evacuation at multimodal transfer points,interactive effects between individual pedestrian behavior and pedestrian group behavior,more specific types of emergency evacuations,more accurate data collection methods,and tradeoffs between cost and benefit in emergency evacuations.展开更多
Taking Hongqiao Integrated Transportation Hub Project as a case, this paper introduces its origin, orientation, development programming, planning and design, road planning, information system planning, air-rail integr...Taking Hongqiao Integrated Transportation Hub Project as a case, this paper introduces its origin, orientation, development programming, planning and design, road planning, information system planning, air-rail integrated transportation planning, disaster prevention planning, and so on.展开更多
This paper, by studying the mechanism of the spatial restructuring of urban development and the effects of comprehensive high-speed transportation hubs on it, analyzes the development trends of comprehensive high-spee...This paper, by studying the mechanism of the spatial restructuring of urban development and the effects of comprehensive high-speed transportation hubs on it, analyzes the development trends of comprehensive high-speed transportation in Changsha-Zhuzhou-Xiangtan Area and the impacts of the growing urban area centered on comprehensive high-speed transportation hubs, like airport and high-speed railway station, on the urban development of this area. It also proposes some strategies for the spatial restructuring of Changsha-Zhuzhou-Xiangtan Area in view of the development of the comprehensive high-speed transportation hubs, like Huanghua Airport and Wuhan-Guangzhou High-speed Railway Station.展开更多
In this paper, a study on four African ports was taken out that all have the ca-pability to become a hub port that can serve the central African region. The paper sort to determine which port was most suitable and por...In this paper, a study on four African ports was taken out that all have the ca-pability to become a hub port that can serve the central African region. The paper sort to determine which port was most suitable and port indexing was the method that was used to evaluate these ports. The ports evaluated were the port of Kribi, the port of Bata, the port of Libreville and the port of Pointe-Noire. There were other models that were also used which included linear regression and linear programming which all contributed to providing the final results of the port with the most suitable potential to serve as a hub port and meaningful results were obtained. The final results showed that the port of Pointe-Noire was the most suitable port to serve the central African region as a hub port.展开更多
文摘The target of integrated construction of comprehensive transportation hub is to integrate the traffic resources,achieve butt joint of pan-regional transportation mode,and finally realize the"seamless connection"of the goods and"zero transfer"of the passenger traffic.Relying on the particularity of the geographical location and the convenience of the Yangtze River channel,Luzhou puts forth effort to build a comprehensive transport hub in Southern Sichuan and has made great efforts in traffic infrastructure construction.However,there are still some problems.Combining practice of Luzhou,using the advanced experience of foreign and domestic cities for reference,the paper pointed out that for the sake of constructing a comprehensive transportation hub,we need to build the traffic integration on the basis of the efficiency.Besides,the paper proposed the strategies for construction.
文摘The target of integrated construction of comprehensive transportation hub is to integrate the traffi c resources, achieve butt jointof pan-regional transportation mode, and fi nally realize the “seamless connection”of the goods and “zero transfer” of the passenger traffi c.Relying on the particularity of the geographical location and the convenience of the Yangtze River channel, Luzhou puts forth effort to build acomprehensive transport hub in Southern Sichuan and has made great efforts in traffi c infrastructure construction. However, there are still someproblems. Combining practice of Luzhou, using the advanced experience of foreign and domestic cities for reference, the paper pointed out thatfor the sake of constructing a comprehensive transportation hub, we need to build the traffi c integration on the basis of the effi ciency. Besides, thepaper proposed the strategies for construction.
