A strategy of developing on-line optimization intelligent systems based on combiningflowsheeting simulation and optimization package with artificial neural networks(ANN)is presented inthis paper.A number of optimizati...A strategy of developing on-line optimization intelligent systems based on combiningflowsheeting simulation and optimization package with artificial neural networks(ANN)is presented inthis paper.A number of optimization cases for a certain chemical plant are obtained off-line byusing PROCESS-Ⅱ or other flowsheeting programming with optimization.Then,taking these cases astraining examples,we establish a neural network systems which can be used on-line as an optimizer toobtain setpoints from input data sampled from distributed control system through gross error detectionand data reconciliation procedures.Such an on-line optimizer possesses two advantages over nonlinearprogramming package:first of all,there is no convergence problem for the trained ANN to be usedonline;secondly,the frequency for setpoints updating is not limited because only algebraic calculationrather than optimization is required to be carried out on-line.Here two key problems ofimplementing ANN approaches to the on-line optimization展开更多
Several industrial computers and a server are combined to set up the on-line monitoring and diagnostic system of turbo-generator sets. The main function of the system is to monitor machine sets' running condition....Several industrial computers and a server are combined to set up the on-line monitoring and diagnostic system of turbo-generator sets. The main function of the system is to monitor machine sets' running condition. Through analyzing running data, technicians can detect whether there exist faults and where they occur. To share and transmit the dynamic information of the turbo-generator sets, a distributed network system is introduced. NetWare network operating system is used in the LAN (Local Area Network) system. The LAN is extended to realize the sharing of data and remote transmission of information. Furthermore, functions of monitoring and diagnostic clients are listed.展开更多
A flat neural network is designed for the on line state prediction of engine. To reduce the computational cost of weight matrix, a fast recursive algorithm is derived according to the pseudoinverse formula of a parti...A flat neural network is designed for the on line state prediction of engine. To reduce the computational cost of weight matrix, a fast recursive algorithm is derived according to the pseudoinverse formula of a partition matrix. Furthermore, the forgetting factor approach is introduced to improve predictive accuracy and robustness of the model. The experiment results indicate that the improved neural network is of good accuracy and strong robustness in prediction, and can apply for the on line prediction of nonlinear multi input multi output systems like vehicle engines.展开更多
Fault detection and diagnosis for pneumatic system of automatic productionline are studied. An expert system using fuzzy-neural network and pneumatic circuit fault diagnosisinstrument are deigned. The mathematical mod...Fault detection and diagnosis for pneumatic system of automatic productionline are studied. An expert system using fuzzy-neural network and pneumatic circuit fault diagnosisinstrument are deigned. The mathematical model of various pneumatic faults and experimental deviceare built. In the end, some experiments are done, which shows that the expert system usingfuzzy-neural network can diagnose fast and truly fault of pneumatic circuit.展开更多
This paper introduces the constitute,structure and the software model of a set of networked manufacturing process monitoring system,using JAVA network technique to realize a set of three layer distributed manufacturin...This paper introduces the constitute,structure and the software model of a set of networked manufacturing process monitoring system,using JAVA network technique to realize a set of three layer distributed manufacturing process monitoring sys- tem which is comprised with remote manage center,manufacturing process supervision center and the units of measure and control layer such as displacement sensor,the device of temperature measure and alarm etc.The network integration of the production management layer,the process control layer and the hard ware control layer is realized via using this approach.The design using object-oriented technique based on JAVA can easily transport to different operation systems with high performance of the expansibili- ty.展开更多
Automatic line reclosing schemes used in an extra-high-voltage power system is an economical and effective means to maintain transient stability. A novel method is proposed in the paper to adaptively optimize the auto...Automatic line reclosing schemes used in an extra-high-voltage power system is an economical and effective means to maintain transient stability. A novel method is proposed in the paper to adaptively optimize the automatic line reclosing time after a transient fault for enhancement of interconnected power system transient stability. Both the study on the transient energy over network and the structure-preserving multi-machines power system model illustrate that the excessive convergence of potential energy on the lines with a certain cutset deteriorate power system stability, and therefore, an optimum line reclosing strategy can be established by minimizing the change in transient potential energy distribution across a cutset lines in the vicinity of the faulty line as an optimization target, and the optimal reclosure time is set to the time of minimum line phase angle difference. Without any pre-determined knowledge, the method is adaptive to various power system operation modes and fault conditions, and easy to implement because only a limited number of data measured at one location on a tie-line linking sub-networks are required. Simulations have been performed with the OMIB(One Machine and Infinite Bus System) and a real inter-connected power system to verify the applicability of the method proposed.展开更多
