Because of the high requirement of quality,vile working environment and great difficulty of automatic welding,MMAW is usually adopted for the welding of the platform jacket and the pile pipe.Its low efficiency and har...Because of the high requirement of quality,vile working environment and great difficulty of automatic welding,MMAW is usually adopted for the welding of the platform jacket and the pile pipe.Its low efficiency and hard working is one of the choke points for construction progress. In this article,an up-to-date technology for platform pile pipe welding was introduced. Cored with FCW-S and combined with the characters and requirements of platform construction,the special automatic horizontal welding equipment and process were developed. Further more,the offshore application were introduced too.展开更多
This paper proposes an optimum design model for the offshore jacket platform considering multidesign criteria, multi-design constraints and the structure-pile-soil interaction, and gives an optimum design procedure in...This paper proposes an optimum design model for the offshore jacket platform considering multidesign criteria, multi-design constraints and the structure-pile-soil interaction, and gives an optimum design procedure in which the proposed optimum design model is used together with structural analysis software SAP91 and optimum algorithm software OPB1. The Chengbei (#)11 offshore platform, which lies in the Shengli oilfield, is designed by use of the above optimum design model. The results show that the optimum design model is stable, and it depends on neither the optimization algorithm nor initial values of design variables. All values of the objective function converge to the same minimum value, and the speed of convergence is high, showing that the proposed optimum design model is reasonable.展开更多
Among numerous offshore structures used in oil extraction, jacket platforms are still the most favorable ones in shallow waters. In such structures, log piles are used to pin the substructure of the platform to the se...Among numerous offshore structures used in oil extraction, jacket platforms are still the most favorable ones in shallow waters. In such structures, log piles are used to pin the substructure of the platform to the seabed. The pile's geometrical and geotechnical properties are considered as the main parameters in designing these structures. In this study, ANSYS was used as the FE modeling software to study the geometrical and geotechnical properties of the offshore piles and their effects on supporting jacket platforms. For this purpose, the FE analysis has been done to provide the preliminary data for the fuzzy-logic post-process. The resulting data were implemented to create Fuzzy Inference System (FIS) classifications. The resultant data of the sensitivity analysis suggested that the orientation degree is the main factor in the pile's geometrical behavior because piles which had the optimal operational degree of about 5° arc more sustained. Finally, the results showed that the related fuzzified data supported the FE model and provided an insight for extended offshore pile designs.展开更多
This paper proposes the finite element simplified fatigue analysis method for fatigue evaluation of the composite non-tubular joint structure of an offshore jacket subjected to wave loads. The skirt pile sleeve of the...This paper proposes the finite element simplified fatigue analysis method for fatigue evaluation of the composite non-tubular joint structure of an offshore jacket subjected to wave loads. The skirt pile sleeve of the offshore jacket, which had been in service, was taken as an example of the non-tubular joint structure. SACS software was used for global analysis of multi-directional wave loads for the jacket platform, and ALGOR software was used to build a finite element model, perform finite element analysis, post-process stress results for acquiring the stress range, and perform fatigue evaluation. The analysis results indicate that the extreme stress range is within the allowable stress range and meets the requirements of DNV code. That means the simplified fatigue analysis method is effective and can be used in fatigue design for the non-tubular joint structure of an offshore jacket.展开更多
Jacket cutting operation is one of the most complicated and highest risk operations in the process of decommissioning offshore piled platform, the security and stability of which must be assured. In this paper, the cu...Jacket cutting operation is one of the most complicated and highest risk operations in the process of decommissioning offshore piled platform, the security and stability of which must be assured. In this paper, the current research on offshore structure removal and jacket cutting is introduced, on the basis of which the types of load along with the load calculation method are determined. The main influences on the stability of a jacket in cutting are analyzed. The experiment test plan is drawn by using orthogonal testing method, and the formula of critical load during the cutting procedure is deduced by differential evolution algorithm. To verify the method and results of this paper, an offshore piled platform to be decommissioned in the South China Sea is taken for an example, and the detailed schedule for jacket cutting is made with the three-dimensional finite element model of the jacket established. The natural frequency, stress, strain and stability of the jacket during cutting process are calculated, which indicates that the results of finite element analysis agree well with that of the deduced formula. The result provides the scientific reference for guaranteeing the safety of jacket in cutting operation.展开更多
