期刊文献+
共找到27,571篇文章
< 1 2 250 >
每页显示 20 50 100
Milestone progress of the HEPS booster commissioning
1
作者 Yue-Mei Peng Jian-She Cao +20 位作者 Jin-Hui Chen Hai-Yi Dong Ping He Yi Jiao Ling Kang Wen Kang Jian Li Jing-Yi Li Guo-Ping Lin Fang Liu Feng-Li Long Cai Meng Xin Qi Hua-Min Qu Yan-Feng Sui Sheng Wang Gang Xu Qiang Ye Jing Zhang Pei Zhang Wei-Min Pan 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2024年第1期170-177,共8页
The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the ... The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the electron beam from the Linac and increases its energy to the value required for the storage ring.The full-energy beam could be injected to the storage ring directly or after“high-energy accumulation.”On November 17,2023,the key booster parameters successfully reached their corresponding target values.These milestone results were achieved based on numerous contributions,including nearly a decade of physical design,years of equipment development and installation,and months of beam commissioning.As measured at the extraction energy of 6 GeV,the averaged beam current and emittance reached 8.57 mA with 5 bunches and 30.37 nm rad with a single-bunch charge of 5.58 nC,compared with the corresponding target values of 6.6 mA and 35 nm rad,respectively.This paper presents the physical design,equipment development,installation,and commissioning process of the HEPS booster. 展开更多
关键词 High energy photon source BOOSTER Beam commissioning
下载PDF
Simplified prediction models for acoustic installation effects of train-mounted equipment
2
作者 David Thompson Dong Zhao Giacomo Squicciarini 《Railway Engineering Science》 EI 2024年第2期125-143,共19页
Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test b... Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test bench is combined with meas-ured or predicted transfer functions.It is important,however,to allow for installation effects due to shielding by fairings or the train body.In the current work,fast-running analytical models are developed to determine these installation effects.The model for roof-mounted sources takes account of diffraction at the corner of the train body or fairing,using a barrier model.For equipment mounted under the train,the acoustic propagation from the sides of the source is based on free-field Green’s functions.The bottom surfaces are assumed to radiate initially into a cavity under the train,which is modelled with a simple diffuse field approach.The sound emitted from the gaps at the side of the cavity is then assumed to propagate to the receivers according to free-field Green’s functions.Results show good agreement with a 2.5D boundary element model and with measurements.Modelling uncertainty and parametric uncertainty are evaluated.The largest variability occurs due to the height and impedance of the ground,especially for a low receiver.This leads to standard deviations of up to 4 dB at low frequencies.For the roof-mounted sources,uncertainty over the location of the corner used in the equivalent barrier model can also lead to large standard deviations. 展开更多
关键词 Train noise Auxiliary equipment Acoustic installation effects Virtual certification UNCERTAINTY
下载PDF
Translation Theory and Techniques in Optometry Literature: A Case Study of the “Optoform 80 Installation and Maintenance Manual”
3
作者 JIANG Fangzhou 《Sino-US English Teaching》 2024年第2期94-97,共4页
Translation of specialized documents in optometry presents unique challenges,requiring a deep understanding of the professional context,terminology,and adherence to specific translation styles.This paper delves into t... Translation of specialized documents in optometry presents unique challenges,requiring a deep understanding of the professional context,terminology,and adherence to specific translation styles.This paper delves into the translation theory and techniques employed in the English-to-Chinese translation of the“Optoform 80 Installation and Maintenance Manual”,serving as a case study.Emphasizing Nida’s theory of functional equivalence,the paper explores the complexities of translating professional optometry literature,focusing on key points and common issues in translating installation and maintenance manuals for optometric devices.Special attention is given to the translation of professional terminology,employing methods such as addition,omission,conversion,and repetition.The translation process aims to meet specific requirements,ensuring accuracy and coherence while aligning with Chinese language conventions.The paper also analyzes translation methods and techniques concerning terminology,prepositions,conjunctions,and handling parallel elements based on practical insights from the Optoform 80 Manual. 展开更多
