The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s...The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.展开更多
For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitorin...For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high展开更多
A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial n...A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.展开更多
With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into th...With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.展开更多
For the purpose of realizing the information visualization of hydropower engineering management, we construeted three kinds of graphics models sorted by hierarchy for system modelling, employed the construction simula...For the purpose of realizing the information visualization of hydropower engineering management, we construeted three kinds of graphics models sorted by hierarchy for system modelling, employed the construction simulation system to simulate the real-time construction behaviours, introduced the graphics rendering system to organize and update the virtual scene, and designed the interaction system to respond to the user-initiated and simulation-initiated events. So, the real-time, interactive visualization aided system of hydropower engineering management is developed. Eventually, the effectiveness and capabilities of the system are showed through the application examples in China.展开更多
A comprehensive safety evaluation system taking the most influential factors into account has been developed to evaluate the reliability of hydraulic metal structures. Applying the techniques of AI and DB, the idea of...A comprehensive safety evaluation system taking the most influential factors into account has been developed to evaluate the reliability of hydraulic metal structures. Applying the techniques of AI and DB, the idea of a one-machine and three-base system is proposed. The framework of the three-base system has been designed and the structural framework constructed in turn. A practical example is given to illustrate the process of using this system and it can be used for comparison and analysis purposes. The key technology of the system is its ability to reorganize and improve the expert system's knowledge base by establishing the expert system. This system utilizes the computer technology inference process, making safety evaluation conclusions more reasonable and applicable to the actual situation. The system is not only advanced, but also feasible, reliable, artificially intelligent, and has the capacity to constantly grow.展开更多
Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studi...Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studied in this paper. The Lagrange function contains the penalty terms on equality and inequality constraints and the methods can be applied to solve a series of bound constrained sub-problems instead of a series of unconstrained sub-problems. The steps of the methods are examined in full detail. Numerical experiments are made for a variety of problems, from small to very large-scale, which show the stability and effectiveness of the methods in large-scale problems.展开更多
The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the ...The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.展开更多
In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydr...In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydropower projects in deep river valley,the stabilization techniques for underground cavern group with large span and high side walls are introduced in this paper.As for rock engineering and technology in highway and railway construction,the Qinghai-Tibet Railway — new construction techniques in permafrost,the support techniques for large squeezing deformation in Wuqiaoling Tunnel,the construction techniques for tunnels in alpine and high-altitude region,the geological prediction techniques for tunnels in karst region,the microseismic monitoring and early warning techniques for rockbursts in deep and long tunnels are presented.For rock engineering and technology inmining engineering,the innovative techniques for roadway support inmines,the simultaneous extraction technique of pillarless coal and gas in coal seams with low permeability,the safe and efficient deep openmining technology,advances in monitoring,early warning and treatment ofmine dynamic disasters are discussed.In addition,the new anchorage techniques and precision blasting technique in rock engineering are introduced.展开更多
In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hy...In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors.展开更多
Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic...Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic equations of the method are first set up, and then the mode cut-off principle and the dividing principle are proposed. MATLAB is used for simulation in different frame structures. The simulation results demonstrate the applicability of this substructure method to civil engineering structures and the correctness of the proposed mode cut-off principle. Studies are also conducted on how to divide the whole structure for better computation efficiency while maintaining better precision. It is observed that the geometry and material properties should be considered, and the synthesis results would be more precise when the inflection points of the mode shapes are taken into consideration. Furthermore, the simulation performed on a large-scale high-rise connected structure further proves the feasibility and efficiency of this modal synthesis method compared with the traditional global method. It is also concluded from the simulation results that the fewer number of DOFs in each substructure will result in better computation efficiency, but too many substructures will be time-consuming due to the tedious synthesis procedures. Moreover, the substructures with free interface will introduce errors and reduce the precision dramatically, which should be avoided.展开更多
To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is...To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is an integration of project construction and engineering culture.However,engineering culture development enjoys its own particularity as a project is constructed once only within a limited period of time.This paper gives affirmative opinion that engineering culture development in large-scale projects backs project management on the basis of thorough investigation of engineering culture development in Sutong Bridge Project and after deepened analysis,proposes new thinking pattern of engineering culture development in large-scale projects in a systematic manner,including thorough understanding of the essence of engineering culture,principle and contents of engineering culture development as well as efficient method in respect of establishment and implementation of engineering culture,and therefore provides a standard reference and systematic thinking pattern for engineering culture development in future large-scale projects.展开更多
This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D ...This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D visualization based on GIS, then discusses the method of constructing 3D visual digital model, and then introduces the terrain digital technology, feature modeling technology. Finally, the technical route shows that this method has good practicability.展开更多
为了解决水利水电项目建设中任务量大、专业技能多、操作难度高、环境干扰严重的问题,往往要进行多次论证和优化工程步骤,保证施工质量。采用BIM(Building Information Modeling)+GIS(Geographic Information System)技术对水利建筑模...为了解决水利水电项目建设中任务量大、专业技能多、操作难度高、环境干扰严重的问题,往往要进行多次论证和优化工程步骤,保证施工质量。采用BIM(Building Information Modeling)+GIS(Geographic Information System)技术对水利建筑模型进行优化,并对建筑进行外观设计,为模型的搭建提供坚实基础。结果表明,在水利水电项目建设过程中,以BIM+GIS技术模型为基础可快速模拟待查找的工程进度,有利于管控工程资金和监督工程实施进度,可以大幅度提升水利项目的信息化程度。展开更多
文摘The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.
