期刊文献+
共找到2,505篇文章
< 1 2 126 >
每页显示 20 50 100
Flow and sound fields of scaled high-speed trains with different coach numbers running in long tunnel
1
作者 Qiliang Li Yuqing Sun +1 位作者 Menghan Ouyang Zhigang Yang 《Railway Engineering Science》 EI 2024年第3期401-420,共20页
Segregated incompressible large eddy simulation and acoustic perturbation equations were used to obtain the flow field and sound field of 1:25 scale trains with three,six and eight coaches in a long tunnel,and the aer... Segregated incompressible large eddy simulation and acoustic perturbation equations were used to obtain the flow field and sound field of 1:25 scale trains with three,six and eight coaches in a long tunnel,and the aerodynamic results were verified by wind tunnel test with the same scale two-coach train model.Time-averaged drag coefficients of the head coach of three trains are similar,but at the tail coach of the multi-group trains it is much larger than that of the three-coach train.The eight-coach train presents the largest increment from the head coach to the tail coach in the standard deviation(STD)of aerodynamic force coefficients:0.0110 for drag coefficient(Cd),0.0198 for lift coefficient(Cl)and 0.0371 for side coef-ficient(Cs).Total sound pressure level at the bottom of multi-group trains presents a significant streamwise increase,which is different from the three-coach train.Tunnel walls affect the acoustic distribution at the bottom,only after the coach number reaches a certain value,and the streamwise increase in the sound pressure fluctuation of multi-group trains is strengthened by coach number.Fourier transform of the turbulent and sound pressures presents that coach number has little influence on the peak frequencies,but increases the sound pressure level values at the tail bogie cavities.Furthermore,different from the turbulent pressure,the first two sound pressure proper orthogonal decomposition(POD)modes in the bogie cavities contain 90%of the total energy,and the spatial distributions indicate that the acoustic distributions in the head and tail bogies are not related to coach number. 展开更多
关键词 Flow and sound fields Scaled high-speed trains Different coach numbers long tunnel Proper orthogonal decomposition
下载PDF
Analysis of the Relationship between the Number of Traffic Accidents and the Traffic Flow &Section Location in Extra Long Tunnel 被引量:6
2
作者 Zhaoyou Ma Shouen Fang +1 位作者 Shuo Liu Bowen Cai 《Engineering(科研)》 2020年第2期71-81,共11页
In order to study the influence of the traffic characteristics on traffic accidents in extra long tunnel, the main measurement indicators of traffic flow during the time of traffic accidents are matched with the accid... In order to study the influence of the traffic characteristics on traffic accidents in extra long tunnel, the main measurement indicators of traffic flow during the time of traffic accidents are matched with the accident information to form a data set of the number of traffic accidents and the hourly traffic flow of the accident. Vehicle ratio and the number of accidents are mainly used as the characteristic indicators of traffic flow. At the same time, the longitudinal distribution law of the average speed of traffic flow and the number of traffic accidents in the extra long tunnel is studied. Based on the superposition principle, the extra long tunnel is divided into 5 traffic safety zones. This paper analyzes the distribution of time, morphology, cause of accident, and other characteristics in different traffic safety zones, finding that the shape of traffic accidents in extra long tunnel is mainly rear-end collisions. Improper operation and illegal lane changes are the main causes of accidents. 展开更多
关键词 TRAFFIC Safety EXTRA long tunnel TRAFFIC ACCIDENT ACCIDENT ANALYSIS
下载PDF
A real-time prediction method for tunnel boring machine cutter-head torque using bidirectional long short-term memory networks optimized by multi-algorithm 被引量:6
3
作者 Xing Huang Quantai Zhang +4 位作者 Quansheng Liu Xuewei Liu Bin Liu Junjie Wang Xin Yin 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第3期798-812,共15页
