期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
A Dynamic Input- Output Model Solution
1
作者 GENG Xian\|min Xinjiang Petroleum Institute, Urumqi 830000, China 《Systems Science and Systems Engineering》 CSCD 1999年第3期290-298,共9页
In this paper we research the homogeneous input output model of forward delay that lag is one production cycle. It is conformed that the necessary and sufficient conditions of economic balanced development are that t... In this paper we research the homogeneous input output model of forward delay that lag is one production cycle. It is conformed that the necessary and sufficient conditions of economic balanced development are that the output vector GENG Xian\|min Xinjiang Petroleum Institute, Urumqi 830000, ChinaAbstract:\ In this paper we research the homogeneous input output model of forward delay that lag is one production cycle. It is conformed that the necessary and sufficient conditions of economic balanced development are that the output vector X(t) is the right positive characteristic vector of (I-A) -1 (A+B), and the input vector is AX(t). We also constitute the workable economic subset S-,when the output vector of the first production cycle is X(1), the economy will surely collapse. 展开更多
关键词 input output consumption coefficient matrix investment coefficient matrix irreducible nonnegative matrix maximum characteristic value
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部