基金supported by the National Natural Science Foundation of China(Grants No.51179108and50909066)the Key Research Foundation of Nanjing Hydraulic Research Institute(Grant No.Y711007)
文摘For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high
基金supported by the National Basic Research Program of China (973 Program, No. 2013CB035904)the Innovative Research Groups of the National Natural Science Foundation of China (No. 51321065)the National Natural Science Foundation of China (No. 51439005)
基金Supported bythe National 973 Programof China(No.2003CB716705) International Cooperative Fund of European Union(No.EVGI-CT-2002-00061) .
文摘A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.
文摘With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.
基金funded by National Natural Science Foundation of China (No.60574071)
文摘For the purpose of realizing the information visualization of hydropower engineering management, we construeted three kinds of graphics models sorted by hierarchy for system modelling, employed the construction simulation system to simulate the real-time construction behaviours, introduced the graphics rendering system to organize and update the virtual scene, and designed the interaction system to respond to the user-initiated and simulation-initiated events. So, the real-time, interactive visualization aided system of hydropower engineering management is developed. Eventually, the effectiveness and capabilities of the system are showed through the application examples in China.
基金supported by the National Natural Science Foundation of China (Grant No. 50539010)
文摘A comprehensive safety evaluation system taking the most influential factors into account has been developed to evaluate the reliability of hydraulic metal structures. Applying the techniques of AI and DB, the idea of a one-machine and three-base system is proposed. The framework of the three-base system has been designed and the structural framework constructed in turn. A practical example is given to illustrate the process of using this system and it can be used for comparison and analysis purposes. The key technology of the system is its ability to reorganize and improve the expert system's knowledge base by establishing the expert system. This system utilizes the computer technology inference process, making safety evaluation conclusions more reasonable and applicable to the actual situation. The system is not only advanced, but also feasible, reliable, artificially intelligent, and has the capacity to constantly grow.
文摘Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studied in this paper. The Lagrange function contains the penalty terms on equality and inequality constraints and the methods can be applied to solve a series of bound constrained sub-problems instead of a series of unconstrained sub-problems. The steps of the methods are examined in full detail. Numerical experiments are made for a variety of problems, from small to very large-scale, which show the stability and effectiveness of the methods in large-scale problems.
文摘The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.
文摘In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydropower projects in deep river valley,the stabilization techniques for underground cavern group with large span and high side walls are introduced in this paper.As for rock engineering and technology in highway and railway construction,the Qinghai-Tibet Railway — new construction techniques in permafrost,the support techniques for large squeezing deformation in Wuqiaoling Tunnel,the construction techniques for tunnels in alpine and high-altitude region,the geological prediction techniques for tunnels in karst region,the microseismic monitoring and early warning techniques for rockbursts in deep and long tunnels are presented.For rock engineering and technology inmining engineering,the innovative techniques for roadway support inmines,the simultaneous extraction technique of pillarless coal and gas in coal seams with low permeability,the safe and efficient deep openmining technology,advances in monitoring,early warning and treatment ofmine dynamic disasters are discussed.In addition,the new anchorage techniques and precision blasting technique in rock engineering are introduced.
文摘In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors.
基金Supported by the National Natural Science Foundation of China(No.51108089)Doctoral Programs Foundation of Ministry of Education of China(No.20113514120005)the Foundation of the Education Department of Fujian Province(No.JA14057)
文摘Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic equations of the method are first set up, and then the mode cut-off principle and the dividing principle are proposed. MATLAB is used for simulation in different frame structures. The simulation results demonstrate the applicability of this substructure method to civil engineering structures and the correctness of the proposed mode cut-off principle. Studies are also conducted on how to divide the whole structure for better computation efficiency while maintaining better precision. It is observed that the geometry and material properties should be considered, and the synthesis results would be more precise when the inflection points of the mode shapes are taken into consideration. Furthermore, the simulation performed on a large-scale high-rise connected structure further proves the feasibility and efficiency of this modal synthesis method compared with the traditional global method. It is also concluded from the simulation results that the fewer number of DOFs in each substructure will result in better computation efficiency, but too many substructures will be time-consuming due to the tedious synthesis procedures. Moreover, the substructures with free interface will introduce errors and reduce the precision dramatically, which should be avoided.
基金National Science and Technology Support Program(No.2006BAG04B06)
文摘To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is an integration of project construction and engineering culture.However,engineering culture development enjoys its own particularity as a project is constructed once only within a limited period of time.This paper gives affirmative opinion that engineering culture development in large-scale projects backs project management on the basis of thorough investigation of engineering culture development in Sutong Bridge Project and after deepened analysis,proposes new thinking pattern of engineering culture development in large-scale projects in a systematic manner,including thorough understanding of the essence of engineering culture,principle and contents of engineering culture development as well as efficient method in respect of establishment and implementation of engineering culture,and therefore provides a standard reference and systematic thinking pattern for engineering culture development in future large-scale projects.
文摘This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D visualization based on GIS, then discusses the method of constructing 3D visual digital model, and then introduces the terrain digital technology, feature modeling technology. Finally, the technical route shows that this method has good practicability.
文摘为了解决水利水电项目建设中任务量大、专业技能多、操作难度高、环境干扰严重的问题,往往要进行多次论证和优化工程步骤,保证施工质量。采用BIM(Building Information Modeling)+GIS(Geographic Information System)技术对水利建筑模型进行优化,并对建筑进行外观设计,为模型的搭建提供坚实基础。结果表明,在水利水电项目建设过程中,以BIM+GIS技术模型为基础可快速模拟待查找的工程进度,有利于管控工程资金和监督工程实施进度,可以大幅度提升水利项目的信息化程度。