Based on data from the Jilin Water Diversion Tunnels from the Songhua River(China),an improved and real-time prediction method optimized by multi-algorithm for tunnel boring machine(TBM)cutter-head torque is presented... Based on data from the Jilin Water Diversion Tunnels from the Songhua River(China),an improved and real-time prediction method optimized by multi-algorithm for tunnel boring machine(TBM)cutter-head torque is presented.Firstly,a function excluding invalid and abnormal data is established to distinguish TBM operating state,and a feature selection method based on the SelectKBest algorithm is proposed.Accordingly,ten features that are most closely related to the cutter-head torque are selected as input variables,which,in descending order of influence,include the sum of motor torque,cutter-head power,sum of motor power,sum of motor current,advance rate,cutter-head pressure,total thrust force,penetration rate,cutter-head rotational velocity,and field penetration index.Secondly,a real-time cutterhead torque prediction model’s structure is developed,based on the bidirectional long short-term memory(BLSTM)network integrating the dropout algorithm to prevent overfitting.Then,an algorithm to optimize hyperparameters of model based on Bayesian and cross-validation is proposed.Early stopping and checkpoint algorithms are integrated to optimize the training process.Finally,a BLSTMbased real-time cutter-head torque prediction model is developed,which fully utilizes the previous time-series tunneling information.The mean absolute percentage error(MAPE)of the model in the verification section is 7.3%,implying that the presented model is suitable for real-time cutter-head torque prediction.Furthermore,an incremental learning method based on the above base model is introduced to improve the adaptability of the model during the TBM tunneling.Comparison of the prediction performance between the base and incremental learning models in the same tunneling section shows that:(1)the MAPE of the predicted results of the BLSTM-based real-time cutter-head torque prediction model remains below 10%,and both the coefficient of determination(R^(2))and correlation coefficient(r)between measured and predicted values exceed 0.95;and(2)the incremental learning method is suitable for realtime cutter-head torque prediction and can effectively improve the prediction accuracy and generalization capacity of the model during the excavation process. 展开更多
关键词 tunnel boring machine(TBM) Real-time cutter-head torque prediction Bidirectional long short-term memory (BLSTM) Bayesian optimization Multi-algorithm fusion optimization Incremental learning
下载PDF
Benign Adjusting Effects of Long Tunnel on Environment and Slope Hazards:taking Erlang Mountain Tunnel as an example
4
作者 WANG Quancai WANG Lansheng +1 位作者 ZENG Lin CHEN Yong 《Wuhan University Journal of Natural Sciences》 EI CAS 2006年第4期813-819,共7页
The 21st century shall be a century of accelerated development of tunnel construction in China. But until now, what have been frequently stated in reports about influence of tunnels on environment are basically negati... The 21st century shall be a century of accelerated development of tunnel construction in China. But until now, what have been frequently stated in reports about influence of tunnels on environment are basically negative. In fact, this is not true. Tunnels, especially those extend across sensitive areas do exert some positive functions on improving environment and preventing local slope hazards. These positive effects, being new phenomena, are found and put forward by the authors after a series of careful observations have been carried out and in-depth analysis performed the first time. Meanwhile, it is a positive evaluation that the authors made upon tunnels. Many important phenomena and data are cited as evidence and their causative factors are analyzed in this paper as well. 展开更多
关键词 long tunnel ENVIRONMENT benign adjustment
下载PDF
Allowance of Lateral Breakthrough Error for Super Long Tunnels from 20km to 50km
5
作者 ZHANGZhenglu ZHANGSonglin 《Geo-Spatial Information Science》 2004年第3期198-203,共6页
Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse ne... Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse network, we propose a method for calculating the influence value caused by control surveying errors. Through a lot of simulative calculations and combination with piercing practice of super tunnels in Wan Jiazai Project, Shanxi province, we present an allowance table of lateral breakthrough error for super long tunnels from 20 km to 50 km. 展开更多
关键词 super long tunnel lateral breakthrough error ALLOWANCE
下载PDF
Assessment of Durability and Long Term Performance of High Density Polyethylene Drainboards in the Gotthard Railway Tunnels
6
作者 Marcus Jablonka 《Journal of Civil Engineering and Architecture》 2014年第8期1039-1047,共9页
Drainage layers provide permanent relief of hydrostatic water pressure, while the waterproof liner prevents any ingress of water into the tunnel. The durability and aging resistance of drainage membranes are of primar... Drainage layers provide permanent relief of hydrostatic water pressure, while the waterproof liner prevents any ingress of water into the tunnel. The durability and aging resistance of drainage membranes are of primary concern. This paper describes advantages and concerns related to the usage of, and the design with, polymeric drainboards in tunnel construction. Common degradation mechanisms associated with HDPE (high density polyethylene) sheets are described. The stringent requirements for the Gotthard Alpine Railway Tunnel through the Swiss Alps, e.g., high ambient temperatures of up to 45 ℃ and an expected service life of up to 100 years require outstanding aging resistance of polymeric drainage materials. The paper describes the methods deployed to investigate the long-term performance of HDPE drainboards, focusing on aging mechanisms. Details associated with the test procedures developed to reflect the specific properties of drainboards, as well as the results obtained, are presented. A summary table shows recommended product specifications needed to confine the aging properties of drainboards and to design a system performing adequately during the entire lifetime of the structure. 展开更多
关键词 DURABILITY long term performance HDPE drainboards tunnel
下载PDF
Model Analysis of Smoke Control in Long Tunnel: Findings from Hsueh-Shan Tunnel Accident in Taiwan
7
作者 Yi-Hong Chang Chen-Wei Chiu Chi-Min Shu 《Journal of Civil Engineering and Architecture》 2016年第2期232-245,共14页
The common properties of risk in long tunnel fires are high temperature, extreme difficulty of evacuation, rescue urgency and obstacle to rescue operation. Therefore, a complete ventilation design is an indispensable ... The common properties of risk in long tunnel fires are high temperature, extreme difficulty of evacuation, rescue urgency and obstacle to rescue operation. Therefore, a complete ventilation design is an indispensable safety measure. Hsueh-Shan Tunnel is the longest in Taiwan, the fifth longest in the world. On May 7, 2012, a serious tunnel fire caused two deaths and numerous victims suffered from smoke inhalation injury. Apart from this, there was smoking entering the cross-passages and shafts which were important for evacuation. In this research, the current ventilation system in Hsueh-Shan Tunnel was simulated with FDS (fire dynamics simulator) software, and the statistics of smoke, visibility and temperature profile were analyzed. The results of this research showed that, with the current ventilation system, the time was shorter and the distance was longer for the smoke spreading windward than in other models. Furthermore, the visibility of windward victims was more affected and the temperature above the fire source was higher than those in other systems. When the wind speed in tunnel is within 2.0-4.0 m/s, the condition for turning off the ventilation fan within 250 m upwind from the fire source can be prominently reduced to 50 m upwind from the fire source. This not only could avoid plume disturbance but also could be maintained. If victims' evacuation should be given the highest priority, it is recommended to straightly activate the maximum power of the fan. 展开更多
关键词 long tunnel fires ventilation system VISIBILITY plume disturbance victims' evacuation.