文摘To investigate the deformation characteristics and instability mechanism of the transportation hub underdownward traversal conditions of the double-track super-large diameter shield tunnel, take the example of BeijingEast Sixth Ring Road into the ground reconstruction project. Using the field experimental monitoring method andnumerical simulation method, after verifying the accuracy of the model, this manuscript begins to unfold theanalysis. The results show that, without any deformation prevention and control measures, The basement raft ofthe underground structure of the transportation hub will produce a deformation difference of 18 mm, and thetensile stress is more than 1.43 MPa, the inhomogeneous deformation and structural cracking will lead tostructural instability and groundwater surges, which seriously affects the safe operation of the transportation hubstation. When control measures are taken, the deformation and stress of the base raft slab of the undergroundstructure of the transportation hub are within the prescribed limits, which can ensure the safe operation of thestation. The displacement of the base slab of the underground structure in the horizontal direction of the crosssection is all pointing to the east, and the overall trend is to shift from the first tunnel to the backward tunnel. Thehorizontal displacement of the base slab in the direction of the tunnel axis all points to the beginning of thecrossing, and the displacement of the slab in the vertical direction is distributed as "rising in the middle andsinking in the surroundings". For a two-lane super-large diameter shield tunnel penetrating an undergroundstructure, there are two mechanical effects: unloading rebound and perimeter rock pressure. The above deformation characteristics are the superposition effect produced by the two, and this fine assessment of the deformation of the raft foundation provides a scientific basis for formulating the deformation control countermeasuresof the crossing project. At the same time, it makes up for the blank of the double-track super-large diameter shieldtunnel down through the transportation hub project.
基金supported by The National Key Research and Development Program of China(No.2018YFB1601200)
文摘Multimodal transportation hubs serve as transfer points with the function of collecting,transferring,and distributing passengers and play a significant role in the entire multimodal transportation network.In an emergency,the development of an effective and efficient emergency evacuation strategy to evacuate passengers from multimodal transportation hubs is very important.This paper aims to conduct a comprehensive review on passenger emergency evacuations from multimodal transportation hubs,summarize the achievements,identify gaps in existing literature,thus to lay a solid foundation for future studies.This paper first reviewed studies on evacuee behavior characteristics in emergency evacuations,including pedestrian characteristics,pedestrian behavior characteristics,and pedestrian flow characteristics.Then evacuation models,including pedestrian evacuation models and multimodal transportation evacuation models,were investigated.In addition,a retrospective analysis was carried out for evacuation simulation.It is found that while many studies have been conducted on passenger emergency evacuations from multimodal transportation hubs,most of them focus more on evacuating pedestrians from inside to outside of hub buildings;the studies on evacuation at multimodal transfer points are limited.It is also found that most existing studies tried to establish a general model to handle all types of emergency evacuations;in fact,a model would be more efficient if it is just established for a specific emergency and for a specific type of hubs.Also,existing data collection methods may collect biased data;new data collection methods need to be explored to increase the accuracy of data collection.Future study directions include the evacuation at multimodal transfer points,interactive effects between individual pedestrian behavior and pedestrian group behavior,more specific types of emergency evacuations,more accurate data collection methods,and tradeoffs between cost and benefit in emergency evacuations.
文摘Taking Hongqiao Integrated Transportation Hub Project as a case, this paper introduces its origin, orientation, development programming, planning and design, road planning, information system planning, air-rail integrated transportation planning, disaster prevention planning, and so on.
文摘This paper, by studying the mechanism of the spatial restructuring of urban development and the effects of comprehensive high-speed transportation hubs on it, analyzes the development trends of comprehensive high-speed transportation in Changsha-Zhuzhou-Xiangtan Area and the impacts of the growing urban area centered on comprehensive high-speed transportation hubs, like airport and high-speed railway station, on the urban development of this area. It also proposes some strategies for the spatial restructuring of Changsha-Zhuzhou-Xiangtan Area in view of the development of the comprehensive high-speed transportation hubs, like Huanghua Airport and Wuhan-Guangzhou High-speed Railway Station.
文摘In this paper, a study on four African ports was taken out that all have the ca-pability to become a hub port that can serve the central African region. The paper sort to determine which port was most suitable and port indexing was the method that was used to evaluate these ports. The ports evaluated were the port of Kribi, the port of Bata, the port of Libreville and the port of Pointe-Noire. There were other models that were also used which included linear regression and linear programming which all contributed to providing the final results of the port with the most suitable potential to serve as a hub port and meaningful results were obtained. The final results showed that the port of Pointe-Noire was the most suitable port to serve the central African region as a hub port.