通信网络是输电线路在线监测系统的重要组成部分,关系到监测数据的完整性和安全性。由于现行通信网络在实际监测中的数据通信效果并不理想,吞吐量较低且丢包率较高,通信网络性能存在一定缺陷。为解决这一问题,文章提出基于5G的输电线路...通信网络是输电线路在线监测系统的重要组成部分,关系到监测数据的完整性和安全性。由于现行通信网络在实际监测中的数据通信效果并不理想,吞吐量较低且丢包率较高,通信网络性能存在一定缺陷。为解决这一问题,文章提出基于5G的输电线路在线监测通信网络设计。利用5G技术来设计输电线路在线监测的通信网络模型和信道,同时基于开放式系统互连(Open System Interconnect,OSI)参考模型来设计通信网络协议,从而完成基于5G的输电线路在线监测通信网络的整体设计。经实验验证,所设计的通信网络吞吐性能良好,丢包率在1%以下,输电线路在线监测通信效果良好。展开更多
The present study aims to conduct 2 types of statistical analysis to reveal the impact of the spread of COVID-19 on train delays by comparing the potential contributing factors before, during and after the outbreak of...The present study aims to conduct 2 types of statistical analysis to reveal the impact of the spread of COVID-19 on train delays by comparing the potential contributing factors before, during and after the outbreak of the virus in the metropolitan train lines in Japan. First of all, the result of the present study clearly revealed the changes in contributing factors for train delays caused by the spread of COVID-19. Specifically, the contributing factors for train delays changed due to the decrease of passengers by the effect of the outbreak of the virus. Additionally, though large terminal stations were considered to be a major contributing factor in causing and increasing train delays in the past, this was not the case after the spread of COVID-19. Therefore, under such conditions, it is more effective to make improvements in small to medium stations and tracks rather than terminal stations. Furthermore, as the decrease in passengers also decreased train delays in commuter lines going to the suburbs due to the spread of COVID-19, the contributing factor for such lines is the excessive number of passengers. Therefore, as for countermeasures for train delays after the effects of COVID-19, it is necessary to disperse passengers in order to avoid passengers concentrating in the same time zones and train lines.展开更多
Background:Electrocution and collisions on power lines are among the leading causes of non-natural mortality for birds.Power lines are exponentially increasing,particularly in developing countries,but mitigation strat...Background:Electrocution and collisions on power lines are among the leading causes of non-natural mortality for birds.Power lines are exponentially increasing,particularly in developing countries,but mitigation strategies to prevent bird mortality are questionable.Mongolia combines a recently increased power line network,an abundant raptor population,a dangerous crossarm configuration and a habitat with no natural perches,producing many bird-power line interactions.Our aim is to assess the bird mortality caused by power lines in the Gobi Desert of Mongolia,to determine the factors increasing the risk of bird electrocution,and to evaluate the effectiveness of used retrofitting measures.Methods:In July 2019 we covered 132.9 km of 15 kV power lines checking 1092 poles.We also conducted bird tran-sects to record raptor and corvid richness and abundance,to assess species vulnerability to electrocution.Results:We recorded 76 electrocuted birds of 7 species.Electrocution rate was 6.96 birds/100 poles.The most affected species were Common Raven(Corvus corax)and Upland Buzzard(Buteo hemilasius),highlighting the electro-cution of 5 endangered Saker Falcons(Falco cherrug).By contrast,we only recorded 8 individuals of 5 species collid-ing with wires,the most affected being Pallas’s Sandgrouse(Syrrhaptes paradoxus).About 76.1%of sampled poles had some mitigation measure.Of these,96.6%were brush perch deflectors and 3.4%rotating-mirrors perch deter-rents.We found differences in electrocution rates among crossarm configurations,with the strain insulator with one jumper being the most lethal.Additionally,we found no correlation between bird abundance and electrocution rates,suggesting that some species are more sensitive to electrocution.Although no differences in total bird electrocu-tion rates were detected between poles with and without perch deterrents,when bird size is considered,deterrents reduced the mortality rate of small birds,while they were ineffective for medium-sized birds.Conclusions:Despite the widespread use of perch deterrents in the Mongolian power line network,there is still an alarming electrocution rate.This strategy is ineffective and some mechanisms,such as brush perch deflectors,may increase the electrocution rate for some medium-sized birds.Finally,we propose strategies to minimize the avian electrocution rate in the Gobi Desert.展开更多
基金Supported by the National Nature Science Foundation of China,the Research Foundation of General Corporation of China Petro-Chemical Industry and the Natural Science and Engineering Research Council of Canada.