关键词 optometry translation functional equivalence installation and maintenance manual translation
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
4
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation installation engineering Engineering projects Safety management
下载PDF
Construction Technology of Lightning Protection Devices in Building Electrical Installation Engineering
5
作者 Xuhong Du 《Journal of Electronic Research and Application》 2024年第1期22-27,共6页
To better improve the electrical safety of buildings and fulfill the role of lightning protection and grounding,this article combines cases and discusses seven aspects of lightning protection devices’construction tec... To better improve the electrical safety of buildings and fulfill the role of lightning protection and grounding,this article combines cases and discusses seven aspects of lightning protection devices’construction technology.These aspects include the lightning protection classification of buildings,air terminals,down conductors,grounding devices,division of lightning protection zones,and lightning electromagnetic pulse shielding.Through the introduction of this article,readers can gain a comprehensive understanding of the application and value of lightning protection grounding construction technology in building electrical installation projects. 展开更多
关键词 Building electrical installation engineering Lightning protection grounding
下载PDF
Commissioning and operation of the cryostat for 3W1 SC wiggler
6
作者 Miao-Fu Xu Xiang-Zhen Zhang +7 位作者 Rui Ye Jin-Can Wang Xiao-Juan Bian Yao Gao Min-Xian Li Fu-San Chen Xiao-Chen Yang Rui Ge 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2023年第6期43-54,共12页
A 3W1 superconducting wiggler(SCW)with the pole gap of 68 mm was successfully tested and installed in a BEPC II storage ring in November,2019.The goal of zero liquid helium consumption was achieved,and the cryogenic s... A 3W1 superconducting wiggler(SCW)with the pole gap of 68 mm was successfully tested and installed in a BEPC II storage ring in November,2019.The goal of zero liquid helium consumption was achieved,and the cryogenic system exhibited a 12%residual cooling capacity(approximately 0.69 W@4.2 K).The 3W1-SCW was set to operate at 2.49 T and has been operating for more than seven months.Three instances of magnet quenching occurred during the normal operation.The evaporated helium gas can be recycled to the helium gas recycling system when the pressure in the helium tank is higher than the parameter value(the setpoint of the pressure value is 1.2 bara).The cryogenic system can be recovered within 4 h if sufficient liquid helium is available to inject into the cryostat. 展开更多
关键词 CRYOSTAT commissioning SC wiggler Synchrotron radiation
下载PDF
Dynamic Analysis of A Deep-Water Compliant Vertical Access Riser with A Variable Length During Installation
7
作者 LIANG Wei-xing LOU Min +1 位作者 WANG Yu ZHANG Rui 《China Ocean Engineering》 SCIE EI CSCD 2023年第4期568-579,共12页
Compliant vertical access risers(CVAR)have broad application prospects in deep-water oil and gas transportation.However,the mechanical behaviors of the CVAR with a variable length during installation remains unclear.T... Compliant vertical access risers(CVAR)have broad application prospects in deep-water oil and gas transportation.However,the mechanical behaviors of the CVAR with a variable length during installation remains unclear.To address this issue,based on the flexible segment method,a model of CVAR with a variable length during installation is established in this study,which is verified by the comparison with commercial software.Then,the mechanical behaviors of CVAR during installation are investigated.The results reveal that the CVAR configuration is significantly affected by the buoyancy blocks.The streamwise displacement of CVAR increases with the increase of current velocity.When the BOP weight is insuffcient,obvious upbending is observed in the lower region and transition region,leading to local compression.When the platform moves in the opposite direction to the current,the maximum stress is larger than that of the scenario when the platform moves in the same direction as the current. 展开更多
关键词 compliant vertical access riser installation analysis dynamic performance variable length
下载PDF
Studies on Suction-Assisted Installation Behavior of Suction Caissons in Clay Under Various Undrained Shear Strengths
8
