期刊文献+
共找到497篇文章
< 1 2 25 >
每页显示 20 50 100
Construction Safety Management of Mechanical and Electrical Installation Projects
1
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation installation engineering Engineering projects Safety management
下载PDF
Simplified prediction models for acoustic installation effects of train-mounted equipment
2
作者 David Thompson Dong Zhao Giacomo Squicciarini 《Railway Engineering Science》 EI 2024年第2期125-143,共19页
Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test b... Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test bench is combined with meas-ured or predicted transfer functions.It is important,however,to allow for installation effects due to shielding by fairings or the train body.In the current work,fast-running analytical models are developed to determine these installation effects.The model for roof-mounted sources takes account of diffraction at the corner of the train body or fairing,using a barrier model.For equipment mounted under the train,the acoustic propagation from the sides of the source is based on free-field Green’s functions.The bottom surfaces are assumed to radiate initially into a cavity under the train,which is modelled with a simple diffuse field approach.The sound emitted from the gaps at the side of the cavity is then assumed to propagate to the receivers according to free-field Green’s functions.Results show good agreement with a 2.5D boundary element model and with measurements.Modelling uncertainty and parametric uncertainty are evaluated.The largest variability occurs due to the height and impedance of the ground,especially for a low receiver.This leads to standard deviations of up to 4 dB at low frequencies.For the roof-mounted sources,uncertainty over the location of the corner used in the equivalent barrier model can also lead to large standard deviations. 展开更多
关键词 Train noise Auxiliary equipment Acoustic installation effects Virtual certification UNCERTAINTY
下载PDF
Translation Theory and Techniques in Optometry Literature: A Case Study of the “Optoform 80 Installation and Maintenance Manual”
3
作者 JIANG Fangzhou 《Sino-US English Teaching》 2024年第2期94-97,共4页
Translation of specialized documents in optometry presents unique challenges,requiring a deep understanding of the professional context,terminology,and adherence to specific translation styles.This paper delves into t... Translation of specialized documents in optometry presents unique challenges,requiring a deep understanding of the professional context,terminology,and adherence to specific translation styles.This paper delves into the translation theory and techniques employed in the English-to-Chinese translation of the“Optoform 80 Installation and Maintenance Manual”,serving as a case study.Emphasizing Nida’s theory of functional equivalence,the paper explores the complexities of translating professional optometry literature,focusing on key points and common issues in translating installation and maintenance manuals for optometric devices.Special attention is given to the translation of professional terminology,employing methods such as addition,omission,conversion,and repetition.The translation process aims to meet specific requirements,ensuring accuracy and coherence while aligning with Chinese language conventions.The paper also analyzes translation methods and techniques concerning terminology,prepositions,conjunctions,and handling parallel elements based on practical insights from the Optoform 80 Manual. 展开更多
关键词 optometry translation functional equivalence installation and maintenance manual translation
下载PDF
Construction Engineering,Equipment Installation,Construction Engineering
4
作者 EN He-bai-yi-la 《Frontiers Research of Architecture and Engineering》 2024年第1期6-10,共5页
At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equ... At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equipment is a large amount of work,with a large number of types of work,with a strong degree of specialization,and also technically complex.In the construction of construction projects in China,the installation of engineer-ing equipment is a key control point of construction safety,and equipment installation has always been a key point that construction enterprises at-tach great importance to.The installation of engineering equipment will not only affect the overall progress of engineering construction,but also affect the quality of the project,therefore,the installation of construction equipment has played a vital role and has attracted increasing attention.Combined with the actual situation of construction enterprises,this paper briefly introduces some problems and solutions existing in the construction of construction enterprises. 展开更多
关键词 Construction works Equipment installation Measures
下载PDF
Construction Technology of Lightning Protection Devices in Building Electrical Installation Engineering
5
作者 Xuhong Du 《Journal of Electronic Research and Application》 2024年第1期22-27,共6页
