期刊文献+
共找到12篇文章
< 1 >
每页显示 20 50 100
Integrated construction technology for natural gas gravity drive and underground gas storage 被引量:2
1
作者 JIANG Tongwen WANG Zhengmao WANG Jinfang 《Petroleum Exploration and Development》 CSCD 2021年第5期1227-1236,共10页
Based on the mechanisms of gravity displacement,miscibility,viscosity reduction,and imbibition in natural gas flooding,an integrated reservoir construction technology of oil displacement and underground gas storage(UG... Based on the mechanisms of gravity displacement,miscibility,viscosity reduction,and imbibition in natural gas flooding,an integrated reservoir construction technology of oil displacement and underground gas storage(UGS)is proposed.This paper systemically describes the technical connotation,site selection principle and optimization process of operation parameters of the gas storage,and advantages of this technology.By making full use of the gravity displacement,miscibility,viscosity reduction,and imbibition features of natural gas flooding,the natural gas can be injected into oil reservoir to enhance oil recovery and build strategic gas storage at the same time,realizing the win-win situation of oil production and natural gas peak shaving.Compared with the gas reservoir storage,the integrated construction technology of gas storage has two profit models:increasing crude oil production and gas storage transfer fee,so it has better economic benefit.At the same time,in this kind of gas storage,gas is injected at high pressure in the initial stage of its construction,gas is injected and produced in small volume in the initial operation stage,and then in large volume in the middle and late operation stage.In this way,the gas storage wouldn’t have drastic changes in stress periodically,overcoming the shortcomings of large stress variations of gas reservoir storage during injection-production cycle due to large gas injection and production volume.The keys of this technology are site selection and evaluation of oil reservoir,and optimization of gravity displacement,displacement pressure,and gas storage operation parameters,etc.The pilot test shows that the technology has achieved initial success,which is a new idea for the rapid development of UGS construction in China. 展开更多
关键词 natural gas drive gravity displacement integrated gas storage construction gas storage parameter optimization EOR
下载PDF
Analysis on Construction Requirements for Integrated Gateway Offices
2
作者 Chen Yifang~1 Shou Qingliang~2 Wang Po~1 (1.Shanghai R&D Center of ZTE Corporation,Shanghai 201203,China 2.Nanjing R&D Center of ZTE Corporation,Nanjing 210012,China~) 《ZTE Communications》 2003年第2期19-24,共6页
This article describes the significance of constructing integrated gateway office offices by telecom operators in the new era,as well as the change and improvement of the function requirements of in- tegrated gateway ... This article describes the significance of constructing integrated gateway office offices by telecom operators in the new era,as well as the change and improvement of the function requirements of in- tegrated gateway office offices with the continuous development of cross-network services.It puts forward ZTE's overall solution for the inter-network interworking with regard to the construction of in- tegrated gateway office offices. 展开更多
关键词 for in GSM GATEWAY Analysis on construction Requirements for Integrated Gateway Offices ZTE of ISSP CDMA on
下载PDF
All-out Startup of Construction of Sino-Kuwait Integrated Refining/Petrochemical Joint Venture Project
3
《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2017年第1期80-80,共1页
On December 20,2016 the construction of the SinoKuwait Guangdong integrated refining/chemical join venture project,which is the largest Sinopec’s projec under construction and also the key construction project of Gua... On December 20,2016 the construction of the SinoKuwait Guangdong integrated refining/chemical join venture project,which is the largest Sinopec’s projec under construction and also the key construction project of Guangdong province,had been kicked off comprehensively.This project is located in the new district of the East Sea Island inside the Zhanjiang Economic Development 展开更多
关键词 All-out Startup of construction of Sino-Kuwait Integrated Refining/Petrochemical Joint Venture Project
