Visualization and early warning analysis of damage degree of surrounding rock mass in underground powerhouse
1
作者 Yuepeng Sun Haijian Su +5 位作者 Peiwei Xiao Peng Li Biao Li Xiang Zhou Kaiqi Bian Nuwen Xu 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2023年第6期717-731,共15页
Based on the underground powerhouse of Shuangjiangkou hydropower station,Octree theory is adopted to define the indices of the microseismic(MS)spatial aggregation degree and the deviation values of MS count and energy... Based on the underground powerhouse of Shuangjiangkou hydropower station,Octree theory is adopted to define the indices of the microseismic(MS)spatial aggregation degree and the deviation values of MS count and energy.The relationship between the MS multiple parameters and surrounding rock mass instability is established from three aspects:time,space,and strength.Supplemented by the center frequency of the signal evolution characteristics,A fuzzy comprehensive evaluation model and the evolution trend of the MS event center frequency are constructed to quantitatively describe the early warning state of the surrounding rock mass instability.The results show that the multilevel tree structure and voxels generated based on the Octree theory fit relatively well with the set of MS points in threedimensional space.The fuzzy comprehensive evaluation model based on MS spatial aggregation and MS count and energy deviation values enables three-dimensional visualization of the potential damage area and damage extent of the surrounding rock mass.The warning time and potential damage zone quantified are highly consistent with the characteristics of MS precursors,with wide recognition and field investigation results,which fully validate the rationality and applicability of the proposed method.These findings can provide references for the early warning of surrounding rock mass instability in similar underground engineering. 展开更多
关键词 underground powerhouse MS monitoring Early warning VISUALIZATION
下载PDF
Key rock mechanical problems of underground powerhouse in Shuibuya hydropower station 被引量:2
2
作者 Aiqing Wu1,Qigui Yang2,Xiuli Ding1,Huoming Zhou1,Bo Lu1 1 Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan 430010,China 2 Changjiang Institute of Survey,Planning,Design and Research,Wuhan,430010,China 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第1期64-72,共9页