To better improve the electrical safety of buildings and fulfill the role of lightning protection and grounding,this article combines cases and discusses seven aspects of lightning protection devices’construction tec... To better improve the electrical safety of buildings and fulfill the role of lightning protection and grounding,this article combines cases and discusses seven aspects of lightning protection devices’construction technology.These aspects include the lightning protection classification of buildings,air terminals,down conductors,grounding devices,division of lightning protection zones,and lightning electromagnetic pulse shielding.Through the introduction of this article,readers can gain a comprehensive understanding of the application and value of lightning protection grounding construction technology in building electrical installation projects. 展开更多
关键词 Building electrical installation engineering Lightning protection grounding
下载PDF
Studies on Suction-Assisted Installation Behavior of Suction Caissons in Clay Under Various Undrained Shear Strengths
6
作者 LI Da-yong HOU Xin-yu +2 位作者 ZHANG Yu-kun MA Shi-li LI Shan-shan 《China Ocean Engineering》 SCIE EI CSCD 2023年第6期989-999,共11页
Suction caissons are widely used for anchoring floating platform and offshore wind turbines.Penetration of the suction caisson into the desired position under the combination of its self-weight and applied suction res... Suction caissons are widely used for anchoring floating platform and offshore wind turbines.Penetration of the suction caisson into the desired position under the combination of its self-weight and applied suction resulted from pumping out the encased water is integral to practical engineering.Model tests were carried out to investigate the suctionassisted installation of suction caissons in clay under various undrained shear strengths.It was found that there exists a critical penetration depth value.When the penetration depth is smaller than the critical value,the soil plug undrained shear strength is higher than intact clay(i.e.,clay prior to installation).However,when the penetration depth is greater than the critical penetration depth,the undrained shear strength of soil plug is lower than intact clay.The critical value decreases with the increasing consolidation time and undrained shear strength of clay.During suction-assisted installation,cracks occur around suction caissons.The installation way has little effect on the crack formation.The influence range(i.e.,the maximum distance between the crack and the suction caisson edge)was found to increase with the increasing friction coefficient of interface between the suction caisson wall and soil and decreases with the increasing soil undrained shear strength.In addition,the drained condition of the clay during installation is dominated by the caisson aspect ratio,the undrained shear strength and the friction coefficient between the caisson wall and clay.Equations to estimate the penetration resistance and the required suction to install the suction caisson are summarized. 展开更多
关键词 suction caisson suction-assisted installation model tests undrained shear strength of clay soil deformation
下载PDF
Dynamic Analysis of A Deep-Water Compliant Vertical Access Riser with A Variable Length During Installation
7
作者 LIANG Wei-xing LOU Min +1 位作者 WANG Yu ZHANG Rui 《China Ocean Engineering》 SCIE EI CSCD 2023年第4期568-579,共12页
Compliant vertical access risers(CVAR)have broad application prospects in deep-water oil and gas transportation.However,the mechanical behaviors of the CVAR with a variable length during installation remains unclear.T... Compliant vertical access risers(CVAR)have broad application prospects in deep-water oil and gas transportation.However,the mechanical behaviors of the CVAR with a variable length during installation remains unclear.To address this issue,based on the flexible segment method,a model of CVAR with a variable length during installation is established in this study,which is verified by the comparison with commercial software.Then,the mechanical behaviors of CVAR during installation are investigated.The results reveal that the CVAR configuration is significantly affected by the buoyancy blocks.The streamwise displacement of CVAR increases with the increase of current velocity.When the BOP weight is insuffcient,obvious upbending is observed in the lower region and transition region,leading to local compression.When the platform moves in the opposite direction to the current,the maximum stress is larger than that of the scenario when the platform moves in the same direction as the current. 展开更多
关键词 compliant vertical access riser installation analysis dynamic performance variable length
下载PDF
Optimal Configuration Method for the Installed Capacity of the Solar-Thermal Power Stations
8
作者 Yan Wang Zhicheng Ma +3 位作者 Jinping Zhang Qiang Zhou Ruiping Zhang Haiying Dong 《Energy Engineering》 EI 2023年第4期949-963,共15页
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p... Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise. 展开更多
关键词 Solar-thermal power station optimal configuration of installed capacity new energy base multi-objective optimization chance constrained planning theory
下载PDF
使用IBM Installation Factory简化Web Sphere Application Server的安装和部署
9
作者 杜剑侠 《电子技术与软件工程》 2013年第16期231-232,共2页
本文重点介绍了IBMInstal-lation Factory(以下简称IF)的主要功能,讲解如何使用IF生成定制安装包和集成安装包,以及如何使用生成的定制安装包和集成安装包来简化和标准化Web Sphere Application Server的安装和部署。