文摘A strategy of developing on-line optimization intelligent systems based on combiningflowsheeting simulation and optimization package with artificial neural networks(ANN)is presented inthis paper.A number of optimization cases for a certain chemical plant are obtained off-line byusing PROCESS-Ⅱ or other flowsheeting programming with optimization.Then,taking these cases astraining examples,we establish a neural network systems which can be used on-line as an optimizer toobtain setpoints from input data sampled from distributed control system through gross error detectionand data reconciliation procedures.Such an on-line optimizer possesses two advantages over nonlinearprogramming package:first of all,there is no convergence problem for the trained ANN to be usedonline;secondly,the frequency for setpoints updating is not limited because only algebraic calculationrather than optimization is required to be carried out on-line.Here two key problems ofimplementing ANN approaches to the on-line optimization
文摘Several industrial computers and a server are combined to set up the on-line monitoring and diagnostic system of turbo-generator sets. The main function of the system is to monitor machine sets' running condition. Through analyzing running data, technicians can detect whether there exist faults and where they occur. To share and transmit the dynamic information of the turbo-generator sets, a distributed network system is introduced. NetWare network operating system is used in the LAN (Local Area Network) system. The LAN is extended to realize the sharing of data and remote transmission of information. Furthermore, functions of monitoring and diagnostic clients are listed.
文摘A flat neural network is designed for the on line state prediction of engine. To reduce the computational cost of weight matrix, a fast recursive algorithm is derived according to the pseudoinverse formula of a partition matrix. Furthermore, the forgetting factor approach is introduced to improve predictive accuracy and robustness of the model. The experiment results indicate that the improved neural network is of good accuracy and strong robustness in prediction, and can apply for the on line prediction of nonlinear multi input multi output systems like vehicle engines.
文摘Fault detection and diagnosis for pneumatic system of automatic productionline are studied. An expert system using fuzzy-neural network and pneumatic circuit fault diagnosisinstrument are deigned. The mathematical model of various pneumatic faults and experimental deviceare built. In the end, some experiments are done, which shows that the expert system usingfuzzy-neural network can diagnose fast and truly fault of pneumatic circuit.
基金Funded by National Natural Science Foundation of China under the Grant # 50175066the Natural Science Foundation of Shandong province under the Grant # Y2005F12.
文摘This paper introduces the constitute,structure and the software model of a set of networked manufacturing process monitoring system,using JAVA network technique to realize a set of three layer distributed manufacturing process monitoring sys- tem which is comprised with remote manage center,manufacturing process supervision center and the units of measure and control layer such as displacement sensor,the device of temperature measure and alarm etc.The network integration of the production management layer,the process control layer and the hard ware control layer is realized via using this approach.The design using object-oriented technique based on JAVA can easily transport to different operation systems with high performance of the expansibili- ty.
文摘Automatic line reclosing schemes used in an extra-high-voltage power system is an economical and effective means to maintain transient stability. A novel method is proposed in the paper to adaptively optimize the automatic line reclosing time after a transient fault for enhancement of interconnected power system transient stability. Both the study on the transient energy over network and the structure-preserving multi-machines power system model illustrate that the excessive convergence of potential energy on the lines with a certain cutset deteriorate power system stability, and therefore, an optimum line reclosing strategy can be established by minimizing the change in transient potential energy distribution across a cutset lines in the vicinity of the faulty line as an optimization target, and the optimal reclosure time is set to the time of minimum line phase angle difference. Without any pre-determined knowledge, the method is adaptive to various power system operation modes and fault conditions, and easy to implement because only a limited number of data measured at one location on a tie-line linking sub-networks are required. Simulations have been performed with the OMIB(One Machine and Infinite Bus System) and a real inter-connected power system to verify the applicability of the method proposed.