The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanica... The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanical problems encountered during its construction,a comprehensive research was carried out for the underground powerhouse in Shuibuya hydropower station based on a detailed geological survey.It covers the investigations on the initial in-situ stress distribution features,rock mechanical properties,engineering rock mass classifications by different methods,numerical modeling for stability and support analysis,proper measures for rock excavation and support.The results show that the rock excavations of the underground powerhouse under the given geological conditions can be controlled effectively.Some measures,suggested by the designers,are proved to be rational and effective.These measures mainly consist of:(1) the soft rock replacements by concrete in local area below the crane beam,(2) the shotcrete and reinforcement by rock bolts and anchor cables in surrounding rocks,and (3) 2 m concrete placement on the rock bench between adjacent tailrace tubes.The engineering practice shows that the treated surrounding rocks have a good overall stability.The deformation behaviors observed by safety equipments are within the designing limits.The research conclusions on the related rock mechanical problems,prior to the underground powerhouse excavations,are reliable. 展开更多
关键词 Shuibuya hydropower station underground powerhouse stability of surrounding rocks rock excavation and support soft rock replacement
下载PDF
Stability analysis of surrounding rock mass in underground powerhouse considering damage effect of microfractures 被引量:3
3
作者 Peiwei Xiao Haoyu Mao +3 位作者 Bo Qian Biao Li Xingguo Yang Nuwen Xu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第4期1115-1130,共16页
A high-precision microseismic(MS)monitoring system was built to monitor surrounding rock microfractures in the underground powerhouse on the left bank of Shuangjiangkou Hydropower Station.The surrounding rock damage a... A high-precision microseismic(MS)monitoring system was built to monitor surrounding rock microfractures in the underground powerhouse on the left bank of Shuangjiangkou Hydropower Station.The surrounding rock damage area with spatiotemporal clustering of MS activities was studied for qualitative analysis of the damage mechanism of surrounding rock microfractures,based on the source parameters of MS events.The surrounding rock microfracture scale characterized by the source radius of MS events was considered to establish the constitutive relation.MS information was imported into the model for numerical analysis using fast Lagrangian analysis of continuain 3 