This paper reports on two sets of centrifuge model tests of wind turbines in dry sand and saturated sand subjected to earthquake sequences.The wind turbine system is composed of a single pile foundation and a wind tur...This paper reports on two sets of centrifuge model tests of wind turbines in dry sand and saturated sand subjected to earthquake sequences.The wind turbine system is composed of a single pile foundation and a wind turbine.All tests were applied with liquefaction experiments and analysis projects(LEAP)waves to simplify the analysis.The objectives of the tests are to investigate:(1)the influence of earthquake history on the seismic response of wind turbines;(2)the influence of earthquake history on the dynamic pile-soil interaction;and(3)the influence of two different foundation types on the seismic response of wind turbines.The tests indicated that earthquake history has a significant influence on the natural frequency of the pile and the soil around the pile in the saturated sand,but has no obvious influence on the dry sand.The shear modulus of the soil and the acceleration amplification factor of the pile top in both tests increased and the maximum bending moment envelope of the single pile foundation shrunk.The stiffness of the p-y curve in saturated sand was increased by the earthquake history,while that in dry sand was not significantly affected.展开更多
In the past two decades,numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers,great bridges or to retain soil in potential geological hazard areas.However,drilling...In the past two decades,numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers,great bridges or to retain soil in potential geological hazard areas.However,drilling large-diameter rock-socketed pile holes with conventional drilling method such as rotary drilling or cable tool drilling is time-consuming and the cost is usually very high.In order to drill large-diameter rock-socketed pile holes faster at relatively low cost,the FGC15A large-diameter DTH air hammer drilling system was developed in 1987 and was given the second-class award by Ministry of Geology and Mineral Resources in 1991.Since it was innovated the drilling system has been used in more than twenty important and tough projects on land,and wonderful results were acquired.At the same time the large-diameter DTH air hammer drilling system was improved continuously.The FGC15D is the latest version of the technique.展开更多
Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and...Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.展开更多
基金Basic Science Center Program for Multiphase Media Evolution in Hypergravity of the National Natural Science Foundation of China under Grant No.51988101the National Natural Science Foundation of China under Grant No.51808490。
文摘This paper reports on two sets of centrifuge model tests of wind turbines in dry sand and saturated sand subjected to earthquake sequences.The wind turbine system is composed of a single pile foundation and a wind turbine.All tests were applied with liquefaction experiments and analysis projects(LEAP)waves to simplify the analysis.The objectives of the tests are to investigate:(1)the influence of earthquake history on the seismic response of wind turbines;(2)the influence of earthquake history on the dynamic pile-soil interaction;and(3)the influence of two different foundation types on the seismic response of wind turbines.The tests indicated that earthquake history has a significant influence on the natural frequency of the pile and the soil around the pile in the saturated sand,but has no obvious influence on the dry sand.The shear modulus of the soil and the acceleration amplification factor of the pile top in both tests increased and the maximum bending moment envelope of the single pile foundation shrunk.The stiffness of the p-y curve in saturated sand was increased by the earthquake history,while that in dry sand was not significantly affected.
文摘In the past two decades,numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers,great bridges or to retain soil in potential geological hazard areas.However,drilling large-diameter rock-socketed pile holes with conventional drilling method such as rotary drilling or cable tool drilling is time-consuming and the cost is usually very high.In order to drill large-diameter rock-socketed pile holes faster at relatively low cost,the FGC15A large-diameter DTH air hammer drilling system was developed in 1987 and was given the second-class award by Ministry of Geology and Mineral Resources in 1991.Since it was innovated the drilling system has been used in more than twenty important and tough projects on land,and wonderful results were acquired.At the same time the large-diameter DTH air hammer drilling system was improved continuously.The FGC15D is the latest version of the technique.
文摘Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.