Rapid developments in EHV/UHV transmission systems require a deeper understanding of the mechanism of long air gap discharge.Leader propagation is one of the main processes in long gap breakdown.In this paper,the lead...Rapid developments in EHV/UHV transmission systems require a deeper understanding of the mechanism of long air gap discharge.Leader propagation is one of the main processes in long gap breakdown.In this paper,the leader propagation characteristics of real size±800 kV UHVDC transmission tower gaps under positive switching impulse voltages(185/2290μs)are investigated.An integrated observation platform consisting of an impulse voltage divider,a coaxial shunt,a high-speed video camera,and a set of integrated optical electric field sensors(IOES),is established.The waveforms of impulse voltage,discharge current,electric field variation at specific positions,and time-resolved photographs of discharge morphology are recorded.Axial leader velocity and the relationship between leader advancements and injected charge are obtained.The typical value of leader stable propagation velocity is 1.7–2.2 cm/μs,which varies slightly with the gap length and applied voltage amplitude.The leader velocity in the re-illumination process is much higher,and is seen as varying from 5 cm/μs to 30 cm/μs,with an average value around 10 cm/μs.The charge in leader channel per unit length is 20–40μC/m,which illustrates a near-direct proportion relationship between discharge current and leader velocity.The observed parameters are important for further simulation of the tower gap breakdown processes.展开更多
Owner:Shanghai Tower Construction & Development Co.,Ltd.Contractor:Shanghai Construction Group Co.,Ltd.Architectural Designer:Gensler,USA Structural engineer:Thornton Tomasetti,USA Construction Drawing Designer:To...Owner:Shanghai Tower Construction & Development Co.,Ltd.Contractor:Shanghai Construction Group Co.,Ltd.Architectural Designer:Gensler,USA Structural engineer:Thornton Tomasetti,USA Construction Drawing Designer:Tongji Architectural Design(Group)Co.,Ltd.With a height of 632 m,the Shanghai Tower stands展开更多
基金supported by the National Natural Science Foundation of China under Grant 51325703,51377094Fund of the National Priority Basic Research of China(2011CB209403)。
文摘Rapid developments in EHV/UHV transmission systems require a deeper understanding of the mechanism of long air gap discharge.Leader propagation is one of the main processes in long gap breakdown.In this paper,the leader propagation characteristics of real size±800 kV UHVDC transmission tower gaps under positive switching impulse voltages(185/2290μs)are investigated.An integrated observation platform consisting of an impulse voltage divider,a coaxial shunt,a high-speed video camera,and a set of integrated optical electric field sensors(IOES),is established.The waveforms of impulse voltage,discharge current,electric field variation at specific positions,and time-resolved photographs of discharge morphology are recorded.Axial leader velocity and the relationship between leader advancements and injected charge are obtained.The typical value of leader stable propagation velocity is 1.7–2.2 cm/μs,which varies slightly with the gap length and applied voltage amplitude.The leader velocity in the re-illumination process is much higher,and is seen as varying from 5 cm/μs to 30 cm/μs,with an average value around 10 cm/μs.The charge in leader channel per unit length is 20–40μC/m,which illustrates a near-direct proportion relationship between discharge current and leader velocity.The observed parameters are important for further simulation of the tower gap breakdown processes.
文摘Owner:Shanghai Tower Construction & Development Co.,Ltd.Contractor:Shanghai Construction Group Co.,Ltd.Architectural Designer:Gensler,USA Structural engineer:Thornton Tomasetti,USA Construction Drawing Designer:Tongji Architectural Design(Group)Co.,Ltd.With a height of 632 m,the Shanghai Tower stands