作者 LI Da-yong HOU Xin-yu +2 位作者 ZHANG Yu-kun MA Shi-li LI Shan-shan 《China Ocean Engineering》 SCIE EI CSCD 2023年第6期989-999,共11页
Suction caissons are widely used for anchoring floating platform and offshore wind turbines.Penetration of the suction caisson into the desired position under the combination of its self-weight and applied suction res... Suction caissons are widely used for anchoring floating platform and offshore wind turbines.Penetration of the suction caisson into the desired position under the combination of its self-weight and applied suction resulted from pumping out the encased water is integral to practical engineering.Model tests were carried out to investigate the suctionassisted installation of suction caissons in clay under various undrained shear strengths.It was found that there exists a critical penetration depth value.When the penetration depth is smaller than the critical value,the soil plug undrained shear strength is higher than intact clay(i.e.,clay prior to installation).However,when the penetration depth is greater than the critical penetration depth,the undrained shear strength of soil plug is lower than intact clay.The critical value decreases with the increasing consolidation time and undrained shear strength of clay.During suction-assisted installation,cracks occur around suction caissons.The installation way has little effect on the crack formation.The influence range(i.e.,the maximum distance between the crack and the suction caisson edge)was found to increase with the increasing friction coefficient of interface between the suction caisson wall and soil and decreases with the increasing soil undrained shear strength.In addition,the drained condition of the clay during installation is dominated by the caisson aspect ratio,the undrained shear strength and the friction coefficient between the caisson wall and clay.Equations to estimate the penetration resistance and the required suction to install the suction caisson are summarized. 展开更多
关键词 suction caisson suction-assisted installation model tests undrained shear strength of clay soil deformation
下载PDF
使用IBM Installation Factory简化Web Sphere Application Server的安装和部署
9
作者 杜剑侠 《电子技术与软件工程》 2013年第16期231-232,共2页
本文重点介绍了IBMInstal-lation Factory(以下简称IF)的主要功能,讲解如何使用IF生成定制安装包和集成安装包,以及如何使用生成的定制安装包和集成安装包来简化和标准化Web Sphere Application Server的安装和部署。
关键词 1BM instalL ation Facto ry安装(Sc ratch install)定制安装包集成安装包(IIP)初始(CIP)
下载PDF
One-Step-Installation of Offshore Wind Turbine on Large-Scale Bucket-Top-Bearing Bucket Foundation 被引量:17
10
作者 丁红岩 练继建 +1 位作者 李爱东 张浦阳 《Transactions of Tianjin University》 EI CAS 2013年第3期188-194,共7页
In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d... In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year. 展开更多
关键词 one-step-installation TECHNIQUE large-scale bucket-top-bearing BUCKET foundation self-floating towing penetration TECHNIQUE with adjustment of horizontal levelness removability TECHNIQUE construction and installation cost
下载PDF
Valuation of the flexibility in decision-making for revamping installations―A case from fertilizer plants 被引量:4
11
作者 WANG Zhen LI Liangjun 《Petroleum Science》 SCIE CAS CSCD 2010年第3期428-434,共7页
This paper puts forward a valuation model for the flexibility of revamping urea plants based on the substitutability of switching between the internationally accepted fertilizer feedstock fuel oil and natural gas. The... This paper puts forward a valuation model for the flexibility of revamping urea plants based on the substitutability of switching between the internationally accepted fertilizer feedstock fuel oil and natural gas. The paper first builds a stochastic mean-reversion model for fuel oil prices and natural gas prices respectively, then estimates and tests the parameters using the fuel oil and natural gas prices data from the U.S. market. This paper also conducts a sensitivity analysis with important parameters. The results show that the real option method can be applied successfully to evaluate the flexibility in decision- making for revamping installations in fertilizer plants or other similar plants. 展开更多
关键词 Real option fertilizer installations fuel oil natural gas mean reversion
下载PDF
Design and commissioning of Brav measurement system for SC200 superconducting cyclotron 被引量:2
12
作者 Man-Man Xu Yun-Tao Song +5 位作者 Gen Chen Yong-Hua Chen Kai-Zhong Ding Heng-Bo Li Jun Wang Jian Zhou 《Nuclear Science and Techniques》 SCIE CAS CSCD 2019年第6期57-62,共6页