In this paper, reliability analysis for the offshore jacket platform with the interaction of structure- pile- soil under extreme environmental loads is carried out. The inherent uncertainties of the environmental load...In this paper, reliability analysis for the offshore jacket platform with the interaction of structure- pile- soil under extreme environmental loads is carried out. The inherent uncertainties of the environmental load, foundation soil, platform itself, and calculating models are evaluated. The action of extreme loads on the offshore platform is modeled as a function of extreme wave height. The system capacity of the whole platform is determined by nonlinear pushover analysis, and the relevant probability property is obtained by the simulation method. The reliability model for the whole jacket platform is described as the relationship between the load and resistance based on the offshore design codes. The reliability of whole platform is calculated by the analytical method and the importance sampling method on the basis of a case study for a tripod jacket platform.展开更多
The rapid development of offshore wind power and the need to move to deeper sea areas while reducing costs per kilowatt necessitate the employment of a new jacket and helical pile combination.This new combination comb...The rapid development of offshore wind power and the need to move to deeper sea areas while reducing costs per kilowatt necessitate the employment of a new jacket and helical pile combination.This new combination combines the advantages of both jacket structures and helical piles and provides a superior bearing capacity and installation efficiency compared to conventional pile foundations.Foundations account for 25%-34%of the overall cost of construction,but the use of this new foundation would be highly significant for the further development of offshore wind power.This study presents numerical results for the horizontal bearing capacity when horizontal displacement is applied,focusing on the bearing capacity and characteristics of the helical pile jacket foundation as well as the differences between the bearing mechanisms and failure modes of normal pile and helical pile types.ABAQUS model parameters are obtained through trial calculations based on actual engineering data,and the finite element model(FEM)is validated using data from a model experiment.Subsequently,different FEMs are established,and numerical results are compared and presented.Through a comparison between a normal pile jacket foundation and a helical pile jacket foundation with different helical blade numbers,the differences in the bearing mechanisms and failure modes are revealed.The failure of the normal pile jacket foundation is instantaneous and sudden,whereas that of the helical pile foundation is incremental and accumulative.These data highlight the most significant contributions and vulnerabilities of the one-pile side of the foundation and suggest that the addition of blades on the one-pile side is the most effective way of improving the foundation’s bearing performance.In addition,the interaction between the compression side and tension side is analyzed in relation to differing the relative magnitudes of their bearing capacities.展开更多
文摘Because of the high requirement of quality,vile working environment and great difficulty of automatic welding,MMAW is usually adopted for the welding of the platform jacket and the pile pipe.Its low efficiency and hard working is one of the choke points for construction progress. In this article,an up-to-date technology for platform pile pipe welding was introduced. Cored with FCW-S and combined with the characters and requirements of platform construction,the special automatic horizontal welding equipment and process were developed. Further more,the offshore application were introduced too.
基金National Natural Science Foundation of China(Grant No.59895410)
文摘This paper proposes an optimum design model for the offshore jacket platform considering multidesign criteria, multi-design constraints and the structure-pile-soil interaction, and gives an optimum design procedure in which the proposed optimum design model is used together with structural analysis software SAP91 and optimum algorithm software OPB1. The Chengbei (#)11 offshore platform, which lies in the Shengli oilfield, is designed by use of the above optimum design model. The results show that the optimum design model is stable, and it depends on neither the optimization algorithm nor initial values of design variables. All values of the objective function converge to the same minimum value, and the speed of convergence is high, showing that the proposed optimum design model is reasonable.
文摘Among numerous offshore structures used in oil extraction, jacket platforms are still the most favorable ones in shallow waters. In such structures, log piles are used to pin the substructure of the platform to the seabed. The pile's geometrical and geotechnical properties are considered as the main parameters in designing these structures. In this study, ANSYS was used as the FE modeling software to study the geometrical and geotechnical properties of the offshore piles and their effects on supporting jacket platforms. For this purpose, the FE analysis has been done to provide the preliminary data for the fuzzy-logic post-process. The resulting data were implemented to create Fuzzy Inference System (FIS) classifications. The resultant data of the sensitivity analysis suggested that the orientation degree is the main factor in the pile's geometrical behavior because piles which had the optimal operational degree of about 5° arc more sustained. Finally, the results showed that the related fuzzified data supported the FE model and provided an insight for extended offshore pile designs.