关键词 1BM install ation Facto ry安装(Sc ratch install)定制安装包集成安装包(IIP)初始(CIP)
下载PDF
Install Shield制作数据库安装程序研究 被引量:1
10
作者 高雪松 都思丹 《微处理机》 2005年第4期42-43,共2页
本文介绍了一种利用Install Shield制作数据库软件安装版的方法,并着重阐述了如何利用InstallScript语言来注册设置ODBC。
关键词 安装制作 数据库 install DSN installScript
下载PDF
One-Step-Installation of Offshore Wind Turbine on Large-Scale Bucket-Top-Bearing Bucket Foundation 被引量:18
11
作者 丁红岩 练继建 +1 位作者 李爱东 张浦阳 《Transactions of Tianjin University》 EI CAS 2013年第3期188-194,共7页
In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d... In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year. 展开更多
关键词 one-step-installation TECHNIQUE large-scale bucket-top-bearing BUCKET foundation self-floating towing penetration TECHNIQUE with adjustment of horizontal levelness removability TECHNIQUE construction and installATION cost
下载PDF
Investigation on Installation of Offshore Wind Turbines 被引量:4
12
作者 王玮 白勇 《Journal of Marine Science and Application》 2010年第2期175-180,共6页
Wind power has made rapid progress and should gain significance as an energy resource,given growing interest in renewable energy and clean energy.Offshore wind energy resources have attracted significant attention,as,... Wind power has made rapid progress and should gain significance as an energy resource,given growing interest in renewable energy and clean energy.Offshore wind energy resources have attracted significant attention,as,compared with land-based wind energy resources,offshore wind energy resources are more promising candidates for development.Sea winds are generally stronger and more reliable and with improvements in technology,the sea has become a hot spot for new designs and installation methods for wind turbines.In the present paper,based on experience building offshore wind farms,recommended foundation styles have been examined.Furthermore,wave effects have been investigated.The split installation and overall installation have been illustrated.Methods appropriate when installing a small number of turbines as well as those useful when installing large numbers of turbines were analyzed.This investigation of installation methods for wind turbines should provide practical technical guidance for their installation. 展开更多
关键词 wind turbine foundation style split installation overall installation
下载PDF
基于Install SHIELD的应用系统安装程序的设计 被引量:1
13
作者 张大斌 朱绍文 《微型机与应用》 2001年第6期45-47,共3页
结合商业MIS框架的生成系统(FGSM)软件的安装程序制作实例,介绍利用Install SHIELD制作应用系统安装程序的方法。
关键词 VC++ 程序设计 应用系统 安装程序 install SHIELD
下载PDF
Installation and Debugging of Auto-control System in Fruit Wine Production Line
14
作者 方良材 黄卫萍 陈赶林 《Agricultural Science & Technology》 CAS 2014年第4期611-615,共5页
[Objective] The aim was to test the controlling effect of cleaning steriliza- tion system, material conveying system, and fermentation jar cooling system with equip- ments of fruit wine production line introduced in t... [Objective] The aim was to test the controlling effect of cleaning steriliza- tion system, material conveying system, and fermentation jar cooling system with equip- ments of fruit wine production line introduced in this study and its auto-control sys- tem field assembled and debugged. [Method] Based on controlling equipment and setting parameters on the configuration interface, the operation state of the control equipments could be real-time monitored and controlled with the help of configura- tion software. [Result] The result showed that the equipment system could reduce the temperature into 12 ℃ with the error of +0.5 ℃within 110 minutes when the fermentation temperature is set at 12 ℃ in real production. [Conclusion] The auto- control system of fruit wine production line was easy to be assembled and de- bugged to meet demands of different fruit wine productions. 展开更多
关键词 Fruit wine production line Control system installATION DEBUGGING
下载PDF
Designing a Comprehensive Skill Evaluation and Vocational Ability Development Program for FTTH Installer 被引量:1
15
作者 Takuo Kikuchi 《Computer Technology and Application》 2015年第1期5-13,共9页
Recently, FTTH (fiber to the home) is spreading rapidly, and communication technology has become an indispensable part in our lives. FTTH installers who build the infi'astructure must correspond to the progress of ... Recently, FTTH (fiber to the home) is spreading rapidly, and communication technology has become an indispensable part in our lives. FTTH installers who build the infi'astructure must correspond to the progress of technology while ensuring a high quality of installation, and it is struggling to its counterpart. The present study is undertaken in order to propose effective vocational ability development program for FTTH installers from the approach of their skill. They are information network cabling-related qualification system and competitions as the ability evaluation system. Then the author concludes that this program makes a contribution to improving their skill and maintaining the quality of the optical fiber network in analyzing some example of actual installation work and the measurement result of the OTDR(optical time domain reflect) meter. 展开更多
关键词 Vocational ability development program FTTH installer installation skill evaluation system.
