In the construction and maintenance of particle accelerators,all the accelerator elements should be installed in the same coordinate system,only in this way could the devices in the actual world be consistent with the...In the construction and maintenance of particle accelerators,all the accelerator elements should be installed in the same coordinate system,only in this way could the devices in the actual world be consistent with the design drawings.However,with the occurrence of the movements of the reinforced concrete cover plates at short notice or building deformations in the long term,the control points upon the engineering structure will be displaced,and the fitness between the subnetwork and the global control network may be irresponsible.Therefore,it is necessary to evaluate the deformations of the 3D alignment control network.Different from the extant investigations,in this paper,to characterize the deformations of the control network,all of the congruent models between the points measured in different epochs have been identified,and the congruence model with the most control points is considered as the primary or fundamental model,the remaining models are recognized as the additional ones.Furthermore,the discrepancies between the primary S-transformation parameters and the additional S-transformation parameters can reflect the relative movements of the additional congruence models.Both the iterative GCT method and the iterative combinatorial theory are proposed to detect multiple congruence models in the control network.Considering the actual work of the alignment,it is essential to identify the competitive models in the monitoring network,which can provide us a hint that,even the fitness between the subnetwork and the global control network is good,there are still deformations which may be ignored.The numerical experiments show that the suggested approaches can describe the deformation of the 3D alignment control network roundly.展开更多
The design of high current balance reactors used in the ITER DC testing platform is presented,which is verified by simulations with finite element method software,and the reactors are fabricated and tested according t...The design of high current balance reactors used in the ITER DC testing platform is presented,which is verified by simulations with finite element method software,and the reactors are fabricated and tested according to the design output.These reactors are chosen as multilayer multi-turn structure and cooled by water.The multilayer multi-turn structure is usually selected by some high voltage reactors,but is seldom used in high current situations.The analysis and testing results indicate that the multilayer multi-turn structure is also feasible for high current reactors with many advantages,and is of considerable significance to similar applications.展开更多
China, as one of the members of ITER (international thermonuclear experimental reactor) project, one of the most important construction tasks is the fabrication of the first wall panel and shield blankets, which is ...China, as one of the members of ITER (international thermonuclear experimental reactor) project, one of the most important construction tasks is the fabrication of the first wall panel and shield blankets, which is the key engineering technology of ITER construction and might be one of the crucial issues of the future reactor too. Since 2004, an associated research team including Southwestern Institute of Physics ( SWIP ), Ninxia Non-ferrous Metal Co. Itd and Chinese Institute of Engineering Physics, as well as Nuclear Power Institute of China has been established. Up to now, several series of interlayer for hot isostatic press ( HIP ) connection of beryllium and CuCrZr alloy have been tested. They are titanium film or coating, Cu coating and Al or AISiMg alloy etc. The bonding strength (tensile or shear strength ) of HIPed Be/Cu joints is up to 100 MPa.展开更多
文摘In the construction and maintenance of particle accelerators,all the accelerator elements should be installed in the same coordinate system,only in this way could the devices in the actual world be consistent with the design drawings.However,with the occurrence of the movements of the reinforced concrete cover plates at short notice or building deformations in the long term,the control points upon the engineering structure will be displaced,and the fitness between the subnetwork and the global control network may be irresponsible.Therefore,it is necessary to evaluate the deformations of the 3D alignment control network.Different from the extant investigations,in this paper,to characterize the deformations of the control network,all of the congruent models between the points measured in different epochs have been identified,and the congruence model with the most control points is considered as the primary or fundamental model,the remaining models are recognized as the additional ones.Furthermore,the discrepancies between the primary S-transformation parameters and the additional S-transformation parameters can reflect the relative movements of the additional congruence models.Both the iterative GCT method and the iterative combinatorial theory are proposed to detect multiple congruence models in the control network.Considering the actual work of the alignment,it is essential to identify the competitive models in the monitoring network,which can provide us a hint that,even the fitness between the subnetwork and the global control network is good,there are still deformations which may be ignored.The numerical experiments show that the suggested approaches can describe the deformation of the 3D alignment control network roundly.
文摘The design of high current balance reactors used in the ITER DC testing platform is presented,which is verified by simulations with finite element method software,and the reactors are fabricated and tested according to the design output.These reactors are chosen as multilayer multi-turn structure and cooled by water.The multilayer multi-turn structure is usually selected by some high voltage reactors,but is seldom used in high current situations.The analysis and testing results indicate that the multilayer multi-turn structure is also feasible for high current reactors with many advantages,and is of considerable significance to similar applications.
文摘China, as one of the members of ITER (international thermonuclear experimental reactor) project, one of the most important construction tasks is the fabrication of the first wall panel and shield blankets, which is the key engineering technology of ITER construction and might be one of the crucial issues of the future reactor too. Since 2004, an associated research team including Southwestern Institute of Physics ( SWIP ), Ninxia Non-ferrous Metal Co. Itd and Chinese Institute of Engineering Physics, as well as Nuclear Power Institute of China has been established. Up to now, several series of interlayer for hot isostatic press ( HIP ) connection of beryllium and CuCrZr alloy have been tested. They are titanium film or coating, Cu coating and Al or AISiMg alloy etc. The bonding strength (tensile or shear strength ) of HIPed Be/Cu joints is up to 100 MPa.