下载PDF
LONG AND DEEP DIVERSION TUNNELS OF 1^(ST) STAGE PROJECT IN WEST ROUTE OF SOUTH-NORTH WATER TRANSFER PROJECT
8
作者 Shen Fengsheng,Liu Xin (Reconnaissance,Planning,Design and Research Institute,Yellow River Construction Commission, Ministry of Water Resources, Zhengzhou 450003 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第9期1527-1532,共6页
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze... West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction. 展开更多
关键词 南水北调工程 西线工程 引水隧洞 TBM
下载PDF
高原铁路某特长隧道独头掘进通风技术分析
9
作者 梁星 刘明 +1 位作者 杨琨 曾强 《山西建筑》 2025年第1期150-153,共4页
文章面向高原铁路特长隧道,开展通风技术研究,提出一种基于避车洞通风技术、人行通道通风技术的蓄风房通风策略。基于高原铁路特长隧道通风案例,研究了蓄风房技术。文中研究成果供我国高原铁路特长隧道建设单位、运营单位加以参考、借鉴... 文章面向高原铁路特长隧道,开展通风技术研究,提出一种基于避车洞通风技术、人行通道通风技术的蓄风房通风策略。基于高原铁路特长隧道通风案例,研究了蓄风房技术。文中研究成果供我国高原铁路特长隧道建设单位、运营单位加以参考、借鉴,以保证特长隧道通风性能,满足相关制度、规范对高原铁路特长隧道的环境要求,并实现铁路通风的节能效果。 展开更多
关键词 高原铁路 特长隧道 蓄风房 避车洞
下载PDF
物探技术在特长隧道工程勘察中的应用
10
作者 叶建超 《山西建筑》 2025年第2期179-182,共4页
特长隧道常常穿过复杂地质环境,采用传统钻探法进行勘察时难以获得全面的地质信息,应用物探技术加以补充能够更好地指导后续工程建设。介绍了可控源音频大地电磁法(CSAMT)的基本原理及标量测量法的使用步骤,结合工程实例,论述了该方法... 特长隧道常常穿过复杂地质环境,采用传统钻探法进行勘察时难以获得全面的地质信息,应用物探技术加以补充能够更好地指导后续工程建设。介绍了可控源音频大地电磁法(CSAMT)的基本原理及标量测量法的使用步骤,结合工程实例,论述了该方法的实际应用过程。表明应用该方法可以降低隧道施工中可能遇到的风险,更好地保障工程安全。 展开更多
关键词 物探技术 可控源大地电磁法 特长隧道 地质勘察 测量
下载PDF
Practices on rockburst prevention and control in headrace tunnels of Jinping II hydropower station 被引量:11
11
作者 Jimin Wang Xionghui Zeng Jifang Zhou 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2012年第3期258-268,共11页
Rockburst problems induced by high in-situ stresses were prominent during construction of the headrace tunnels of Jinping II hydropower station. The rockbursts occurred in various forms, and it is necessary to take pe... Rockburst problems induced by high in-situ stresses were prominent during construction of the headrace tunnels of Jinping II hydropower station. The rockbursts occurred in various forms, and it is necessary to take pertinent measures for integrated prevention and control of rockbursts. In view of the rockburst characteristics during tunnel construction of Jinping II hydropower station, the engineering geological conditions were presented, and the features, mechanisms and forms of rockbursts observed during construction were analyzed in detail. A large number of scientific researches, experiments and applications were conducted. Multiple measures were adopted to prevent and control rockbursts, including the prediction and early warning measures, stress relief by blasting in advance, optimized blasting design and optimized tunnel support in the tunnel sections prone to strong rockbursts. The effectiveness of these prevention and control measures was evaluated. Experiences have been accumulated through a great number of helpful explorations and practices for rockburst prevention and control. A comprehensive rockburst prevention and control system has been gradually established. 展开更多
关键词 long and deep tunnel rockburst prevention and control stress relief by blasting microseismic monitoring
下载PDF
Numerical simulation of rockburst disaster and control strategy of constant resistance and large deformation anchor cable in Gaoloushan tunnel 被引量:1
12
作者 MIAO Cheng-yu JIANG Ming +6 位作者 LI Zhi-hu SUN Xiao-ming ZHANG Tong ZHANG Yong YANG Jin-kun REN Chao SONG Peng 《Journal of Mountain Science》 SCIE CSCD 2023年第6期1605-1619,共15页
The Gaoloushan Tunnel in Longnan City,Gansu Province,China,frequently experiences rockburst disasters due to high in-situ stress.Managing rockburst in deep-buried tunnels remains a challenging issue.This paper employs... The Gaoloushan Tunnel in Longnan City,Gansu Province,China,frequently experiences rockburst disasters due to high in-situ stress.Managing rockburst in deep-buried tunnels remains a challenging issue.This paper employs RFPA(Rock Failure Process Analysis)software to establish a calculation model of constant resistance and large deformation(CRLD)anchorages and analyzes the effects of different support methods and pre-stress levels on rockburst.We simulate the process of tunnel rockburst disasters and find that ordinary anchor support incurs rockburst on the right arch waist and arch top,forming a V-shaped explosion pit.CRLD anchor support has several advantages in rockburst control,such as more uniform stress distribution in the surrounding rock,a uniform distribution of plastic zones,less noticeable damage to the tunnel,and effective control of the arch top displacement.The effectiveness of the CRLD anchor support under varying pre-stress conditions shows that a higher prestress results in a smaller plastic zone of the surrounding rock and arch top displacement and a lower number of acoustic emission signals,which better explains the excavation compensation effect.Moreover,adding long anchorages in the deep surrounding rock area can better control rockburst and reduce surrounding rock deformation.Based on these findings,we propose a comprehensive control system that combines long and short anchorages and provides the optimal scheme based on calculations.Therefore,by using high-prestress CRLD anchor support and the combination of long and short anchorages at critical positions,we can enhance the integrity of the surrounding rock,effectively absorb the energy released by the surrounding rock deformation,and reduce the incidence of rockburst disasters. 展开更多
关键词 tunnel ROCKBURST RFPA Constant Resistance and Large Deformation anchor cable long and short cable coupling support.