下载PDF
第三代风电安装船SEA INSTALLER 被引量:1
16
作者 崔燕 《中国船检》 2012年第9期83-84,141,共3页
2012年7月24日.由中远船务集团南通中远船务公司为丹麦国家能源公司设计建造的世界第三代自升式海上风电安装船”东安吉1号”在启东中远海工基地正式命名为”SEAINSTALLER”。该船是当代世界最先进、自动化程度高、
关键词 installER 海上风电 第三代 装船 SEA 南通中远船务公司 中远船务集团 自动化程度
下载PDF
Windows Installer技术及其使用
17
作者 时慧琨 冯康 《淮北煤炭师范学院学报(自然科学版)》 CAS 2004年第2期60-63,共4页
WindowsInstaller是微软推出的软件安装、发布及管理方式,使用它可以进行包括软件的发布、安装、修改、升级、移除在内的全程管理,较好地解决了原有软件发布方式中存在的问题.本文描述了WindowsInstaller的特点、结构、运行过程以及实... WindowsInstaller是微软推出的软件安装、发布及管理方式,使用它可以进行包括软件的发布、安装、修改、升级、移除在内的全程管理,较好地解决了原有软件发布方式中存在的问题.本文描述了WindowsInstaller的特点、结构、运行过程以及实现途径,最后说明了使用它进行软件发布的基本步骤. 展开更多
关键词 WINDOWS installER 特性 组件 软件发布 MSI
下载PDF
利用Install Builder制作Pb程序安装盘的过程
18
作者 王宗江 《潍坊学院学报》 2002年第2期63-64,71,共3页
PowerBuider是目前最流行的数据库开发平台之一 ,利用PowerBuider编写的数据库应用程序必须经过安装程序的安装后才能运行。本文详细阐述了利用InstallBuilder制作Pb应用程序安装盘的方法和步骤。
关键词 install Builder” “Power Builder” 数据库 安装盘
下载PDF
Windows Installer服务出错信息解决方案
19
作者 杨昱翔 《华南金融电脑》 2005年第11期98-99,共2页
我们在工作中经常需要自己安装一些业务或常用软件,在安装MSI格式的文件包过程中 ,常常会遇到一系列关于Windows Installer出错的信息,有如下两种现象:
关键词 installER WINDOWS 出错信息 服务 常用软件 文件包 MSI 安装
下载PDF
Development and Prospect of Installation Technology of Electrical and Mechanical Equipment in Hydropower Construction
20
作者 FuYuanchu 《Electricity》 2005年第2期27-29,共3页
The hydropower installed capacity in China exceeded 100 GW by the end of 2004. With the develop-ment of hydropower construction cause, the contingents of electrical and mechanical installation also grew steadily.The i... The hydropower installed capacity in China exceeded 100 GW by the end of 2004. With the develop-ment of hydropower construction cause, the contingents of electrical and mechanical installation also grew steadily.The installation and debugging techniques made great strides in aspects of different conventional hydrogeneratorsets, reversible pumped-storage units and their rotor spiders, runners, bearings, penstocks as well as controlequipment, such as computerized governors, intelligent monitoring devices. Major technical innovations werebrought about in the electrical and mechanical installation. For an arduous task to construct hydropower projectsof over 50 GW confronts hydropower installation enterprises at the beginning of 21 st century, the installationtechnologies will certainly develop around the projects. 展开更多
关键词 hydropower station electrical and mechanical installation installation technique
下载PDF
上一页 1 2 25 下一页 到第
使用帮助 返回顶部