dimensions(FLAC^(3D)).The results indicated that the numerical simulation results considering MS damage can better reflect the actual situation of the field.The surrounding rock microfractures mainly showed mixed failure characteristics.Shear failures appeared in localized areas while the fracture scale of sections from K0e33 m to K0e15 m on the vault was large.The deformation increment caused by microfracture damage in the shallow surrounding rock of the top arch accounted for 10%e13%,and the stress decrement in the surrounding rock caused by microfracture damage accounted for about 10%. 展开更多
关键词 underground powerhouse Microseismic(MS)monitoring Numerical modeling Microfracture damage Constitutive relation
下载PDF
Engineering rock mechanics practices in the underground powerhouse at JinpingⅠhydropower station 被引量:5
4
作者 Aiqing Wu Jimin Wang +4 位作者 Zhong Zhou Shuling Huang Xiuli Ding Zhihong Dong Yuting Zhang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第5期640-650,共11页
Based on the analyses of data obtained from the underground powerhouse at Jinping I hydropower station, a comprehensive review of engineering rock mechanics practice in the underground powerhouse is first conducted. T... Based on the analyses of data obtained from the underground powerhouse at Jinping I hydropower station, a comprehensive review of engineering rock mechanics practice in the underground powerhouse is first conducted. The distribution of strata, lithology, and initial geo-stress, the excavation process and corresponding rock mass support measures, the deformation and failure characteristics of the surrounding rock mass, the stress characteristics of anchorage structures in the cavern complex, and numerical simulations of surrounding rock mass stability and anchor support performance are presented. The results indicate that the underground powerhouse of Jinping I hydropower station is characterized by high to extremely high geo-stresses during rock excavation. Excessive surrounding rock mass deformation and high stress of anchorage structures, surrounding rock mass unloading damage, and local cracking failure of surrounding rock masses, etc., are mainly caused by rock mass excavation. Deformations of surrounding rock masses and stresses in anchorage structures here are larger than those found elsewhere: 20% of extensometers in the main powerhouse record more than 50 mm with the maximum at around 250 mm observed in the downstream sidewall of the transformer hall. There are about 25% of the anchor bolts having recorded stresses of more than 200 MPa. Jinping I hydropower plant is the first to have an underground powerhouse construction conducted in host rocks under extremely high geo-stress conditions, with the ratio of rock mass strength to geo-stress of less than 2.0. The results can provide a reference to underground powerhouse construction in similar geological conditions. 展开更多
