This paper proposes an optimum design model for the offshore jacket platform considering multidesign criteria, multi-design constraints and the structure-pile-soil interaction, and gives an optimum design procedure in...This paper proposes an optimum design model for the offshore jacket platform considering multidesign criteria, multi-design constraints and the structure-pile-soil interaction, and gives an optimum design procedure in which the proposed optimum design model is used together with structural analysis software SAP91 and optimum algorithm software OPB1. The Chengbei (#)11 offshore platform, which lies in the Shengli oilfield, is designed by use of the above optimum design model. The results show that the optimum design model is stable, and it depends on neither the optimization algorithm nor initial values of design variables. All values of the objective function converge to the same minimum value, and the speed of convergence is high, showing that the proposed optimum design model is reasonable.展开更多
Among numerous offshore structures used in oil extraction, jacket platforms are still the most favorable ones in shallow waters. In such structures, log piles are used to pin the substructure of the platform to the se...Among numerous offshore structures used in oil extraction, jacket platforms are still the most favorable ones in shallow waters. In such structures, log piles are used to pin the substructure of the platform to the seabed. The pile's geometrical and geotechnical properties are considered as the main parameters in designing these structures. In this study, ANSYS was used as the FE modeling software to study the geometrical and geotechnical properties of the offshore piles and their effects on supporting jacket platforms. For this purpose, the FE analysis has been done to provide the preliminary data for the fuzzy-logic post-process. The resulting data were implemented to create Fuzzy Inference System (FIS) classifications. The resultant data of the sensitivity analysis suggested that the orientation degree is the main factor in the pile's geometrical behavior because piles which had the optimal operational degree of about 5° arc more sustained. Finally, the results showed that the related fuzzified data supported the FE model and provided an insight for extended offshore pile designs.展开更多
Jacket cutting operation is one of the most complicated and highest risk operations in the process of decommissioning offshore piled platform, the security and stability of which must be assured. In this paper, the cu...Jacket cutting operation is one of the most complicated and highest risk operations in the process of decommissioning offshore piled platform, the security and stability of which must be assured. In this paper, the current research on offshore structure removal and jacket cutting is introduced, on the basis of which the types of load along with the load calculation method are determined. The main influences on the stability of a jacket in cutting are analyzed. The experiment test plan is drawn by using orthogonal testing method, and the formula of critical load during the cutting procedure is deduced by differential evolution algorithm. To verify the method and results of this paper, an offshore piled platform to be decommissioned in the South China Sea is taken for an example, and the detailed schedule for jacket cutting is made with the three-dimensional finite element model of the jacket established. The natural frequency, stress, strain and stability of the jacket during cutting process are calculated, which indicates that the results of finite element analysis agree well with that of the deduced formula. The result provides the scientific reference for guaranteeing the safety of jacket in cutting operation.展开更多
In this paper, reliability analysis for the offshore jacket platform with the interaction of structure- pile- soil under extreme environmental loads is carried out. The inherent uncertainties of the environmental load...In this paper, reliability analysis for the offshore jacket platform with the interaction of structure- pile- soil under extreme environmental loads is carried out. The inherent uncertainties of the environmental load, foundation soil, platform itself, and calculating models are evaluated. The action of extreme loads on the offshore platform is modeled as a function of extreme wave height. The system capacity of the whole platform is determined by nonlinear pushover analysis, and the relevant probability property is obtained by the simulation method. The reliability model for the whole jacket platform is described as the relationship between the load and resistance based on the offshore design codes. The reliability of whole platform is calculated by the analytical method and the importance sampling method on the basis of a case study for a tripod jacket platform.展开更多
基金National Natural Science Foundation of China(Grant No.59895410)
文摘This paper proposes an optimum design model for the offshore jacket platform considering multidesign criteria, multi-design constraints and the structure-pile-soil interaction, and gives an optimum design procedure in which the proposed optimum design model is used together with structural analysis software SAP91 and optimum algorithm software OPB1. The Chengbei (#)11 offshore platform, which lies in the Shengli oilfield, is designed by use of the above optimum design model. The results show that the optimum design model is stable, and it depends on neither the optimization algorithm nor initial values of design variables. All values of the objective function converge to the same minimum value, and the speed of convergence is high, showing that the proposed optimum design model is reasonable.
文摘Among numerous offshore structures used in oil extraction, jacket platforms are still the most favorable ones in shallow waters. In such structures, log piles are used to pin the substructure of the platform to the seabed. The pile's geometrical and geotechnical properties are considered as the main parameters in designing these structures. In this study, ANSYS was used as the FE modeling software to study the geometrical and geotechnical properties of the offshore piles and their effects on supporting jacket platforms. For this purpose, the FE analysis has been done to provide the preliminary data for the fuzzy-logic post-process. The resulting data were implemented to create Fuzzy Inference System (FIS) classifications. The resultant data of the sensitivity analysis suggested that the orientation degree is the main factor in the pile's geometrical behavior because piles which had the optimal operational degree of about 5° arc more sustained. Finally, the results showed that the related fuzzified data supported the FE model and provided an insight for extended offshore pile designs.
基金financially supported by the National Basic Research Program of China(973 Program,Grant No.2011CB013702)the National Natural Science Foundation of China(Grant No.51379214)the National High Technology Research and Development Program of China(863 Program,Grant No.2008AA092701-3)
文摘Jacket cutting operation is one of the most complicated and highest risk operations in the process of decommissioning offshore piled platform, the security and stability of which must be assured. In this paper, the current research on offshore structure removal and jacket cutting is introduced, on the basis of which the types of load along with the load calculation method are determined. The main influences on the stability of a jacket in cutting are analyzed. The experiment test plan is drawn by using orthogonal testing method, and the formula of critical load during the cutting procedure is deduced by differential evolution algorithm. To verify the method and results of this paper, an offshore piled platform to be decommissioned in the South China Sea is taken for an example, and the detailed schedule for jacket cutting is made with the three-dimensional finite element model of the jacket established. The natural frequency, stress, strain and stability of the jacket during cutting process are calculated, which indicates that the results of finite element analysis agree well with that of the deduced formula. The result provides the scientific reference for guaranteeing the safety of jacket in cutting operation.
文摘In this paper, reliability analysis for the offshore jacket platform with the interaction of structure- pile- soil under extreme environmental loads is carried out. The inherent uncertainties of the environmental load, foundation soil, platform itself, and calculating models are evaluated. The action of extreme loads on the offshore platform is modeled as a function of extreme wave height. The system capacity of the whole platform is determined by nonlinear pushover analysis, and the relevant probability property is obtained by the simulation method. The reliability model for the whole jacket platform is described as the relationship between the load and resistance based on the offshore design codes. The reliability of whole platform is calculated by the analytical method and the importance sampling method on the basis of a case study for a tripod jacket platform.