The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) ... The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) with 15 search coils in the median plane. The winding differences of the search coils affect the measurement accuracy of the Brav. Based on the electromagnetic induction principle, to measure the Brav accurately, this paper focuses on the design and commissioning of the Brav measurement system. The preliminary results confirm that the system design is reasonable and suitable. After testing the search coil at different speeds, the optimal speed was determined as 2.5 mm/s. The relative error was approximately 0.1% under the maximum radial component of the magnetic field Br of 7 G. The measurement precision was up to 1.0×10^-3, which can provide the required measurement tolerance of 3–7 G for Br in the median plane. The commissioning of the Brav measurement system is an important step for Br measurement. It can check and adjust the asymmetry of the superconducting coils (SCs). 展开更多
关键词 SUPERCONDUCTING CYCLOTRON MAGNETIC FIELD MEASUREMENT SYSTEM commissioning
下载PDF
Beam dynamics,RF measurement,and commissioning of a CW heavy ion IH-DTL 被引量:2
13
作者 Heng Du You-Jin Yuan +10 位作者 Zhong-Shan Li Zhi-Jun Wang Peng Jin Xiao-Ni Li Guo-Zhu Cai Wen-Wen Ge Guo-Feng Qu Yuan He Jia-Wen Xia Jian-Cheng Yang Xue-Jun Yin 《Nuclear Science and Techniques》 SCIE CAS CSCD 2018年第3期143-155,共13页
A 53.667 MHz CW(continuous-wave) heavy ion IH-DTL has been designed for the SSC-LINAC injector of HIRFL-CSR(Heavy Ions Research Facility at Lanzhou-Cooling Storage Ring). It accelerates ions with maximum mass-to-charg... A 53.667 MHz CW(continuous-wave) heavy ion IH-DTL has been designed for the SSC-LINAC injector of HIRFL-CSR(Heavy Ions Research Facility at Lanzhou-Cooling Storage Ring). It accelerates ions with maximum mass-to-charge ratio of 7.0 from 143 to 295 ke V/u. Low-power RF measurement of the IH-DTL1 has been taken to investigate the RF performance and the quality of the electric field distribution on the beam axis.The measured Q_0 value and the shunt impedance are 10,400 and 198 MX/m, respectively. The electric field distributions on and around the beam axis were evaluated and compared with the design value. By a new approach,the dipole field component is also estimated. The beam dynamics simulation using measured field distribution was presented in this paper. Based on the dynamics analysis in both transverse and longitudinal phase space, the field distribution can meet the design requirement. Finally, the RF conditioning and very first beam commissioning on the IH-DTL1 were finished. The beam test results agree well with the simulation results; what's more, the property of the variable output beam energy about the separated functions DTL was verified. 展开更多
关键词 LINAC RF MEASUREMENT BEAM DYNAMIC simulation commissioning
下载PDF
An Installation System of Deepwater Risers by An S-Lay Vessel 被引量:4
14
作者 段梦兰 王懿 +3 位作者 Segen ESTEFEN 何宁 李丽娜 陈邦敏 《China Ocean Engineering》 SCIE EI 2011年第1期139-148,共10页
Along with the consumption increase of the petroleum products, more countries have transferred their attentions to the offshore fields, especially the deepwater oil and gas reserves. For deepwater exploitation, the ri... Along with the consumption increase of the petroleum products, more countries have transferred their attentions to the offshore fields, especially the deepwater oil and gas reserves. For deepwater exploitation, the risers must be installed to act as the conduits connecting surface platforms to subsea facilities. In this paper, the typical risers sorted by different classes are introduced, and the correspondent installation methods are presented. By investigating the recent projects performed in the deepwater hot spots, and combining the challenges of HYSY20 l for riser installation, a lifting device developed for assisting riser installation is proposed and detailed to satisfy the installation of deepwater risers in the LW3-1 Gas Field of 1500 m in the South China Sea. Tests on both the functions and performances of such a new system exhibit the satisfaction of meeting all challenging requirements of HYSY201 for application to riser installation in waters up to a depth of 3000 m in the South China Sea. 展开更多
关键词 deepwater riser riser installation lifting device LW3-1 Gas Field South China Sea
下载PDF
Analysis on Interface Shear Stress of Thermally InsulatedOcean Pipelines Under Installation 被引量:2
15
作者 闫澍旺 田英辉 +2 位作者 刘润 王章岭 王金英 《China Ocean Engineering》 SCIE EI 2006年第2期315-323,共9页
