期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
The study of acoustic emission (AE) forecasting coal and rock disaster technique 被引量:9
1
作者 ZOU Yin-hui 《Journal of Coal Science & Engineering(China)》 2009年第2期157-160,共4页
Introduced the coal and rock AE propagation rule,wave guide fixing technics onAE sensors,and AE forecasting coal and rock disaster on the scene and so on,The coaland rock AE propagation rule that follows the exponent ... Introduced the coal and rock AE propagation rule,wave guide fixing technics onAE sensors,and AE forecasting coal and rock disaster on the scene and so on,The coaland rock AE propagation rule that follows the exponent attenuation function on different AEfrequencies,different quality factors and different propagation distances were analyzedand deduced by theory,numerical simulation,and by actual experiment.Consequently,itwas deduced that the coal and rock AE propagation rule follows the exponent attenuationfunction.Based on the correlative theory of wave dynamics and AE sensor,the AE waveguide propagation mechanical model on the sensor fixing manner is found,and the relationsof displacement and speed and acceleration between the AE signal source and theAE signal receiving terminal are presented.The effect of the AE sensor fixing manners oncoal and rock surfaces,coal and rock bottoms and wave guides were studied by actualexperiment.For the results,the effect of the AE sensor fixing manner on wave guides isbetter than on coal and rock surfaces,and was equivalent to the fixing manner on coal androck bottoms.Based on the above study results,actual coal and rock dynamistic disasterswere successfully forecasted. 展开更多
关键词 acoustic emission coal and rock body propagation laws wave guide installation technique coal and rock dynamic disasters
下载PDF
Development and Prospect of Installation Technology of Electrical and Mechanical Equipment in Hydropower Construction
2
作者 FuYuanchu 《Electricity》 2005年第2期27-29,共3页
The hydropower installed capacity in China exceeded 100 GW by the end of 2004. With the develop-ment of hydropower construction cause, the contingents of electrical and mechanical installation also grew steadily.The i... The hydropower installed capacity in China exceeded 100 GW by the end of 2004. With the develop-ment of hydropower construction cause, the contingents of electrical and mechanical installation also grew steadily.The installation and debugging techniques made great strides in aspects of different conventional hydrogeneratorsets, reversible pumped-storage units and their rotor spiders, runners, bearings, penstocks as well as controlequipment, such as computerized governors, intelligent monitoring devices. Major technical innovations werebrought about in the electrical and mechanical installation. For an arduous task to construct hydropower projectsof over 50 GW confronts hydropower installation enterprises at the beginning of 21 st century, the installationtechnologies will certainly develop around the projects. 展开更多
关键词 hydropower station electrical and mechanical installation installation technique
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部