下载PDF
Strengthening Standardized Construction of Band Card,Integrating with International Financial Circles
4
作者 Song Lei 《China Standardization》 2005年第6期24-27,共4页
Following the accession to the WTO of China,bank card industry faces new competition pressure and challenges. At present, the most outstanding problem we face is, how to narrow the gap of development between the inter... Following the accession to the WTO of China,bank card industry faces new competition pressure and challenges. At present, the most outstanding problem we face is, how to narrow the gap of development between the international bank card industry and that of China and keep up with fast-developing paces of international bank card as soon as possible. Objectively speaking, bank card industry of our country is still at the initial stage. 展开更多
关键词 CARD Strengthening Standardized construction of Bank Card Integrating with International Financial Circles Bank Innovation EMV
下载PDF
Activities of Urease and Phosphatase in Integrated Vertical Flow Constructed Wetland and Purification Effect of Black and Malodorous River 被引量:3
5
作者 崔伟 张勇 黄民生 《Agricultural Science & Technology》 CAS 2011年第8期1186-1190,共5页
[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used ... [Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used as matrix,the biological grid integrated vertical flow constructed wetland system was built to strengthen treatment for black and malodorous river,and the activities of urease and phosphatase of two fillers in different functional areas of constructed wetland were tested to study the film formation property of two fillers in different functional areas.[Result]Both urease and phosphatase activities on biofilm of soft filler were significantly higher than on biofilm of honeycomb stone filler;indicating that choosing soft filler was more advantageous to the growth of biofilm;and urease activity had significant correlation with total nitrogen removal rate,while phosphatase activity had no significant correlation with total phosphorus removal rate.[Conclusion]This study provided evidences for utilizing the activities of urease and phosphatase to evaluate the purification effect of black and malodorous river and choose appropriate filler. 展开更多
关键词 Integrated vertical flow constructed wetland UREASE PHOSPHATASE Black and malodorous river Purification effect
下载PDF
Effects of Cd^(2+) and Pb^(2+) on the substrate biofilms in the integrated vertical-flow constructed wetland 被引量:1
6
作者 Zhang Jinlian Cheng Shuiping +2 位作者 He Feng Liang Wei Wu Zhenbin 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2008年第8期900-906,共7页
The effects of single Cd^(2+)and Pb^(2+),and combined Cd^(2+)and Pb^(2+)on dehydrogenase activity and polysaccharide content of the substrate biofilms in the integrated vertical-flow constructed wetland(IVCW)were stud... The effects of single Cd^(2+)and Pb^(2+),and combined Cd^(2+)and Pb^(2+)on dehydrogenase activity and polysaccharide content of the substrate biofilms in the integrated vertical-flow constructed wetland(IVCW)were studied.Dehydrogenase activities decreased linearly with the increasing concentrations of Cd^(2+)and Pb^(2+)at different times(6,24,72,and 120 h).The activities at both 6 and 24 h were significantly higher than that at 72 and 120 h in the case of single and combined treatments.The single Cd^(2+)and... 展开更多
关键词 Cd^(2+) pb^(2+) biofilms dehydrogenase activity polysaccharide content integrated vertical-flow constructed wetland(IVCW)
下载PDF
Spacial Distribution Characteristics, Activity and Degradation Capability of the Biofilm in Integrated Vertical-flow Constructed Wetland 被引量:1
7
作者 J. Li X.X. Mao Z.B. Wu 《Journal of Environmental Science and Engineering》 2010年第10期57-62,共6页
