Case Study on Synchronous Construction Technology for Secondary Lining of Large-diameter Single track Shiel Shield-bored ored Tunnel
1
作者 WANG Zhenfei ZHAI Jinying(Translated) 《Chinese Railways》 2023年第2期29-34,共6页
The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the... The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future. 展开更多
关键词 large-diameter shield-bored tunnel synchronous construction of secondary lining super-long invert lining construction jumbo California switch "arch+side wall"lining jumbo
下载PDF
Study of the wall adhesive tensile contact of moist iron ore bulk solids
2
作者 Tao Fang Wei Chen +2 位作者 Jens Plinke Craig Wheeler Alan Roberts 《Particuology》 SCIE EI CAS CSCD 2020年第3期67-75,共9页
The adhesive tensile stress between moist bulk iron ore solids and wall surfaces are critical to control and avoid blockage in large throughput material handling plants.In this study,an experimental system was designe... The adhesive tensile stress between moist bulk iron ore solids and wall surfaces are critical to control and avoid blockage in large throughput material handling plants.In this study,an experimental system was designed to investigate the adhesive tensile contact between a range of iron ore materials and wall lining specimens.The contact mechanism between the material specimen and the wall surface was initially characterised.The experimental results indicated that the adhesive tensile stress is dependent on both the moisture content and the applied major consolidation stress,with the former exhibiting more significant contribution to increasing the magnitude of stress.The surface roughness of the wall showed a negligible effect in determining the adhesive tensile stress.Additionally,the iron ore sample with a higher fines content was observed to be able to achieve a higher adhesive tensile stress compared to the coarse samples.Consequently,the insights resulting from the study demonstrated practical applicability through measures such as blending and/or beneficiation,which reduce the adhesive tensile stress and minimise blockages. 展开更多
关键词 Wet sticky material Adhesive tensile stress wall linings Liquid bridge force Capillary stress Soil texture