下载PDF
The Ceneri Base Tunnel" Construction Experience with the Southern Portion of the Flat Railway Line Crossing the Swiss Alps 被引量:11
13
作者 Davide Merlini Daniele Stocker +1 位作者 Matteo Falanesca Roberto Schuerch 《Engineering》 2018年第2期71-84,共14页
This paper summarizes the experience that was gained during the construction of the 15.4 km long Ceneri Base Tunnel (CBT), which is the southern part of the fiat railway line crossing the Swiss Alps from north to so... This paper summarizes the experience that was gained during the construction of the 15.4 km long Ceneri Base Tunnel (CBT), which is the southern part of the fiat railway line crossing the Swiss Alps from north to south. The project consisted of a twin tube with a diameter of 9 m interconnected by cross- passages, each 325 m long. In the middle of the alignment and at its southern end, large caverns were excavated for logistical and operational requirements. The total excavation length amounted to approx- imately 40 km. The tunnel crossed Alpine rock formations comprising a variety of rock typologies and several fault zones. The maximum overburden amounted to 850 m. The excavation of the main tunnels and of the cross-passages was executed by means of drill-and-blast (D&B) excavation. The support con- sisted of bolts, meshes, fiber-reinforced shotcrete and, when required, steel ribs. A gripper tunnel boring machine (TBM) was used in order to excavate the access tunnel. The high overburden caused squeezing rock conditions, which are characterized by large anisotropic convergences when crossing weaker rock formations. The latter required the installation of a deformable support. At the north portal, the tunnel (with an enlarged cross-section) passed underneath the A2 Swiss highway (the major road axis connect- ing the north and south of Switzerland) at a small overburden and through soft ground. Vertical and sub- horizontal jet grouting in combination with partial-face excavation was successfully implemented in order to limit the surface settlements. The south portal was located in a dense urban area. The excavation from the south portal included an approximately 220 m long cut-and-cover tunnel, followed by about 300 m of D&B excavation in a bad rock formation. The very low overburden, poor rock quality, and demanding crossing with an existing road tunnel (at a vertical distance of only 4 m) required special excavation methods through reduced sectors and special blasting techniques in order to limit the blast-induced vibrations. The application of a comprehensive risk management procedure, the execution of an intensive surface survey, and the adaptability of the tunnel design to the encountered geological conditions allowed the successful completion of the excavation works. 展开更多
关键词 Deep and long tunnel Difficult ground conditions Support design Risk management tunnel monitoring Large cavernsLow overburdenOverpass tunnel Numerical analysis Excavation in urban area