关键词 underground powerhouse High geo-stress Rock mechanics Rock mass stability Engineering practice
下载PDF
Comparative analysis of deformation and failure mechanisms of underground powerhouses on the left and right banks of Baihetan hydropower station 被引量:2
5
作者 Anchi Shi Congjiang Li +3 位作者 Wangbing Hong Gongda Lu Jiawen Zhou Haibo Li 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第3期731-745,共15页
The stability of the surrounding rocks of large underground powerhouses is always emphasized during the construction process,especially in large-scale underground projects under construction,such as the Baihetan hydro... The stability of the surrounding rocks of large underground powerhouses is always emphasized during the construction process,especially in large-scale underground projects under construction,such as the Baihetan hydropower station in China.According to field investigations,numerical simulations and monitoring data analysis,we present a comparative analysis of the deformation and failure characteristics of the surrounding rocks of underground powerhouses on the left and right banks of the Baihetan hydropower station.The failure characteristics and deformation magnitude of the underground powerhouses on the left and right banks are quite different.Under the disadvantageous condition where the maximum principal stress intersects the axis of the powerhouse at a large angle,the left bank underground powerhouse shows prominent stress-controlled failure characteristics such as spalling,slack collapse and concrete cracking.Although the maximum principal stress is in the favorable condition which intersects the right bank powerhouse at a small angle,the relatively high intermediate principal stress with an angle subvertical to the right bank powerhouse plays an essential role in its deformation and failure,indicating that the influence of high intermediate principal stress cannot be ignored.In addition,structural plane-controlled failure and large deformation are also more evident on the right bank due to the extensive distribution of weak structural planes and complex surrounding rock properties. 展开更多