The spacial distribution characteristics, activity and degradation capability of the biofilm in integrated vertical-flow constructed wetland were investigated. Results showed that the biofilm widely distributed in the... The spacial distribution characteristics, activity and degradation capability of the biofilm in integrated vertical-flow constructed wetland were investigated. Results showed that the biofilm widely distributed in the substrate of integrated vertical-flow constructed wetland and mainly in the 0-10 cm top layer where the activity ofdehydrogenase of the biofilm was also higher than that of other layers. The water quality could also affect the activity of the biofilm, for the TF(1,3,5-Triphenylformazan) amount reduced by the biofim incubated in water of the higher eutrophication was larger, too. The PCP (pentachlorophenol) removal rate by the substrate with biofilm was 1.5 times that without biofilm. In total, the biofilm of the down-flow chamber appeared larger biomass, higher dehydrogenase activity and stronger degradation capability of organic contamination than that in up-flow chamber and it was the major place for removal of the organic matters in waste water. 展开更多
关键词 Integrated vertical-flow constructed wetland BIOFILM DISTRIBUTION activity of dehydrogenase degradation capacity
下载PDF
Materials-oriented integrated design and construction of structures in civil engineering—A review 被引量:1
8
作者 Xing MING John C.HUANG Zongjin LI 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2022年第1期24-44,共21页
Design is a goal-oriented planning activity for creating products,processes,and systems with desired functions through specifications.It is a decision-making exploration:the design outcome may vary greatly depending o... Design is a goal-oriented planning activity for creating products,processes,and systems with desired functions through specifications.It is a decision-making exploration:the design outcome may vary greatly depending on the designer’s knowledge and philosophy.Integrated design is one type of design philosophy that takes an interdisciplinary and holistic approach.In civil engineering,structural design is such an activity for creating buildings and infrastructures.Recently,structural design in many countries has emphasized a performance-based philosophy that simultaneously considers a structure’s safety,durability,serviceability,and sustainability.Consequently,integrated design in civil engineering has become more popular,useful,and important.Material-oriented integrated design and construction of structures(MIDCS)combine materials engineering and structural engineering in the design stage:it fully utilizes the strengths of materials by selecting the most suitable structural forms and construction methodologies.This paper will explore real-world examples of MIDCS,including the realization of MIDCS in timber seismic-resistant structures,masonry arch structures,long-span steel bridges,prefabricated/on-site extruded light-weight steel structures,fiber-reinforced cementitious composites structures,and fiber-reinforced polymer bridge decks.Additionally,advanced material design methods such as bioinspired design and structure construction technology of additive manufacturing are briefly reviewed and discussed to demonstrate how MIDCS can combine materials and structures.A unified strengthdurability design theory is also introduced,which is a human-centric,interdisciplinary,and holistic approach to the description and development of any civil infrastructure and includes all processes directly involved in the life cycle of the infrastructure.Finally,this paper lays out future research directions for further development in the field. 展开更多
关键词 integrated design and construction fiber-reinforced concrete fiber-reinforced polymer light-weight steel structures digital fabrication COMPOSITES
原文传递
CONSTRUCTION OF A GOVERNMENT UNDER THE RULE OF LAW - AN OVERVIEW OF REPORT ON CHINA LAWDEVELOPMENT 2014: CONSTRUCTION OF LEGAL GOVERNMENT
9
作者 莫于川 曹伟 宗恺 《Frontiers of Law in China-Selected Publications from Chinese Universities》 2016年第1期167-196,共30页
At the Fourth Plenary Session of the 18th Central Committee of the Communist Party of China (CPC), the Decision of the Central Committee of the CPC on Some Major Issues concerning Deepening the Rule of Law 2014 was ... At the Fourth Plenary Session of the 18th Central Committee of the Communist Party of China (CPC), the Decision of the Central Committee of the CPC on Some Major Issues concerning Deepening the Rule of Law 2014 was passed and delineated the direction for the research of our nation's construction of a government under the rule of law. For years, the government at various levels and administrative agencies adhered to conducting work on the legal course under the CPC's leadership, actively promoting administration according to law, and constructing a government under the rule