下载PDF
Short-and long-term behaviors of drifts in the Callovo-Oxfordian claystone at the Meuse/Haute-Marne Underground Research Laboratory 被引量:5
14
作者 G.Armand A.Noiret +1 位作者 J.Zghondi D.M.Seyedi 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第3期221-230,共10页
Since 2000, the French National Radioactive Waste Management Agency (ANDRA) has been constructing an Underground Research Laboratory (URL) at Bure (east of the Paris Basin) to perform experiments in order to obt... Since 2000, the French National Radioactive Waste Management Agency (ANDRA) has been constructing an Underground Research Laboratory (URL) at Bure (east of the Paris Basin) to perform experiments in order to obtain in situ data necessary to demonstrate the feasibility of geological repository in the Callovo- Oxfordian claystone. An important experimental program is planned to characterize the response of the rock to different drift construction methods, Before 2008, at the main level of the laboratory, most of the drifts were excavated using pneumatic hammer and supported with rock bolts, sliding steel arches and fiber shotcrete. Other techniques, such as road header techniques, stiff and flexible supports, have also been used to characterize their impacts. The drift network is developed following the in situ major stresses. The parallel drifts are separated enough so as they can be considered independently when their hydromechanical (HM) behaviors are compared. Mine-by experiments have been performed to measure the HM response of the rock and the mechanical loading applied to the support system due to the digging and after excavation. Drifts exhibit extensional (mode I) and shear fractures (modes II and III) induced by excavation works. The extent of the induced fracture networks depends on the drift orientation versus the in situ stress field. This paper describes the drift convergence and deformation in the surrounding rock walls as function of time and the impact of different support methods on the rock mass behavior. An observation based method is finally applied to distinguish the instantaneous and time-dependent parts of the rock mass deformation around the drifts. 展开更多
关键词 Field experiments Claystone tunnel convergence Induced fractures Short- and long-term behaviors
下载PDF
Long-term outcomes of endoscopic resection for small(≤4.0cm) gastric gastrointestinal stromal tumors originating from the muscularis propria layer 被引量:20
15
作者 Yu Zhang Xin-Li Mao +4 位作者 Xian-Bin Zhou Hai Yang Lin-Hong Zhu Guang Chen Li-Ping Ye 《World Journal of Gastroenterology》 SCIE CAS 2018年第27期3030-3037,共8页