文摘通信网络是输电线路在线监测系统的重要组成部分,关系到监测数据的完整性和安全性。由于现行通信网络在实际监测中的数据通信效果并不理想,吞吐量较低且丢包率较高,通信网络性能存在一定缺陷。为解决这一问题,文章提出基于5G的输电线路在线监测通信网络设计。利用5G技术来设计输电线路在线监测的通信网络模型和信道,同时基于开放式系统互连(Open System Interconnect,OSI)参考模型来设计通信网络协议,从而完成基于5G的输电线路在线监测通信网络的整体设计。经实验验证,所设计的通信网络吞吐性能良好,丢包率在1%以下,输电线路在线监测通信效果良好。
文摘The present study aims to conduct 2 types of statistical analysis to reveal the impact of the spread of COVID-19 on train delays by comparing the potential contributing factors before, during and after the outbreak of the virus in the metropolitan train lines in Japan. First of all, the result of the present study clearly revealed the changes in contributing factors for train delays caused by the spread of COVID-19. Specifically, the contributing factors for train delays changed due to the decrease of passengers by the effect of the outbreak of the virus. Additionally, though large terminal stations were considered to be a major contributing factor in causing and increasing train delays in the past, this was not the case after the spread of COVID-19. Therefore, under such conditions, it is more effective to make improvements in small to medium stations and tracks rather than terminal stations. Furthermore, as the decrease in passengers also decreased train delays in commuter lines going to the suburbs due to the spread of COVID-19, the contributing factor for such lines is the excessive number of passengers. Therefore, as for countermeasures for train delays after the effects of COVID-19, it is necessary to disperse passengers in order to avoid passengers concentrating in the same time zones and train lines.
基金supported by Generalitat Valenciana(SEJI/2018/024).JMPGESG were supported by Spanish Ministry of Science,Innovation and Universities contracts(IJC-2019-038968 and RYC-2019-027216-I),ZMRLNA by contracts cofunded by the Generalitat Valenciana and the European Social Fund(APOSTD/2019/016 and ACIF/2019/056,respectively).
文摘Background:Electrocution and collisions on power lines are among the leading causes of non-natural mortality for birds.Power lines are exponentially increasing,particularly in developing countries,but mitigation strategies to prevent bird mortality are questionable.Mongolia combines a recently increased power line network,an abundant raptor population,a dangerous crossarm configuration and a habitat with no natural perches,producing many bird-power line interactions.Our aim is to assess the bird mortality caused by power lines in the Gobi Desert of Mongolia,to determine the factors increasing the risk of bird electrocution,and to evaluate the effectiveness of used retrofitting measures.Methods:In July 2019 we covered 132.9 km of 15 kV power lines checking 1092 poles.We also conducted bird tran-sects to record raptor and corvid richness and abundance,to assess species vulnerability to electrocution.Results:We recorded 76 electrocuted birds of 7 species.Electrocution rate was 6.96 birds/100 poles.The most affected species were Common Raven(Corvus corax)and Upland Buzzard(Buteo hemilasius),highlighting the electro-cution of 5 endangered Saker Falcons(Falco cherrug).By contrast,we only recorded 8 individuals of 5 species collid-ing with wires,the most affected being Pallas’s Sandgrouse(Syrrhaptes paradoxus).About 76.1%of sampled poles had some mitigation measure.Of these,96.6%were brush perch deflectors and 3.4%rotating-mirrors perch deter-rents.We found differences in electrocution rates among crossarm configurations,with the strain insulator with one jumper being the most lethal.Additionally,we found no correlation between bird abundance and electrocution rates,suggesting that some species are more sensitive to electrocution.Although no differences in total bird electrocu-tion rates were detected between poles with and without perch deterrents,when bird size is considered,deterrents reduced the mortality rate of small birds,while they were ineffective for medium-sized birds.Conclusions:Despite the widespread use of perch deterrents in the Mongolian power line network,there is still an alarming electrocution rate.This strategy is ineffective and some mechanisms,such as brush perch deflectors,may increase the electrocution rate for some medium-sized birds.Finally,we propose strategies to minimize the avian electrocution rate in the Gobi Desert.