文摘This paper proposes the finite element simplified fatigue analysis method for fatigue evaluation of the composite non-tubular joint structure of an offshore jacket subjected to wave loads. The skirt pile sleeve of the offshore jacket, which had been in service, was taken as an example of the non-tubular joint structure. SACS software was used for global analysis of multi-directional wave loads for the jacket platform, and ALGOR software was used to build a finite element model, perform finite element analysis, post-process stress results for acquiring the stress range, and perform fatigue evaluation. The analysis results indicate that the extreme stress range is within the allowable stress range and meets the requirements of DNV code. That means the simplified fatigue analysis method is effective and can be used in fatigue design for the non-tubular joint structure of an offshore jacket.
基金financially supported by the National Basic Research Program of China(973 Program,Grant No.2011CB013702)the National Natural Science Foundation of China(Grant No.51379214)the National High Technology Research and Development Program of China(863 Program,Grant No.2008AA092701-3)
文摘Jacket cutting operation is one of the most complicated and highest risk operations in the process of decommissioning offshore piled platform, the security and stability of which must be assured. In this paper, the current research on offshore structure removal and jacket cutting is introduced, on the basis of which the types of load along with the load calculation method are determined. The main influences on the stability of a jacket in cutting are analyzed. The experiment test plan is drawn by using orthogonal testing method, and the formula of critical load during the cutting procedure is deduced by differential evolution algorithm. To verify the method and results of this paper, an offshore piled platform to be decommissioned in the South China Sea is taken for an example, and the detailed schedule for jacket cutting is made with the three-dimensional finite element model of the jacket established. The natural frequency, stress, strain and stability of the jacket during cutting process are calculated, which indicates that the results of finite element analysis agree well with that of the deduced formula. The result provides the scientific reference for guaranteeing the safety of jacket in cutting operation.
文摘In this paper, reliability analysis for the offshore jacket platform with the interaction of structure- pile- soil under extreme environmental loads is carried out. The inherent uncertainties of the environmental load, foundation soil, platform itself, and calculating models are evaluated. The action of extreme loads on the offshore platform is modeled as a function of extreme wave height. The system capacity of the whole platform is determined by nonlinear pushover analysis, and the relevant probability property is obtained by the simulation method. The reliability model for the whole jacket platform is described as the relationship between the load and resistance based on the offshore design codes. The reliability of whole platform is calculated by the analytical method and the importance sampling method on the basis of a case study for a tripod jacket platform.
文摘The rapid development of offshore wind power and the need to move to deeper sea areas while reducing costs per kilowatt necessitate the employment of a new jacket and helical pile combination.This new combination combines the advantages of both jacket structures and helical piles and provides a superior bearing capacity and installation efficiency compared to conventional pile foundations.Foundations account for 25%-34%of the overall cost of construction,but the use of this new foundation would be highly significant for the further development of offshore wind power.This study presents numerical results for the horizontal bearing capacity when horizontal displacement is applied,focusing on the bearing capacity and characteristics of the helical pile jacket foundation as well as the differences between the bearing mechanisms and failure modes of normal pile and helical pile types.ABAQUS model parameters are obtained through trial calculations based on actual engineering data,and the finite element model(FEM)is validated using data from a model experiment.Subsequently,different FEMs are established,and numerical results are compared and presented.Through a comparison between a normal pile jacket foundation and a helical pile jacket foundation with different helical blade numbers,the differences in the bearing mechanisms and failure modes are revealed.The failure of the normal pile jacket foundation is instantaneous and sudden,whereas that of the helical pile foundation is incremental and accumulative.These data highlight the most significant contributions and vulnerabilities of the one-pile side of the foundation and suggest that the addition of blades on the one-pile side is the most effective way of improving the foundation’s bearing performance.In addition,the interaction between the compression side and tension side is analyzed in relation to differing the relative magnitudes of their bearing capacities.