AIM To evaluate the long-term efficacy of endoscopic resection(ER) for small(≤ 4.0 cm) gastric gastrointestinal stromal tumors(GISTs) originating from the muscularis propria layer.METHODS Between June 2005 and Februa... AIM To evaluate the long-term efficacy of endoscopic resection(ER) for small(≤ 4.0 cm) gastric gastrointestinal stromal tumors(GISTs) originating from the muscularis propria layer.METHODS Between June 2005 and February 2015, we retrospectively analyzed 229 consecutive patients with gastric MP-GISTs who underwent ER with a follow-up at least 36 mo. The main outcome measurements included complete resection rate, complications, and long-term follow-up outcomes.RESULTS ER included endoscopic muscularis excavation in 179 cases, endoscopic full-thickness resection in 32 cases, and submucosal tunneling endoscopic resection in 18 cases. The median size of GISTs was 1.90 cm. Of the 229 GISTs, 147 were very low risk, 72 were low risk, 8 were intermediate risk, and 2 were high risk. Shortterm outcomes showed the complete resection rate was 96.5%, and 8 patients(3.5%) had complications. Of the 8 patients with complications, only one patient required surgical intervention. Long-term outcomes showed 225 patients were actively followed-up until composition of this manuscript. The remaining 4 patients were lost because of unrelated death. During the follow-up period(median, 57 mo), no residual, recurrent lesions, or distant metastasis were detected in any patients. Binary logistic regression analysis showed tumor size was a risk factor associated with a high mitotic index(≥ 5/50 HPF) of GISTs(P = 0.002).CONCLUSION ER seems to be an effective and safe method for gastric MP-GISTs ≤ 4.0 cm, and, for some intermediate or high risk GISTs, adjuvant therapy and/or additional surgery might be required to reduce the risk of recurrence or metastasis. 展开更多
关键词 ENDOSCOPIC RESECTION ENDOSCOPIC fullthickness RESECTION SUBMUCOSAL tunneling ENDOSCOPIC RESECTION GASTRIC gastrointestinal STROMAL tumors long-term outcomes
下载PDF
截至2023年底中国10km以上特长公路隧道统计与分析 被引量:5
16
作者 刘继国 崔庆龙 +1 位作者 李丹妮 罗刚 《隧道建设(中英文)》 CSCD 北大核心 2024年第1期189-198,I0057-I0066,共20页
在隧道行业相关单位的大力支持及既有统计数据的基础上,对截至2023年底中国已建成运营、正在建设、规划设计的共计74座长度10 km以上的特长公路隧道进行统计,其中,已建成运营特长公路隧道25座,正在建设特长公路隧道31座,规划设计特长公... 在隧道行业相关单位的大力支持及既有统计数据的基础上,对截至2023年底中国已建成运营、正在建设、规划设计的共计74座长度10 km以上的特长公路隧道进行统计,其中,已建成运营特长公路隧道25座,正在建设特长公路隧道31座,规划设计特长公路隧道18座。从隧道长度、所在省份、公路等级、地理位置、技术标准、施工工法、设计与施工单位等方面,对中国已建成运营、正在建设、规划设计的长度10 km以上的特长公路隧道建设情况进行分析,其中:长度在10~14.9 km的隧道共62座,长度在15~19.9 km的隧道共10座,长度大于20 km的隧道共2座;隧道主要集中在中国西南部,约占63%,四川省最多,其次是云南省;高速公路隧道达65座,占比约为88%;山岭公路隧道68座,水下隧道6座;隧道技术标准以双向4车道为主;隧道施工工法以钻爆法为主,近些年出现了TBM+钻爆组合工法;隧道设计单位主要有31家;隧道施工单位主要有52家。 展开更多
关键词 特长公路隧道 统计与分析
下载PDF
Numerical simulation of aerodynamic derivatives and critical wind speed for long-span bridges based on simplified steady wind field
17
作者 辛大波 欧进萍 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2007年第2期197-203,共7页
