It is noted that necessity of further increase of accuracy of GPS positioning systems requires de-velopment of more perfect methods to compensate information losses occurred due to residual ionospheric delay by using ...It is noted that necessity of further increase of accuracy of GPS positioning systems requires de-velopment of more perfect methods to compensate information losses occurred due to residual ionospheric delay by using optimization procedures. According to the conditions of formulated optimization task, the signal/noise ratio in measurements of zenith wet delay depends on the second order ionospheric errors, geographic latitude and day of year. At the same time if we assume that the number of measurements at the fixed geographic site is proportional to geographic latitude and if we accept existence of only two antiphase scenarios for variation of residual ionospheric delay on latitude normed by their specific constant, there should be optimum functional dependence of precipitated water on latitude upon which the quantity of measuring information reaches the maximum. The mathematical grounding of solution of formulated optimization task is given.展开更多
This study examines the impact of employee stock ownership plans(ESOPs)on stock-price informativeness in Chinese stock markets.Its findings indicate that firms implementing ESOPs experienced an average 11.89 percent i...This study examines the impact of employee stock ownership plans(ESOPs)on stock-price informativeness in Chinese stock markets.Its findings indicate that firms implementing ESOPs experienced an average 11.89 percent increase in stock-price informativeness.The plans improved stock-price informativeness through increased external attention and supervision.An event study shows that ESOPs gave rise to an announcement effect,driven by anticipated performance improvements and the novelty associated with ESOPs.A mechanism analysis demonstrates that the implementation of ESOPs attracted market attention,and the increased market supervision resulting from this mitigated the moral hazards of management associated with ESOPs.Plans with more positive signals exerted a greater influence.Notably,ESOPs that prioritized management incentives gained more recognition in the market.As the incentive effects of ESOPs were weaker than those of equity incentive plans and the ESOPs lost novelty over time,the annual announcement effect diminished gradually.These findings underscore the necessity of strengthening ESOP incentives for continued optimization of priceefficiency.展开更多
供热负荷预测是指导供热系统调控的重要手段。提高供热负荷预测精度十分重要,针对机器学习中输出目标的分解预测,提出了一种基于季节和趋势分解(seasonal and trend decomposition using loess,STL)的供热负荷预测方法,构建了适用于供...供热负荷预测是指导供热系统调控的重要手段。提高供热负荷预测精度十分重要,针对机器学习中输出目标的分解预测,提出了一种基于季节和趋势分解(seasonal and trend decomposition using loess,STL)的供热负荷预测方法,构建了适用于供热负荷预测的输出目标。首先利用STL算法将供热负荷时间序列数据分解为趋势分量、周期分量和残差分量,分别训练Informer、BiLSTM和XGB模型,将构建好的3个分量预测模型的输出叠加作为初步预测结果,分析误差序列,以BiLSTM预测误差提高模型精度,构建出STL-Informer-BiLSTM-XGB预测模型。将上述模型与常用预测模型进行对比,结果表明所构建的STL-Informer-BiLSTM-XGB模型的MAPE、MAE和MSE分别为0.871%、96.18和13202.2,预测效果最优,验证了所提出的方法具有较高的供热负荷预测精度。展开更多
随着隔震技术的推广应用以及建筑业信息化水平的持续提升,在隔震工程中对隔震层建筑信息模型(building information modeling, BIM)建模的需求逐渐增长,然而针对性的研究工作相对较少。为此,围绕隔震支座BIM模型的高效建模方法和应用模...随着隔震技术的推广应用以及建筑业信息化水平的持续提升,在隔震工程中对隔震层建筑信息模型(building information modeling, BIM)建模的需求逐渐增长,然而针对性的研究工作相对较少。为此,围绕隔震支座BIM模型的高效建模方法和应用模块开展了研究。首先,综合隔震支座应用情况和力学特性,可将其分为橡胶隔震支座、滑移摩擦隔震支座和其他类型隔震支座,据此提出了隔震支座BIM快速建模模块基本架构;随后,基于Revit和Visual Studio平台开发了三类隔震支座BIM模型的快速建模功能,并实现了连接节点参数化建模和支座批量/手动布置的操作功能;最后,开展了某化工公司的库房隔震加固项目的隔震层BIM模型建模实践,结果表明:利用快速建模模块可将隔震层BIM建模操作从7个步骤降低至2个步骤,且使用过程中对隔震支座构造细节的认知要求相对较低。同时,建成后的BIM模型与实际工程在建筑信息的多个方面具有较好的一致性。相关研究可为建筑和桥梁隔震工程的BIM建模提供参考和借鉴。展开更多
为了提高太阳电池阵多变量预测的精度,解决阳电池阵遥测参数存在周期波动与增长性互相耦合的问题,提出一种基于STL-Prophet-Informer模型的太阳电池阵多变量预测算法.该算法首先应用局部加权周期趋势分解算法(seasonal and trend decomp...为了提高太阳电池阵多变量预测的精度,解决阳电池阵遥测参数存在周期波动与增长性互相耦合的问题,提出一种基于STL-Prophet-Informer模型的太阳电池阵多变量预测算法.该算法首先应用局部加权周期趋势分解算法(seasonal and trend decomposition procedure based on loess,STL)对太阳电池阵的多个参数分解为趋势分量、周期分量和残差分量,然后采用对趋势性数据预测效果较好的Prophet预测趋势分量,Informer模型预测周期分量和残差分量,最后将各分量预测结果相加后得到总的太阳电池阵参数预测值.以某卫星太阳电池阵实际遥测数据做算例分析,提出算法的各项误差评价指标和单一的Informer模型、LSTM模型等相比有明显减小,将该组合预测模型用于太阳电池阵多变量参数预测中,可以提高参数预测精度,提升卫星自主运行性能.展开更多
文摘It is noted that necessity of further increase of accuracy of GPS positioning systems requires de-velopment of more perfect methods to compensate information losses occurred due to residual ionospheric delay by using optimization procedures. According to the conditions of formulated optimization task, the signal/noise ratio in measurements of zenith wet delay depends on the second order ionospheric errors, geographic latitude and day of year. At the same time if we assume that the number of measurements at the fixed geographic site is proportional to geographic latitude and if we accept existence of only two antiphase scenarios for variation of residual ionospheric delay on latitude normed by their specific constant, there should be optimum functional dependence of precipitated water on latitude upon which the quantity of measuring information reaches the maximum. The mathematical grounding of solution of formulated optimization task is given.
