In order to more effectively assess the health status of a project, the monitoring indices in a project's life cycle are divided into quality index, cost index, time index, satisfaction index, and sustainable develop...In order to more effectively assess the health status of a project, the monitoring indices in a project's life cycle are divided into quality index, cost index, time index, satisfaction index, and sustainable development index. Based on the feature of qualitative and quantitative indices combining, the PCA-PR (principal component analysis and pattern recognition) model is constructed. The model first analyzes the principal components of the life-cycle indices system constructed above, and picks up those principal component indices that can reflect the health status of a project at any time. Then the pattern recognition model is used to study these principal components, which means that the real time health status of the project can be divided into five lamps from a green lamp to a red one and the health status lamp of the project can be recognized by using the PR model and those principal components. Finally, the process is shown with a real example and a conclusion consistent with the actual situation is drawn. So the validity of the index system and the PCA-PR model can be confirmed.展开更多
During the coronavirus disease 2019 (COVID-19) emergency, many hospitals were built or renovated around the world to meet the challenges posed by the rising number of infected cases. Environmental management in the ho...During the coronavirus disease 2019 (COVID-19) emergency, many hospitals were built or renovated around the world to meet the challenges posed by the rising number of infected cases. Environmental management in the hospital life cycle is vital in preventing nosocomial infection and includes many infection control procedures. In certain urgent situations, a hospital must be completed quickly, and work process approval and supervision must therefore be accelerated. Thus, many works cannot be checked in detail. This results in a lack of work liability control and increases the difficulty of ensuring the fulfillment of key infection prevention measures. This study investigates how blockchain technology can transform the work quality inspection workflow to assist in nosocomial infection control under a fast delivery requirement. A blockchain-based life-cycle environmental management framework is proposed to track the fulfillment of crucial infection control measures in the design, construction, and operation stages of hospitals. The proposed framework allows for work quality checking after the work is completed, when some work cannot be checked on time. Illustrative use cases are selected to demonstrate the capabilities of the developed solution. This study provides new insights into applying blockchain technology to address the challenge of environmental management brought by rapid delivery requirements.展开更多
基金The Social Science Fund of Hebei Province (No.200607011)the Key Science and Technology Project of Hebei Province(No.07213529)
文摘In order to more effectively assess the health status of a project, the monitoring indices in a project's life cycle are divided into quality index, cost index, time index, satisfaction index, and sustainable development index. Based on the feature of qualitative and quantitative indices combining, the PCA-PR (principal component analysis and pattern recognition) model is constructed. The model first analyzes the principal components of the life-cycle indices system constructed above, and picks up those principal component indices that can reflect the health status of a project at any time. Then the pattern recognition model is used to study these principal components, which means that the real time health status of the project can be divided into five lamps from a green lamp to a red one and the health status lamp of the project can be recognized by using the PR model and those principal components. Finally, the process is shown with a real example and a conclusion consistent with the actual situation is drawn. So the validity of the index system and the PCA-PR model can be confirmed.
基金supported by the National Natural Science Foundation of China(71732001,51878311,72271106,U21A20151,and 71821001)Engineering Fronts Project(2021-HYZD-5-13)+1 种基金Major Science&Technology Project of Hubei(2020ACA006)China Scholarship Council(202006160115).
文摘During the coronavirus disease 2019 (COVID-19) emergency, many hospitals were built or renovated around the world to meet the challenges posed by the rising number of infected cases. Environmental management in the hospital life cycle is vital in preventing nosocomial infection and includes many infection control procedures. In certain urgent situations, a hospital must be completed quickly, and work process approval and supervision must therefore be accelerated. Thus, many works cannot be checked in detail. This results in a lack of work liability control and increases the difficulty of ensuring the fulfillment of key infection prevention measures. This study investigates how blockchain technology can transform the work quality inspection workflow to assist in nosocomial infection control under a fast delivery requirement. A blockchain-based life-cycle environmental management framework is proposed to track the fulfillment of crucial infection control measures in the design, construction, and operation stages of hospitals. The proposed framework allows for work quality checking after the work is completed, when some work cannot be checked on time. Illustrative use cases are selected to demonstrate the capabilities of the developed solution. This study provides new insights into applying blockchain technology to address the challenge of environmental management brought by rapid delivery requirements.