It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the st... It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the steel pipe may be. pulled off if the shear stress on the interface induced by the pullout fore from the tensioner is greater than the binding fore between two neighboring layers during installation. This paper develops a procedure to calculate the shear stress on the interface. The binding force between two neighboring layers can be determined with full scale model tests. The safety of the thermally insulated pipe under installation can then be checked by comparison of the interface shear stress with the binding force. 展开更多
关键词 thermally insulated pipelines shear stress installation binding force
下载PDF
RF tuning and beam commissioning of CW RFQ for China-ADS Injector-I 被引量:1
16
作者 Hua Shi Huafu Ouyang +2 位作者 Shengchang Wang Ningchuang Zhou Gang Wu 《Nuclear Science and Techniques》 SCIE CAS CSCD 2018年第10期182-190,共9页
A 325-MHz continuous-wave(CW) four-vane radiofrequency quadrupole(RFQ) is employed in Injector-I of the China Accelerator-Driven Subcritical System. The radiofrequency tuning and beam commissioning were performed from... A 325-MHz continuous-wave(CW) four-vane radiofrequency quadrupole(RFQ) is employed in Injector-I of the China Accelerator-Driven Subcritical System. The radiofrequency tuning and beam commissioning were performed from January 2014 to January 2017. In a cold test, a stability study showed that the design of the segmented resonantly coupling and dipole stabilizer rods can shift the harmful quadrupole and dipole mode from the fundamental mode to above 2.6 MHz. We also found a simplified tuning method for the field unflatness, involving changing the inserted length of a few plug tuners. For achieving CW-beam commissioning, two full-size RFQs were constructed successively. The commissioning results indicate that the beam transmission rate decreased by approximately 3% as the normalized field unflatness decreased by 1%. A 10-MeV CW proton beam with an average beam current of 2.1 m A was achieved at the target of Injector-I, and the output beam energy of the RFQ was3.18 MeV. 展开更多
关键词 RFQ RF tuning CW-beam commissioning BEAM transmission rate
下载PDF
Commissioning of TrueBeamTM Medical Linear Accelerator: Quantitative and Qualitative Dosimetric Analysis and Comparison of Flattening Filter (FF) and Flattening Filter Free (FFF) Beam 被引量:4
17
作者 Ravindra Shende Gourav Gupta +1 位作者 Ganesh Patel Senthil Kumar 《International Journal of Medical Physics, Clinical Engineering and Radiation Oncology》 2016年第1期51-69,共19页
Motive of the study is to present quantitative and qualitative analysis and comparison of beam data measurement with FF (flattening filter) and FFF (flattening filter free) beam in a Varian TrueBeam<sup>TM</s... Motive of the study is to present quantitative and qualitative analysis and comparison of beam data measurement with FF (flattening filter) and FFF (flattening filter free) beam in a Varian TrueBeam<sup>TM</sup> Medical Linear Accelerator. Critique of beam characterization and evolution of dosimetric properties for 6 MV, 10 MV, 15 MV FF beam and 6 MVFFF, 10 MVFFF FFF beam has been carried out. We performed the comparison of photon beam data for two standard FF photon energy 6 MV, 10 MV verses 6 MVFFF, and 10 MVFFF FFF beam. Determination and comparison of parameter involved PDD (Percentage depth dose), Depth dose profile, Symmetry, Flatness, Quality index, Relative output factor, Penumbra, Transmission factor, DLG (Dosimetric leaf gap), in addition to degree of Un-flatness and off-axis ratio of FFF beam. Outcomes of presenting study had shown that change of various parameters such as Percentage depth dose curves, Shape of the depth dose profile, Transmission, Value of quality index and significant rise in surface dose for FFF in comparison with FF beam. Differences in the output factor at lower and higher field sizes for FFF beam compared to that of FF beam were found. The maximum output factor deviation between 6 MV and 6 MVFFF was found to be 4.55%, whereas in 10 MV and 10 MVFFF was 5.71%. Beam quality TPR20/10 for FFF beam was found to be lesser in magnitude, 5.42% for 6 MVFFF whereas 4.50% for 10 MVFFF compared to 6 MV and 10 MV FF beam respectively. Jaw transmission and interleaf leakage for FFF beam were found to be lesser than FF beam. Also DLG for FFF beam was found to be lesser in magnitude comparable to that of flattened beam. This study is mainly inclined towards evaluation and comparison of the FF and FFF beam. It has been observed that, the outcome of a commissioning beam data generation fully complies with vendor specification and published literature. 展开更多
关键词 True Beam Medical Linear Accelerator commissioning Photon Beam Data Flattening Filter Flattening Filter Free
下载PDF
