In this study, we will cover the basic methods used to distinguish between inrush current and fault current in power transformers. First, the nature of inrush current is presented compared to the fault current. Then t...In this study, we will cover the basic methods used to distinguish between inrush current and fault current in power transformers. First, the nature of inrush current is presented compared to the fault current. Then the nature of the magnetizing current due to energizing a power transformer at no-load is explained. The first generation of methods used to disable the protective relay system during inrush current, namely the Desensitizing and Tripping Suppressor, is introduced. The second generation, the harmonic restraint method and the waveform-based restraint method with their different versions, is explained. Then we will explore thoroughly the fictitious equivalent resistance method as an example of the third generation of model type restraining or blocking methods. Finally, a comparison between these methods and conclusion is carried out.展开更多
The method is based on that the waveform of the inrush distorts seriously, while the fault current nearly keeps sinusoid. The complicated signal can be decomposed into a finite intrinsic mode functions (IMF) by the EM...The method is based on that the waveform of the inrush distorts seriously, while the fault current nearly keeps sinusoid. The complicated signal can be decomposed into a finite intrinsic mode functions (IMF) by the EMD, then define and compute the projection area on X-axis of each IMF—, the specific gravity of SIMF—, and the maximum of —. We can get a new scheme of transformer-protection based on comparing the difference between inrush and fault current. Theoretical analysis show that the method can precisely discriminate inrush and fault current, fault clearance time is about 20ms. Moreover, it is convenient to achieve and hardly be affect by not-periodic component.展开更多
The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as h...The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.展开更多
A double-stage start-up structure to limit the inrush current used in current-mode charge pump with wide input range,fixed output and multimode operation is presented in this paper.As a widely utilized power source im...A double-stage start-up structure to limit the inrush current used in current-mode charge pump with wide input range,fixed output and multimode operation is presented in this paper.As a widely utilized power source implement,a Li-battery is always used as the power supply for chips.Due to the internal resistance,a potential drop will be generated at the input terminal of the chip with an input current.A false shut down with a low supply voltage will happen if the input current is too large,leading to the degradation of the Li-battery's service life.To solve this problem,the inrush current is limited by introducing a new start-up state.All of the circuits have been implemented with the NUVOTON 0.6 μm CMOS process.The measurement results show that the inrush current can be limited below 1 A within all input supply ranges,and the power efficiency is higher than the conventional structure.展开更多
Purpose–Auxiliary power system is an indispensable part of the train;the auxiliary systems of both electric locomotives and EMUs mainly are powered by one of the two ways,which are either from auxiliary windings of t...Purpose–Auxiliary power system is an indispensable part of the train;the auxiliary systems of both electric locomotives and EMUs mainly are powered by one of the two ways,which are either from auxiliary windings of traction transformers or from DC-link voltage of traction converters.Powered by DC-link voltage of traction converters,the auxiliary systems were maintained of uninterruptable power supply with energy from electric braking.Meanwhile,powered by traction transformers,the auxiliary systems were always out of power while passing the neutral section of power supply grid and control system is powered by battery at this time.Design/methodology/approach–Uninterrupted power supply of auxiliary power system powered by auxiliary winding of traction transformer was studied.Failure reasons why previous solutions cannot be realized are analyzed.An uninterruptable power supply scheme for the auxiliary systems powered by auxiliary windings of traction transformers is proposed in this paper.The validity of the proposed scheme is verified by simulation and experimental results and on-site operation of an upgraded HXD3C type locomotive.This scheme is attractive for upgrading practical locomotives with the auxiliary systems powered by auxiliary windings of traction transformers.Findings–This scheme regenerates braking power supplied to auxiliary windings of traction transformers while a locomotive runs in the neutral section of the power supply grid.Control objectives of uninterrupted power supply technology are proposed,which are no overvoltage,no overcurrent and uninterrupted power supply.Originality/value–The control strategies of the scheme ensure both overvoltage free and inrush current free when a locomotive enters or leaves the neutral section.Furthermore,this scheme is cost low by employing updated control strategy of software and add both the two current sensors and two connection wires of hardware.展开更多
文摘In this study, we will cover the basic methods used to distinguish between inrush current and fault current in power transformers. First, the nature of inrush current is presented compared to the fault current. Then the nature of the magnetizing current due to energizing a power transformer at no-load is explained. The first generation of methods used to disable the protective relay system during inrush current, namely the Desensitizing and Tripping Suppressor, is introduced. The second generation, the harmonic restraint method and the waveform-based restraint method with their different versions, is explained. Then we will explore thoroughly the fictitious equivalent resistance method as an example of the third generation of model type restraining or blocking methods. Finally, a comparison between these methods and conclusion is carried out.
文摘The method is based on that the waveform of the inrush distorts seriously, while the fault current nearly keeps sinusoid. The complicated signal can be decomposed into a finite intrinsic mode functions (IMF) by the EMD, then define and compute the projection area on X-axis of each IMF—, the specific gravity of SIMF—, and the maximum of —. We can get a new scheme of transformer-protection based on comparing the difference between inrush and fault current. Theoretical analysis show that the method can precisely discriminate inrush and fault current, fault clearance time is about 20ms. Moreover, it is convenient to achieve and hardly be affect by not-periodic component.
文摘The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.
基金supported by the National Natural Science Foundation of China(No.61106026)
文摘A double-stage start-up structure to limit the inrush current used in current-mode charge pump with wide input range,fixed output and multimode operation is presented in this paper.As a widely utilized power source implement,a Li-battery is always used as the power supply for chips.Due to the internal resistance,a potential drop will be generated at the input terminal of the chip with an input current.A false shut down with a low supply voltage will happen if the input current is too large,leading to the degradation of the Li-battery's service life.To solve this problem,the inrush current is limited by introducing a new start-up state.All of the circuits have been implemented with the NUVOTON 0.6 μm CMOS process.The measurement results show that the inrush current can be limited below 1 A within all input supply ranges,and the power efficiency is higher than the conventional structure.
文摘Purpose–Auxiliary power system is an indispensable part of the train;the auxiliary systems of both electric locomotives and EMUs mainly are powered by one of the two ways,which are either from auxiliary windings of traction transformers or from DC-link voltage of traction converters.Powered by DC-link voltage of traction converters,the auxiliary systems were maintained of uninterruptable power supply with energy from electric braking.Meanwhile,powered by traction transformers,the auxiliary systems were always out of power while passing the neutral section of power supply grid and control system is powered by battery at this time.Design/methodology/approach–Uninterrupted power supply of auxiliary power system powered by auxiliary winding of traction transformer was studied.Failure reasons why previous solutions cannot be realized are analyzed.An uninterruptable power supply scheme for the auxiliary systems powered by auxiliary windings of traction transformers is proposed in this paper.The validity of the proposed scheme is verified by simulation and experimental results and on-site operation of an upgraded HXD3C type locomotive.This scheme is attractive for upgrading practical locomotives with the auxiliary systems powered by auxiliary windings of traction transformers.Findings–This scheme regenerates braking power supplied to auxiliary windings of traction transformers while a locomotive runs in the neutral section of the power supply grid.Control objectives of uninterrupted power supply technology are proposed,which are no overvoltage,no overcurrent and uninterrupted power supply.Originality/value–The control strategies of the scheme ensure both overvoltage free and inrush current free when a locomotive enters or leaves the neutral section.Furthermore,this scheme is cost low by employing updated control strategy of software and add both the two current sensors and two connection wires of hardware.