基金support from the National Social Science Fund of China(No.21BJY079).
文摘This study examines the impact of employee stock ownership plans(ESOPs)on stock-price informativeness in Chinese stock markets.Its findings indicate that firms implementing ESOPs experienced an average 11.89 percent increase in stock-price informativeness.The plans improved stock-price informativeness through increased external attention and supervision.An event study shows that ESOPs gave rise to an announcement effect,driven by anticipated performance improvements and the novelty associated with ESOPs.A mechanism analysis demonstrates that the implementation of ESOPs attracted market attention,and the increased market supervision resulting from this mitigated the moral hazards of management associated with ESOPs.Plans with more positive signals exerted a greater influence.Notably,ESOPs that prioritized management incentives gained more recognition in the market.As the incentive effects of ESOPs were weaker than those of equity incentive plans and the ESOPs lost novelty over time,the annual announcement effect diminished gradually.These findings underscore the necessity of strengthening ESOP incentives for continued optimization of priceefficiency.
文摘供热负荷预测是指导供热系统调控的重要手段。提高供热负荷预测精度十分重要,针对机器学习中输出目标的分解预测,提出了一种基于季节和趋势分解(seasonal and trend decomposition using loess,STL)的供热负荷预测方法,构建了适用于供热负荷预测的输出目标。首先利用STL算法将供热负荷时间序列数据分解为趋势分量、周期分量和残差分量,分别训练Informer、BiLSTM和XGB模型,将构建好的3个分量预测模型的输出叠加作为初步预测结果,分析误差序列,以BiLSTM预测误差提高模型精度,构建出STL-Informer-BiLSTM-XGB预测模型。将上述模型与常用预测模型进行对比,结果表明所构建的STL-Informer-BiLSTM-XGB模型的MAPE、MAE和MSE分别为0.871%、96.18和13202.2,预测效果最优,验证了所提出的方法具有较高的供热负荷预测精度。
文摘随着隔震技术的推广应用以及建筑业信息化水平的持续提升,在隔震工程中对隔震层建筑信息模型(building information modeling, BIM)建模的需求逐渐增长,然而针对性的研究工作相对较少。为此,围绕隔震支座BIM模型的高效建模方法和应用模块开展了研究。首先,综合隔震支座应用情况和力学特性,可将其分为橡胶隔震支座、滑移摩擦隔震支座和其他类型隔震支座,据此提出了隔震支座BIM快速建模模块基本架构;随后,基于Revit和Visual Studio平台开发了三类隔震支座BIM模型的快速建模功能,并实现了连接节点参数化建模和支座批量/手动布置的操作功能;最后,开展了某化工公司的库房隔震加固项目的隔震层BIM模型建模实践,结果表明:利用快速建模模块可将隔震层BIM建模操作从7个步骤降低至2个步骤,且使用过程中对隔震支座构造细节的认知要求相对较低。同时,建成后的BIM模型与实际工程在建筑信息的多个方面具有较好的一致性。相关研究可为建筑和桥梁隔震工程的BIM建模提供参考和借鉴。
文摘为了提高太阳电池阵多变量预测的精度,解决阳电池阵遥测参数存在周期波动与增长性互相耦合的问题,提出一种基于STL-Prophet-Informer模型的太阳电池阵多变量预测算法.该算法首先应用局部加权周期趋势分解算法(seasonal and trend decomposition procedure based on loess,STL)对太阳电池阵的多个参数分解为趋势分量、周期分量和残差分量,然后采用对趋势性数据预测效果较好的Prophet预测趋势分量,Informer模型预测周期分量和残差分量,最后将各分量预测结果相加后得到总的太阳电池阵参数预测值.以某卫星太阳电池阵实际遥测数据做算例分析,提出算法的各项误差评价指标和单一的Informer模型、LSTM模型等相比有明显减小,将该组合预测模型用于太阳电池阵多变量参数预测中,可以提高参数预测精度,提升卫星自主运行性能.