Combining the computational fluid dynamics-based numerical simulation with the forced vibration technique for extraction of aerodynamic derivatives, an approach for calculating the aerodynamic derivatives and the crit... Combining the computational fluid dynamics-based numerical simulation with the forced vibration technique for extraction of aerodynamic derivatives, an approach for calculating the aerodynamic derivatives and the critical flutter wind speed for long-span bridges is presented in this paper. The RNG k-ε turbulent model is introduced to establish the governing equations, including the continuity equation and the Navier-Stokes equations, for solving the wind flow field around a two-dimensional bridge section. To illustrate the effectiveness and accuracy of the proposed approach, a simple application to the Hume Bridge in China is provided, and the numerical results show that the aerodynamic derivatives and the critical flutter wind speed obtained agree well with the wind tunnel test results. 展开更多
关键词 aerodynamic derivatives critical flutter wind speed numerical simulation wind tunnel test long-span bridges
下载PDF
城市轨道交通超长隧道双车追踪模式下火灾烟气控制与人员安全疏散研究 被引量:1
18
作者 李宇辉 费瑞振 李芳 《城市轨道交通研究》 北大核心 2024年第8期100-107,112,共9页
[目的]城市轨道交通发车间隔一般较短,在超长隧道内会出现同方向行驶两列列车的情况,一旦发生火灾容易造成重大财产损失和人员伤亡,因此需对超长隧道双车追踪模式下的火灾烟气蔓延规律和人员安全疏散策略进行研究。[方法]采用FDS(火灾... [目的]城市轨道交通发车间隔一般较短,在超长隧道内会出现同方向行驶两列列车的情况,一旦发生火灾容易造成重大财产损失和人员伤亡,因此需对超长隧道双车追踪模式下的火灾烟气蔓延规律和人员安全疏散策略进行研究。[方法]采用FDS(火灾动力学模拟)软件和Path-finder软件,建立超长隧道火灾模型和人员安全疏散模型,对双车追踪模式下的火灾烟气蔓延规律,以及人员疏散进行仿真分析。[结果及结论]双车追踪模式下,前车尾部着火,通过临界风速纵向通风可保证前车火灾安全;火源下游烟气前锋的蔓延速度为3.20 m/s,至600 s时烟气蔓延至后车,620 s时烟气可完全覆盖后车;烟气温度沿隧道纵向衰减很快,且温度衰减符合双指数模型规律。双车追踪模式下,减小联络通道间距可减少人员疏散总时间,对人员疏散时离开列车的时间影响不大;开启列车端门和疏散平台一侧车门,可显著减少人员疏散时间。在超长隧道双车追踪的最不利火灾场景下,人员疏散存在困难,可通过减小联络通道间距保障人员疏散安全。 展开更多
关键词 城市轨道交通 超长隧道 双车追踪模式 火灾烟气控制 人员安全疏散
下载PDF
高地应力软岩隧道长期稳定性分析 被引量:1
19
作者 邓云纲 《铁道工程学报》 EI CSCD 北大核心 2024年第4期60-67,89,共9页
研究目的:高地应力软岩具有明显的流变特性,流变过程中岩体参数随时间发生变化。本文结合梁王山隧道的设计施工方案,采用Cvisc模型对其施工过程及运营期间的围岩和支护的受力和变形情况进行分析,查明了隧道在施工阶段和长期运营阶段的... 研究目的:高地应力软岩具有明显的流变特性,流变过程中岩体参数随时间发生变化。本文结合梁王山隧道的设计施工方案,采用Cvisc模型对其施工过程及运营期间的围岩和支护的受力和变形情况进行分析,查明了隧道在施工阶段和长期运营阶段的应力、应变和变形特性以及隧道支护结构的内力与变形随时间发展规律。研究结论:(1)在软岩隧道工程施工中,施工时应对隧道初支拱脚处适当加固,控制拱脚变形;(2)不仅要保证施工期的安全,更需要关注隧道在后期运营过程中的长期稳定性;(3)需根据全寿命周期内的围岩流变稳定状态设计支护结构的刚度,从而确保隧道结构长期稳定;(4)本研究成果可为高地应力软岩隧道施工安全和长期稳定性研究提供参考。 展开更多
关键词 软岩隧道 长期稳定性 流变 高地应力 数值模拟
下载PDF
CSAMT深埋长大隧道破碎岩体靶向勘察研究
20
作者 尹小康 罗威 +2 位作者 赵思为 王仕兴 杨开明 《中国铁路》 北大核心 2024年第6期57-67,共11页
铁路深埋长大隧道因其埋深大、里程长,同时伴随复杂多变的地质问题,致使地质勘察难以查明、查细,特别是对深埋长大隧道破碎岩体空间分布的精准定位一直是工程勘察中的难题。基于CSAMT三维正反演理论,研究建立了针对深埋长大隧道中破碎... 铁路深埋长大隧道因其埋深大、里程长,同时伴随复杂多变的地质问题,致使地质勘察难以查明、查细,特别是对深埋长大隧道破碎岩体空间分布的精准定位一直是工程勘察中的难题。基于CSAMT三维正反演理论,研究建立了针对深埋长大隧道中破碎岩体靶向勘察模式,从而实现“点-线-面”的精准勘察。通过开展基于四面体网格的CSAMT三维正演和有限内存拟牛顿法的三维反演研究,以及二、三维模型分析对比,验证三维CSAMT在铁路隧道勘察中的优势。在滇西地区某深埋长大隧道TBM掘进工区开展三维“点-线-面”靶向勘察试验,结果表明该勘察体系可靠且精度高,精准探明了TBM卡机工区段前方的花岗岩蚀变带影响范围及其空间展布形态,确定了断层破碎带的影响范围及其空间展布形态,有效提高深埋长大隧道勘察精度。布置靶向测线从“点-线-面”进行三维CSAMT勘察这一思路,对深埋长大隧道的勘察工作提供一定的应用参考价值。 展开更多
关键词 CSAMT 深埋长大隧道 破碎岩体 靶向勘察体系
下载PDF
上一页 1 2 126 下一页 到第
使用帮助 返回顶部