In this study,the behavior of Gavoshan dam was evaluated during construction and the first impounding.A two-dimensional(2D) numerical analysis was conducted based on a finite difference method on the largest cross-s...In this study,the behavior of Gavoshan dam was evaluated during construction and the first impounding.A two-dimensional(2D) numerical analysis was conducted based on a finite difference method on the largest cross-section of the dam using the results of instrument measurements and back analysis.These evaluations will be completed in the case that back analysis is carried out in order to control the degree of the accuracy and the level of confidence of the measured behavior since each of the measurements could be controlled by comparing it to the result obtained from the numerical model.Following that,by comparing the results of the numerical analysis with the measured values,it is indicated that there is a proper consistency between these two values.Moreover,it was observed that the dam performance was suitable regarding the induced pore water pressure,the pore water pressure ratio r;,settlement,induced stresses,arching degree,and hydraulic fracturing probability during the construction and initial impounding periods.The results demonstrated that the maximum settlement of the core was 238 cm at the end of construction.In the following 6 years after construction(initial impounding and exploitation period),the accumulative settlement of the dam was 270 cm.It is clear that 88% of the total settlement of the dam took place during dam construction.The reason is that the clay core was smashed in the wet side,i.e.the optimum moisture content.Whereas the average curving ratio was 0.64 during dam construction; at the end of the initial impounding,the maximum amount of curving ratio in the upstream was 0.81,and the minimum(critical) amount in the downstream was 0.52.It was also concluded that this dam is safe in comparison with the behaviors of other similar dams in the world.展开更多
Xiangxi Bay,a typical bay of the Three Gorges Reservoir(TGR)in China,was formed in June 2003 after the impoundment of the TGR.We investigated the community structure of zoobenthos in Xiangxi Bay from August 2003 to Au...Xiangxi Bay,a typical bay of the Three Gorges Reservoir(TGR)in China,was formed in June 2003 after the impoundment of the TGR.We investigated the community structure of zoobenthos in Xiangxi Bay from August 2003 to August 2004.Benthic abundance and biomass were calculated per unit area of sediment.A total of 26 taxa were identified.They included two families of Lamellibranchia(7.7%of the total taxa number),two families of Oligochaeta(50%),Chironomidae(38.5%),and one other animal(3.8%).The average density and biomass were 276 ind./m2 and 0.301 g/m2,respectively.Oligochaetes and chironomids constituted the major groups,and Limnodrilus hoffmeisteri,Procladius sp.,Branchiura sowerbyi,Tubificidae sp1.and Polypedilum scalaenum group sp.were the common taxa in this reservoir system.Among them,L.hoffmeisteri and Procladius sp.were the dominant species,and contributed 37.0%and 28.3%of the total density,respectively.The standing crop of zoobenthos in Xiangxi Bay was relative low,compared with other similar reservoirs.Our studies demonstrate that the standing crop increased gradually with time.The total density and biomass in August 2004 were 8.8 and 14.3 times those of the initial impoundment,separately.Oligochaetes did not become the sole dominant group,indicating that the sediment loading in Xiangxi Bay may be not serious.展开更多
文摘In this study,the behavior of Gavoshan dam was evaluated during construction and the first impounding.A two-dimensional(2D) numerical analysis was conducted based on a finite difference method on the largest cross-section of the dam using the results of instrument measurements and back analysis.These evaluations will be completed in the case that back analysis is carried out in order to control the degree of the accuracy and the level of confidence of the measured behavior since each of the measurements could be controlled by comparing it to the result obtained from the numerical model.Following that,by comparing the results of the numerical analysis with the measured values,it is indicated that there is a proper consistency between these two values.Moreover,it was observed that the dam performance was suitable regarding the induced pore water pressure,the pore water pressure ratio r;,settlement,induced stresses,arching degree,and hydraulic fracturing probability during the construction and initial impounding periods.The results demonstrated that the maximum settlement of the core was 238 cm at the end of construction.In the following 6 years after construction(initial impounding and exploitation period),the accumulative settlement of the dam was 270 cm.It is clear that 88% of the total settlement of the dam took place during dam construction.The reason is that the clay core was smashed in the wet side,i.e.the optimum moisture content.Whereas the average curving ratio was 0.64 during dam construction; at the end of the initial impounding,the maximum amount of curving ratio in the upstream was 0.81,and the minimum(critical) amount in the downstream was 0.52.It was also concluded that this dam is safe in comparison with the behaviors of other similar dams in the world.
基金The project was supported by the Key Project of Knowledge Innovation Program of CAS(No.KSCX2-SW-111)the Key Project of National Natural Sciences Foundation of China(No.30330140)the National Basic Research Priorities Programme(973 Programme)(No.2002CB412300).
文摘Xiangxi Bay,a typical bay of the Three Gorges Reservoir(TGR)in China,was formed in June 2003 after the impoundment of the TGR.We investigated the community structure of zoobenthos in Xiangxi Bay from August 2003 to August 2004.Benthic abundance and biomass were calculated per unit area of sediment.A total of 26 taxa were identified.They included two families of Lamellibranchia(7.7%of the total taxa number),two families of Oligochaeta(50%),Chironomidae(38.5%),and one other animal(3.8%).The average density and biomass were 276 ind./m2 and 0.301 g/m2,respectively.Oligochaetes and chironomids constituted the major groups,and Limnodrilus hoffmeisteri,Procladius sp.,Branchiura sowerbyi,Tubificidae sp1.and Polypedilum scalaenum group sp.were the common taxa in this reservoir system.Among them,L.hoffmeisteri and Procladius sp.were the dominant species,and contributed 37.0%and 28.3%of the total density,respectively.The standing crop of zoobenthos in Xiangxi Bay was relative low,compared with other similar reservoirs.Our studies demonstrate that the standing crop increased gradually with time.The total density and biomass in August 2004 were 8.8 and 14.3 times those of the initial impoundment,separately.Oligochaetes did not become the sole dominant group,indicating that the sediment loading in Xiangxi Bay may be not serious.