Mechanical Design and First Engineering Commissioning of ICRF Antenna for EAST 被引量:1
18
作者 杨庆喜 宋云涛 +1 位作者 武松涛 赵燕平 《Plasma Science and Technology》 SCIE EI CAS CSCD 2010年第4期488-493,共6页
A new loop and fold wave-guide ion cyclotron resonance frequency (ICRF) antenna with a power output of 3 MW, which can operate at a frequency in the range of 30 MHz to 110 MHz, was designed. The design of key compon... A new loop and fold wave-guide ion cyclotron resonance frequency (ICRF) antenna with a power output of 3 MW, which can operate at a frequency in the range of 30 MHz to 110 MHz, was designed. The design of key components of the new ICRF antenna and the charac- ters of the new,.]~rototype ICRF antenna are presented. The thermo-mechanical analysis of both the Faraday shield and the current straps was conducted, and the stresses due to heat loads are studied in detail with different cooling-water velocities considered. In addition, the movability of prototype ICRF antenna under vacuum condition by the driving system was tested. An engineer- ing commissioning was successfully performed on the prototype ICRF antenna using the original transmitter. The results are close to the expected. 展开更多
关键词 prototype ICRF antenna faraday shield current strap vacuum feed-through engineering commissioning
下载PDF
Numerical Simulation of Float-Over Installation for Offshore Platform 被引量:1
19
作者 Yuesheng Ma Lihao Yuan +1 位作者 Yingfei Zan Fuxiang Huang 《Journal of Marine Science and Application》 CSCD 2018年第1期79-86,共8页
In this paper,a numerical investigation of a float-over installation for an offshore platform is presented to verify the feasibility of the actual installation.The hydrodynamic performance of a T-barge is investigated... In this paper,a numerical investigation of a float-over installation for an offshore platform is presented to verify the feasibility of the actual installation.The hydrodynamic performance of a T-barge is investigated in the frequency domain,and the coupled motions are analyzed in the time domain.We then compare with those of the model test and determine that the response amplitude operator and the time series agree quite well.The barge exhibits favorable hydrodynamic behavior in the considered sea state,and the equipment loads are allowable.Themooring systemand sway fender forces are within the permissible range.Based on these results,we can verify that the actual installation of the offshore platform is feasible.We accurately simulated many important factors and effectively reduced the risk associated with the offshore installation,which is of great importance.As such,we demonstrate that the numerical simulation of the float-over installation for offshore platforms has practical engineering significance. 展开更多
关键词 Float-over installation Offshore platform T-barge Model test MOORING system FENDER collision force Numerical simulation
下载PDF
Electric-Arc Plasma Installation for Preparing Nanodispersed Carbon Structures 被引量:1
20
作者 P.STEFANOV D.GARLANOV G.VISSOKOV 《Plasma Science and Technology》 SCIE EI CAS CSCD 2008年第4期484-490,共7页
An electric-arc plasma installation operated in the hidden anode arrangement is constructed and used for the preparation of carbon nanostructures. A contracted plasma arc generated by a plasma torch using an inert gas... An electric-arc plasma installation operated in the hidden anode arrangement is constructed and used for the preparation of carbon nanostructures. A contracted plasma arc generated by a plasma torch using an inert gas is used as heat source. The average mass temperature of arc is higher than 10^4 K, while its power density, which is directly transferred onto the electrode (anode), is - 2 kW/mm^2. The anode contact area formed on the electrode moves against the arc by way of shifting the electrode and is hidden completely in the interior of plasma gas stream moving towards it. As a result of both the direct plasma attack and the opposite movement of streams in the hidden anode contact area, a temperature higher than 6000 K is reached. Thus, intensive vaporization takes place, which forms a saturated plasma-gas-aerosol phase of the initial material of electrode (anode). This gas phase is mixed in and carried by the plasma stream. Over that mixed plasma stream, a controlled process of quenching (fixation) is carried out by twisted turbulent fluid streams. After the fixation, the resultant carbon nano-structures are caught by a filter and collected in a bunker. 展开更多
关键词 electric-arc plasma installation nanodispersed carbon structures
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部