of law, and have made enormous achievements. However, there many difficulties still co-exist, along with challenges and opportunities. By adopting theoretical and empirical research approaches such as data analysis, normative analysis, interviews and investigations, questionnaires, counter-measure research, and case studies, this article discusses and conducted systematic and in-depth research on the theoretical framework of the construction of a government under the rule of law from macroscopic, to microscopic aspects. This article outlined the basic contexts and realistic vision for China's construction of a government under the rule of law, which can provide active implementation of the project of construction of government under the rule of law with a basis in theoretical referenee. 展开更多
关键词 country under the rule of law govenment under the rule of law society underthe rule of law integrated construction
原文传递
Management innovation and construction integration technology in Brazil’s superlarge deep-water offshore oil and gas unit project (FPSO P67/P70)
10
作者 Fuwen TAO Shengqiang WANG Qingwu SONG 《Frontiers of Engineering Management》 2022年第2期349-353,共5页
Designer:Design Institute of Offshore Oil Engineering Co.,Ltd.,China Construction Integrator:Offshore Oil Engineering Co.,Ltd.,China 1 Background and characteristics of Brazil FPSO P67/P70 project Floating Production ... Designer:Design Institute of Offshore Oil Engineering Co.,Ltd.,China Construction Integrator:Offshore Oil Engineering Co.,Ltd.,China 1 Background and characteristics of Brazil FPSO P67/P70 project Floating Production Storage and Offloading(FPSO)is a comprehensive large-scale offshore oil and gas production unit that integrates oil and gas processing,oil storage and unloading,daily life,and power supply. 展开更多
关键词 Brazil FPSO P67/P70 SUPERLARGE dry towing operation construction integration risk control management
原文传递
THE TRACE IDENTITY, A POWERFUL TOOL FOR CONSTRUCTING THE HAMILTONIAN STRUCTURE OF INTEGRABLE SYSTEMS (Ⅱ) 被引量:117
11
作者 屠规彰 孟大志 《Acta Mathematicae Applicatae Sinica》 SCIE CSCD 1989年第1期89-96,共8页
An isospectral problem with four potentials is discussed. The corresponding hierarchy of nonlinearevolution equations is derived. It is shown that the AKNS, Levi, D-AKNS hierarchies and a new oneare reductions of the ... An isospectral problem with four potentials is discussed. The corresponding hierarchy of nonlinearevolution equations is derived. It is shown that the AKNS, Levi, D-AKNS hierarchies and a new oneare reductions of the above hierarchy. In each case the relevant Hamiltonian form is established bymaking use of the trase identity. 展开更多
关键词 THE TRACE IDENTITY A POWERFUL TOOL FOR CONSTRUCTING THE HAMILTONIAN STRUCTURE OF INTEGRABLE SYSTEMS
原文传递
Treatment Efficiency of Integrated Vertical-Flow Constructed Wetland for Saline Wastewater
12
作者 WANG Qishuo YANG Lei WU Zhenbin 《Wuhan University Journal of Natural Sciences》 CAS 2010年第6期544-548,共5页
The integrated vertical-flow constructed wetland(IVCW) was simulated with three suits of designed experiment columns planted with Kandelia candel.Units A,B and C were irrigated with sewage of different salinity(A... The integrated vertical-flow constructed wetland(IVCW) was simulated with three suits of designed experiment columns planted with Kandelia candel.Units A,B and C were irrigated with sewage of different salinity(A:10‰ B:20‰,C:30‰),respectively.The removal rates of dissolved organic carbon(DOC),NH3-N and NO3--N dropped 90.4%-48.6%,80.2%-40.3% and 84.8%-60.9%,respectively,when salinity increases from 10‰ to 30‰.The removal rate of TP increased 14%-31.2%,oppositely.A 20-day inflow salinity drastic change shock affective trial was done on units D and E.Unit D was used as a control and irrigated with saline sewage(20‰).Unit E was irrigated with sewage with low salinity(5‰) as a salinity drastic change shock on the third and fourth days.DOC,NH3-N and NO3--N removal efficiency of unit E showed a three-stage process of change,"rapidly decrease,increase beyond the normal standard,and then back to the normal standard".TP removal value was negative during the 2-day shock period. 展开更多
关键词 integrated vertical-flow constructed wetland(IVCW) saline wastewater treatment performance salinity shock
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部