关键词 underground powerhouse Stress-controlled failure Structural plane-controlled failure Large deformation Intermediate principal stress
下载PDF
Dust Diffusion Simulation in the Third Layer Construction of Underground Powerhouse
6
作者 王晓玲 张自强 +1 位作者 李涛 刘雪朋 《Transactions of Tianjin University》 EI CAS 2009年第2期135-139,共5页
Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall funct... Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall function are considered.Ventilation in the third layer of underground powerhouse of Xiangjiaba hydropower station is used as a case.The geometric structure has a decisive effect on the airflow distribution.It is concluded that the dust concentration decreases gradually with the increase of the ventilation time.However,iso-concentration curves have the same tendency after 1 800 s.The dust concentration meets the ventilation and dust-prevention health standard after 2 300 s.The prediction by the present model is confirmed by the experimental measurement by Nakayama. 展开更多
关键词 地下厂房 粉尘扩散 第三层 扩散模拟 施工 强制通风 向家坝水电站 粉尘浓度
下载PDF
某工程浅埋大跨度地下厂房围岩块体稳定性分析
7
作者 张学东 王昊 +1 位作者 胡剑峰 苏红瑞 《水利水电工程设计》 2024年第2期37-40,共4页
通过块体理论对某水电站工程浅埋大跨度地下厂房围岩进行块体稳定性分析,结果表明不稳定块体主要分布于顶拱部位,地下水对块体稳定影响较大;随着地震动参数的增加,块体安全系数会随之降低,但降幅不大;地应力对顶拱块体稳定性影响较大;... 通过块体理论对某水电站工程浅埋大跨度地下厂房围岩进行块体稳定性分析,结果表明不稳定块体主要分布于顶拱部位,地下水对块体稳定影响较大;随着地震动参数的增加,块体安全系数会随之降低,但降幅不大;地应力对顶拱块体稳定性影响较大;喷混凝土与锚杆相结合的支护措施对不稳定块体加固效果较好。 展开更多
关键词 块体稳定性 地下厂房 大跨度 Unwedge软件
下载PDF
大型地下厂房变形综合评估方法研究
8
作者 何江 谢国新 +1 位作者 高要辉 喻军 《浙江工业大学学报》 CAS 北大核心 2024年第4期450-456,共7页
地下厂房围岩稳定性是大型水电站工程建设的关键问题之一,基于数值分析法、经验公式法、工程实例统计法和工程类比分析法评估地下厂房变形允许值及其稳定性。锦屏二级水电站地下厂房变形原位测试与变形综合评估的对比结果表明:地下厂房... 地下厂房围岩稳定性是大型水电站工程建设的关键问题之一,基于数值分析法、经验公式法、工程实例统计法和工程类比分析法评估地下厂房变形允许值及其稳定性。锦屏二级水电站地下厂房变形原位测试与变形综合评估的对比结果表明:地下厂房开挖支护完成后围岩不同部位非协调变形现象显著,上游边墙中部到上游岩锚梁范围围岩变形最大,其次为下游边墙下部位置,顶拱变形普遍较小;地下厂房变形值适中,整体稳定性较好。此外,大型地下厂房围岩变形与围岩类别、地应力水平、洞室宽度及高度等呈正相关。研究成果可为大型水电地下工程稳定性分析和设计优化提供参考。 展开更多
关键词 地下厂房 变形估计 非协调变形 稳定性分析
下载PDF
大型抽水蓄能电站地下厂房结构自振特性分析
9
作者 肖微 刘国庆 +2 位作者 王伟 许亮华 韩承灶 《中国水利水电科学研究院学报(中英文)》 北大核心 2024年第2期138-148,共11页
自振特性分析是抽水蓄能电站地下厂房结构振动研究的基础。以丰宁抽水蓄能电站地下厂房为计算实例,建立了变速机组段地下厂房结构的三维有限元模型。首先采用模态分析方法研究了不同边界条件对地下厂房整体结构及楼板、立柱、楼梯、风... 自振特性分析是抽水蓄能电站地下厂房结构振动研究的基础。以丰宁抽水蓄能电站地下厂房为计算实例,建立了变速机组段地下厂房结构的三维有限元模型。首先采用模态分析方法研究了不同边界条件对地下厂房整体结构及楼板、立柱、楼梯、风罩和机墩等局部结构自振特性的影响,然后分析了丰宁地下厂房可能存在的振源,并对厂房整体及局部结构进行了共振复核。结果表明,上下游边墙弹簧约束条件的增强可以有效提高厂房整体结构自振频率,但对楼板局部自振频率的大小影响不大,对楼梯自振频率也无影响。固定边界使厂房整体结构各阶自振频率显著增大,对楼板、立柱、风罩和机墩等局部结构自振频率影响也较大。在可能的振源作用下,厂房整体结构和各局部结构发生共振的可能性很小。 展开更多
关键词 抽水蓄能电站 地下厂房结构 边界条件 自振频率 共振复核
下载PDF
抽水蓄能电站地下厂房防渗排水方案数值模拟研究
10
作者 杨海滔 张志崇 +1 位作者 金贤 卢斌 《大坝与安全》 2024年第3期20-23,34,共5页
