In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave th...In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave threat to the power grid security.The cause of the accident and the accident process were studied for the sake of further understanding of the impact of lightning on power grid.As an example,110 kV double circuit transmission line(Xilong-line) was analyzed.At first,the system topology was given.Through the analysis on relay protection actions and the fault recorder data,over voltage on the insulator strings was calculated.Based on the analysis and the calculation,accident cause and the process were presented respectively.Secondly,it comes to the conclusion that the lightning failure was caused by counterattack.The wave of the lightning over voltage would spread to the not grounded neutral point of the transformers,and make the neutral protective gap breakdown,then cause freewheeling with the frequency of 50 Hz.As results of the relay protection,the double circuit transmission line all tripped out.Finally,the causes of the accident were proposed that included terrain features,large corner towers,strong thunderstorm weather and poor grounded contact of the tower.展开更多
Influenced by strong winds associated with a southeastward-moving Mongolian cyclone,a severe transmission line galloping occurred in Baiyin City,Gansu Province,on 14 April 2020.This caused a tripping incident of the t...Influenced by strong winds associated with a southeastward-moving Mongolian cyclone,a severe transmission line galloping occurred in Baiyin City,Gansu Province,on 14 April 2020.This caused a tripping incident of the transmission line in this region.Based on the hourly,0.5°×0.5°,ECMWF ERA5 reanalysis data,this study investigated the formation mechanisms of the Mongolian cyclone and its associated strong winds.Results from the vorticity budget indicate that the convergence-related vertical stretching and the upward transport of cyclonic vorticity governed formation of the Mongolian cyclone in this event;whereas,tilting and export of cyclonic vorticity from the central region of the cyclone mainly decelerated the cyclone’s formation.The kinetic energy(KE)budget shows that the wind associated with the Mongolian cyclone was mainly enhanced by the positive work of the pressure gradient force.Unlike some typical strong wind events in Northwest China,during this event,no significant downward momentum transportation from the upper troposphere was found.The vertical transport of KE exerted a slightly favorable effect on the KE increase around the location where the transmission line galloping trip appeared.In contrast,the horizontal transport mainly caused an export of KE from this region,which applied an overall negative effect on the wind enhancement associated with the Mongolian cyclone.展开更多
文摘In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave threat to the power grid security.The cause of the accident and the accident process were studied for the sake of further understanding of the impact of lightning on power grid.As an example,110 kV double circuit transmission line(Xilong-line) was analyzed.At first,the system topology was given.Through the analysis on relay protection actions and the fault recorder data,over voltage on the insulator strings was calculated.Based on the analysis and the calculation,accident cause and the process were presented respectively.Secondly,it comes to the conclusion that the lightning failure was caused by counterattack.The wave of the lightning over voltage would spread to the not grounded neutral point of the transformers,and make the neutral protective gap breakdown,then cause freewheeling with the frequency of 50 Hz.As results of the relay protection,the double circuit transmission line all tripped out.Finally,the causes of the accident were proposed that included terrain features,large corner towers,strong thunderstorm weather and poor grounded contact of the tower.
基金supported by the National Key R&D Program of China grant number 2018YFC0809400the science and technol-ogy foundation of State Grid Corporation of China grant number5200-202016243A-0-0-00the Innovation Fund of China Electric Power Research Institute grant number NY83-19-002。
文摘Influenced by strong winds associated with a southeastward-moving Mongolian cyclone,a severe transmission line galloping occurred in Baiyin City,Gansu Province,on 14 April 2020.This caused a tripping incident of the transmission line in this region.Based on the hourly,0.5°×0.5°,ECMWF ERA5 reanalysis data,this study investigated the formation mechanisms of the Mongolian cyclone and its associated strong winds.Results from the vorticity budget indicate that the convergence-related vertical stretching and the upward transport of cyclonic vorticity governed formation of the Mongolian cyclone in this event;whereas,tilting and export of cyclonic vorticity from the central region of the cyclone mainly decelerated the cyclone’s formation.The kinetic energy(KE)budget shows that the wind associated with the Mongolian cyclone was mainly enhanced by the positive work of the pressure gradient force.Unlike some typical strong wind events in Northwest China,during this event,no significant downward momentum transportation from the upper troposphere was found.The vertical transport of KE exerted a slightly favorable effect on the KE increase around the location where the transmission line galloping trip appeared.In contrast,the horizontal transport mainly caused an export of KE from this region,which applied an overall negative effect on the wind enhancement associated with the Mongolian cyclone.