A load-leveling method through adsorption was presented to adjust the supply quantity according to the consumption rate of natural gas with time. An experimental simulation set up was designed and used to test the loa...A load-leveling method through adsorption was presented to adjust the supply quantity according to the consumption rate of natural gas with time. An experimental simulation set up was designed and used to test the load-leveling function for a real pipeline system. A storage tank filled with activated carbon together with a filter constitutes the major part of the load-leveling facility. Pressure and temperature of the system, as well as the real gas output of the storage tank were recorded. It is proven that load-leveling by adsorption is technically feasible even for low pipeline pressure of natural gas supply system.展开更多
In this paper, through the nonlinear response of rock strain and stress, we have analized the physical mechanism of loading and unloading response ratio of the well level to the earth tides,the respouse of an aquife...In this paper, through the nonlinear response of rock strain and stress, we have analized the physical mechanism of loading and unloading response ratio of the well level to the earth tides,the respouse of an aquifer of confined well to bulk strain tide and showed two methods of the calculation of loading and unloading response ratio of the well level to the earth tides. We took the example of the Yu 01 well, which is near the epicenter of Heze M S 5.9 earthquake, calculated the response rate and loading and unloading response ratio of two kinds of the earth tides of it. The response rate and response ratio before the earthquake had the variation of increase.展开更多
The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics a...The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics and loading effects,and based on the water pumping( pouring) water test model and semi-infinite elastic space theory model under uniform load,the effects of grouting and loading of nearby building construction on the well water level were analyzed. Results show that grouting at a distance of 200 ~ 700 m to the well,with amount of 2500m3 per day and duration of 270 d,can cause an 8 ~ 11 m rise of well water level; and loading of large-area building construction can cause about a 4m rise of well water level. Through the analysis of these factors,we find that the water level anomalous rising of Tangshan mine well was relevant to grouting and loading of the nearby building construction. This study provides a scientific basis for anomalous rising analysis of water level of Tangshan mine well.展开更多
基金Supported by the Science and Technology Commission of Tianjin and partly supported by the National Natural Science Foundation of China (No. 29936100).
文摘A load-leveling method through adsorption was presented to adjust the supply quantity according to the consumption rate of natural gas with time. An experimental simulation set up was designed and used to test the load-leveling function for a real pipeline system. A storage tank filled with activated carbon together with a filter constitutes the major part of the load-leveling facility. Pressure and temperature of the system, as well as the real gas output of the storage tank were recorded. It is proven that load-leveling by adsorption is technically feasible even for low pipeline pressure of natural gas supply system.
文摘In this paper, through the nonlinear response of rock strain and stress, we have analized the physical mechanism of loading and unloading response ratio of the well level to the earth tides,the respouse of an aquifer of confined well to bulk strain tide and showed two methods of the calculation of loading and unloading response ratio of the well level to the earth tides. We took the example of the Yu 01 well, which is near the epicenter of Heze M S 5.9 earthquake, calculated the response rate and loading and unloading response ratio of two kinds of the earth tides of it. The response rate and response ratio before the earthquake had the variation of increase.
基金funded by the Earthquake Tracking Contract Orientated Task,CEA(2011020303)Science and Technology Project of Hebei Province(13275407D)
文摘The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics and loading effects,and based on the water pumping( pouring) water test model and semi-infinite elastic space theory model under uniform load,the effects of grouting and loading of nearby building construction on the well water level were analyzed. Results show that grouting at a distance of 200 ~ 700 m to the well,with amount of 2500m3 per day and duration of 270 d,can cause an 8 ~ 11 m rise of well water level; and loading of large-area building construction can cause about a 4m rise of well water level. Through the analysis of these factors,we find that the water level anomalous rising of Tangshan mine well was relevant to grouting and loading of the nearby building construction. This study provides a scientific basis for anomalous rising analysis of water level of Tangshan mine well.