抽水蓄能电站地下厂房埋深较大,受排水廊道、隧洞充水、复杂地质条件、天然地下水等多种因素影响,常形成复杂渗流场。基于FEFLOW软件建立包含输水隧洞、地下厂房、排水廊道、围岩、断层的三维渗流稳态模型,根据模拟结果对初始防渗排水... 抽水蓄能电站地下厂房埋深较大,受排水廊道、隧洞充水、复杂地质条件、天然地下水等多种因素影响,常形成复杂渗流场。基于FEFLOW软件建立包含输水隧洞、地下厂房、排水廊道、围岩、断层的三维渗流稳态模型,根据模拟结果对初始防渗排水方案进行了优化,取消不必要的中平段排水廊道,并抬升下平段排水廊道,使其以自流方式排出渗水。厂房区排水廊道和洞室群渗流量合计8048.16 m^(3)/d,为地下厂房排水泵选型提供较大富余度。 展开更多
关键词 抽水蓄能电站 地下厂房 三维渗流场 防渗排水方案
下载PDF
四川省大渡河金川水电站地下厂房岩壁吊车梁岩台超挖处理措施及锚杆注浆时机研究
11
作者 王海胜 丁新潮 +1 位作者 韩斌 石广斌 《西北水电》 2024年第1期62-66,84,共6页
为了解决金川水电站地下厂房岩壁吊车梁岩台超挖严重问题,综合考虑现场地质状况、开挖现状、施工条件以及后续开挖可能进一步加剧围岩劣化等因素,对岩台超挖部分实施混凝土回填,并与岩壁吊车梁同期施工。通过建立岩壁吊车梁和回填混凝... 为了解决金川水电站地下厂房岩壁吊车梁岩台超挖严重问题,综合考虑现场地质状况、开挖现状、施工条件以及后续开挖可能进一步加剧围岩劣化等因素,对岩台超挖部分实施混凝土回填,并与岩壁吊车梁同期施工。通过建立岩壁吊车梁和回填混凝土及围岩三维有限元数值模型,计算分析了洞室下部开挖过程中的洞壁应力释放和桥机轮压、受拉锚杆注浆时机对岩壁吊车梁受拉锚杆应力以及壁吊车梁应力影响。结果表明:岩壁吊车梁锚固锚杆应力主要受洞壁应力释放影响,轴向拉应力最大值位于岩体中,桥机轮压影响幅度仅为0.32~3.15 MPa;岩壁梁锚固锚杆不宜与系统锚杆同时注浆。岩壁吊车梁运行状态良好,满足稳定要求。 展开更多
关键词 地下厂房 岩壁吊车梁 岩台超挖 受拉锚杆 注浆时机
下载PDF
白鹤滩水电站地下厂房排水系统特点及可靠性分析
12
作者 李浪 陈典龙 +1 位作者 周玉国 詹福伟 《水电与新能源》 2024年第5期9-11,16,共4页
基于白鹤滩水电站地下厂房排水系统结构及其特点进行可靠性分析,采用集水井集中排水的方式,结合排水量大小,充分考虑电站的长期稳定运行工况,选择型号合适的排水泵,既具备较好的排水功能,又尽量减少了岩体的开挖量。并对水淹厂房的意外... 基于白鹤滩水电站地下厂房排水系统结构及其特点进行可靠性分析,采用集水井集中排水的方式,结合排水量大小,充分考虑电站的长期稳定运行工况,选择型号合适的排水泵,既具备较好的排水功能,又尽量减少了岩体的开挖量。并对水淹厂房的意外应急措施进行了可行性分析,为后期运维提供充分准备,可供大型水电站地下厂房排水系统设计借鉴。 展开更多
关键词 白鹤滩水电站 地下厂房 排水 结构特点 可靠性
下载PDF
高地应力下双江口地下厂房围岩破坏特征及影响因素分析
13
作者 王敏 陈文昭 +3 位作者 赵铁拴 李新平 唐青山 王刚 《南华大学学报(自然科学版)》 2024年第1期31-37,45,共8页
双江口水电站作为大渡河流域水电梯级开发的上游控制性重点水库工程,受深山峡谷地域条件影响,地下厂房存在埋深大且地应力高的工程特点。以主厂房为研究对象,统计归纳了爆破开挖中现场围岩变形及破坏特征,并阐释了高地应力条件下岩体破... 双江口水电站作为大渡河流域水电梯级开发的上游控制性重点水库工程,受深山峡谷地域条件影响,地下厂房存在埋深大且地应力高的工程特点。以主厂房为研究对象,统计归纳了爆破开挖中现场围岩变形及破坏特征,并阐释了高地应力条件下岩体破坏机制及影响因素。研究结果表明,双江口水电站地下厂房爆破开挖过程中围岩主要发生板裂、板片状破裂、V型破裂以及应力与结构协同作用破坏四种主要类型。其中,板状破裂主要发育在边墙、顶拱及掌子面;板片状破裂和V型破裂主要发育在拱肩部位,破裂深度一般大于40 cm;应力与结构协同破坏围绕断层或节理聚集区,破坏规模不等且可预见性较差。 展开更多
关键词 地下厂房 高地应力 爆破开挖 围岩变形
下载PDF
基于粒子群优化支持向量机的地下洞室支护设计
14
作者 侯德俊 梁熙文 +1 位作者 张昊辰 韩君格 《西北水电》 2024年第3期101-107,共7页
水电站地下洞室支护设计因其环境复杂性而面临重大挑战,现有方案受限于主观经验和低精度等问题,难以满足设计需求。为提高地下洞室设计效率和可靠性,通过引入粒子群优化(PSO)优化支持向量机(SVM)参数,开发地下洞室支护智能设计模型。模... 水电站地下洞室支护设计因其环境复杂性而面临重大挑战,现有方案受限于主观经验和低精度等问题,难以满足设计需求。为提高地下洞室设计效率和可靠性,通过引入粒子群优化(PSO)优化支持向量机(SVM)参数,开发地下洞室支护智能设计模型。模型将洞室跨度、洞室高度、洞室高跨比、洞室埋深、围岩类别、岩石饱和单轴抗压强度、最大主应力值、岩石强度应力比作为输入指标。通过对100个国内外水电站地下洞室支护案例的训练测试。结果表明:该模型在各项输出指标上显示了高度准确性,其中喷混厚度、锚杆直径、锚杆间排距的定类准确率分别达到90%、85%、90%,锚杆长度的定量预测拟合优度为0.843。研究成果可为地下洞室支护设计提供一种新方法。 展开更多
关键词 地下洞室 支护设计 粒子群优化 支持向量机
下载PDF
改性环氧灌浆料在水电站地下厂房渗水修补中的应用研究
15
作者 王胜山 陈忠 +1 位作者 薛未 赵强 《粘接》 CAS 2024年第5期57-60,共4页
