Shipbuilding production management and logistics control are studied so as to find an advanced shipbuilding production logistics management style.The necessity and feasibility to integrate MRP-Ⅱ(manufacture resource ...Shipbuilding production management and logistics control are studied so as to find an advanced shipbuilding production logistics management style.The necessity and feasibility to integrate MRP-Ⅱ(manufacture resource planning)and JIT(just-in-time)are researched properly following the comparison of MRP-Ⅱ and JIT and the analysis of shipbuilding production characteristics.A shipbuilding logistics system combining MRP-Ⅱ with JIT is set up and discussed according to a master production schedule(MPS),MRP and workshop-floor production control.The system is able to simplify the shipbuilding production plan,balance the workshop production,stabilize the supply,and inspire positivity and creativity so as to raise the shipbuilding production management level.展开更多
Basing on the advanced foreign management theory and methods, introducing MRP-Ⅱ having DSS function and combining Chinese conditions, we present in this paper a method of embedding the block of “lot size” producti...Basing on the advanced foreign management theory and methods, introducing MRP-Ⅱ having DSS function and combining Chinese conditions, we present in this paper a method of embedding the block of “lot size” production in MRP-Ⅱ.展开更多
基金The National Key Technology R&D Program of China during the 11th Five-Year Plan Period(No.2006BAH02A06)
文摘Shipbuilding production management and logistics control are studied so as to find an advanced shipbuilding production logistics management style.The necessity and feasibility to integrate MRP-Ⅱ(manufacture resource planning)and JIT(just-in-time)are researched properly following the comparison of MRP-Ⅱ and JIT and the analysis of shipbuilding production characteristics.A shipbuilding logistics system combining MRP-Ⅱ with JIT is set up and discussed according to a master production schedule(MPS),MRP and workshop-floor production control.The system is able to simplify the shipbuilding production plan,balance the workshop production,stabilize the supply,and inspire positivity and creativity so as to raise the shipbuilding production management level.
文摘Basing on the advanced foreign management theory and methods, introducing MRP-Ⅱ having DSS function and combining Chinese conditions, we present in this paper a method of embedding the block of “lot size” production in MRP-Ⅱ.