水电站地下厂房是其关键性的建筑物,若是在施工或者设计环节出现问题导致渗漏,就会对水电站厂房的使用年限、功能产生影响。地下厂房渗漏水主要为厂房周围墙、底板地基出现渗漏,前者还包括孔洞、砼蜂窝渗漏。环氧树脂灌浆材料则是对从... 水电站地下厂房是其关键性的建筑物,若是在施工或者设计环节出现问题导致渗漏,就会对水电站厂房的使用年限、功能产生影响。地下厂房渗漏水主要为厂房周围墙、底板地基出现渗漏,前者还包括孔洞、砼蜂窝渗漏。环氧树脂灌浆材料则是对从基础防渗强化、砼裂缝应用颇为广泛的灌浆材料,相较于溶剂型环氧灌浆材料而言,水性环氧灌浆材料优点更为突出,呈现出可以用水进行清洗,运用具有安全性,气体较少,挥发性颇低等。按照环保要求,该水化材料的应用前景更为广阔。 展开更多
关键词 水电站 地下厂房 渗水处理 环氧树脂粘胶 灌封堵工艺
下载PDF
长垂直母线热压耦合厂房通风研究
16
作者 谢方祥 梁波 陈鹏云 《制冷与空调(四川)》 2024年第1期77-81,96,共6页
大型地下电站发电机引出大多采用长垂直离相封闭母线(IPB),但在长垂直条件下因高度差产生的“烟囱效应”会导致母线上下温差过大,甚至超过母线最大运行工况下的温升限值,带来一定的安全隐患,并限制了地下电站封闭母线引出方式的运用。... 大型地下电站发电机引出大多采用长垂直离相封闭母线(IPB),但在长垂直条件下因高度差产生的“烟囱效应”会导致母线上下温差过大,甚至超过母线最大运行工况下的温升限值,带来一定的安全隐患,并限制了地下电站封闭母线引出方式的运用。结合三峡地下电站等长垂直、大电流封闭母线竖井的特点,对长垂直封闭母线在不同影响因素下的热平衡特性进行了理论分析与数值计算。通过工程实践,探索出长垂直母线热平衡和地下厂房母线竖井通风的耦合模型及规律,并在此基础上提出了基于“热压耦合”的长垂直离相封闭母线的应用与通风设计的新思路。 展开更多
关键词 长垂直离相封闭母线 地下厂房 热压耦合通风 热平衡 烟囱效应
下载PDF
深埋地下洞室动态安全监测设计——以白鹤滩右岸地下厂房为例
17
作者 戴天将 赵程 +1 位作者 郑晓红 段杭 《水电与新能源》 2024年第5期32-36,49,共6页
针对白鹤滩水电站右岸地下厂房的地质情况、结构布置以及变形和应力分布特点,从监测断面布置、监测手段选择、重点监测部位等方面着眼,建立起一套包括地下厂房围岩变形、支护结构应力、错动变形、岩壁吊车梁应力与变形等监测项目在内的... 针对白鹤滩水电站右岸地下厂房的地质情况、结构布置以及变形和应力分布特点,从监测断面布置、监测手段选择、重点监测部位等方面着眼,建立起一套包括地下厂房围岩变形、支护结构应力、错动变形、岩壁吊车梁应力与变形等监测项目在内的深埋地下洞室监测系统,对重点监测部位和不良地质洞段,提出专门监测方案并实施自动化监测,同时根据开挖揭示和反馈分析,及时进行动态设计,达到预警预报以及指导施工等。实施结果表明该监测系统对指导工程安全施工及运行起到了重要作用。 展开更多
关键词 白鹤滩水电站 地下厂房 安全监测 动态设计
下载PDF
抽水蓄能电站地下厂房岩壁吊车梁开挖爆破试验研究
18
作者 徐洁浩 王世洋 《价值工程》 2024年第3期50-52,共3页
针对抽水蓄能电站地下厂房岩壁吊车梁开挖技术,文章以河南某抽水蓄能电站为背景,结合厂房地质条件及岩壁吊车梁结构特点,通过开展现场爆破试验确定爆破参数,确保该部位的开挖质量满足设计及规范要求。结果对比表明:选择装药密度65g/m作... 针对抽水蓄能电站地下厂房岩壁吊车梁开挖技术,文章以河南某抽水蓄能电站为背景,结合厂房地质条件及岩壁吊车梁结构特点,通过开展现场爆破试验确定爆破参数,确保该部位的开挖质量满足设计及规范要求。结果对比表明:选择装药密度65g/m作为岩壁吊车梁开挖爆破参数,半孔率94.3%,局部最大超挖4cm,岩台完整且平整度控制良好。试验结果可为抽水蓄能电站岩壁吊车梁开挖施工提供工程实例和技术参考。 展开更多
关键词 地下厂房 岩壁吊车梁 爆破试验 爆破参数
下载PDF
精细化管理在绩溪蓄能电站岩壁梁施工中的应用
19
作者 闫锋 《云南水力发电》 2024年第3期167-170,178,共5页
岩壁梁是地下厂房开挖施工中难度和质量要求最高的部分。融入精细化施工理念于绩溪水电站地下厂房岩壁梁施工中,通过合理分层、规划开挖顺序及对各道关键工序的精密把控和调整,总结岩壁梁开挖操作要点,实现对岩台开挖过程的质量控制,完... 岩壁梁是地下厂房开挖施工中难度和质量要求最高的部分。融入精细化施工理念于绩溪水电站地下厂房岩壁梁施工中,通过合理分层、规划开挖顺序及对各道关键工序的精密把控和调整,总结岩壁梁开挖操作要点,实现对岩台开挖过程的质量控制,完善岩壁梁开挖阶段的安全监测与保护措施,确保精细化管理在绩溪水电站地下厂房岩壁梁开挖过程中取得了良好的应用效果,保障了工程的开挖质量。 展开更多
关键词 岩壁梁 地下厂房 绩溪水电站 精细化施工
下载PDF
旭龙水电站地下厂房主要工程地质问题分析
20
作者 杨志川 尹军 +2 位作者 庞云铭 张焕强 陈金龙 《水利水电快报》 2024年第5期26-30,共5页
通过分析潜在工程地质问题,为旭龙水电站地下厂房围岩支护设计提供地质依据,应用现场调查、室内外试验和三维数值模拟相结合的方法,对地下厂房围岩稳定问题及相应机理进行了深入分析。结果表明:围岩以花岗岩等硬岩为主,岩石类别主要为Ⅱ... 通过分析潜在工程地质问题,为旭龙水电站地下厂房围岩支护设计提供地质依据,应用现场调查、室内外试验和三维数值模拟相结合的方法,对地下厂房围岩稳定问题及相应机理进行了深入分析。结果表明:围岩以花岗岩等硬岩为主,岩石类别主要为Ⅱ类,少量Ⅲ类。潜在工程地质问题主要包括不稳定块体、缓倾角结构面、小夹角长大结构面、局部高地应力、洞室涌水等,可能引起局部围岩片帮、掉块、崩落或塌方等变形破坏;大方量不稳定块体可能导致部分洞段整体失稳;洞室涌水会降低局部围岩稳定性,不利于施工。研究成果明确了旭龙水电站地下厂房主要工程地质问题,为围岩开挖和支护设计提供了理论支持。 展开更多
关键词 地下厂房 工程地质问题 围岩变形破坏 局部高地应力 旭龙水电站
下载PDF