Based on the underground powerhouse of Shuangjiangkou hydropower station,Octree theory is adopted to define the indices of the microseismic(MS)spatial aggregation degree and the deviation values of MS count and energy...Based on the underground powerhouse of Shuangjiangkou hydropower station,Octree theory is adopted to define the indices of the microseismic(MS)spatial aggregation degree and the deviation values of MS count and energy.The relationship between the MS multiple parameters and surrounding rock mass instability is established from three aspects:time,space,and strength.Supplemented by the center frequency of the signal evolution characteristics,A fuzzy comprehensive evaluation model and the evolution trend of the MS event center frequency are constructed to quantitatively describe the early warning state of the surrounding rock mass instability.The results show that the multilevel tree structure and voxels generated based on the Octree theory fit relatively well with the set of MS points in threedimensional space.The fuzzy comprehensive evaluation model based on MS spatial aggregation and MS count and energy deviation values enables three-dimensional visualization of the potential damage area and damage extent of the surrounding rock mass.The warning time and potential damage zone quantified are highly consistent with the characteristics of MS precursors,with wide recognition and field investigation results,which fully validate the rationality and applicability of the proposed method.These findings can provide references for the early warning of surrounding rock mass instability in similar underground engineering.展开更多
The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanica...The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanical problems encountered during its construction,a comprehensive research was carried out for the underground powerhouse in Shuibuya hydropower station based on a detailed geological survey.It covers the investigations on the initial in-situ stress distribution features,rock mechanical properties,engineering rock mass classifications by different methods,numerical modeling for stability and support analysis,proper measures for rock excavation and support.The results show that the rock excavations of the underground powerhouse under the given geological conditions can be controlled effectively.Some measures,suggested by the designers,are proved to be rational and effective.These measures mainly consist of:(1) the soft rock replacements by concrete in local area below the crane beam,(2) the shotcrete and reinforcement by rock bolts and anchor cables in surrounding rocks,and (3) 2 m concrete placement on the rock bench between adjacent tailrace tubes.The engineering practice shows that the treated surrounding rocks have a good overall stability.The deformation behaviors observed by safety equipments are within the designing limits.The research conclusions on the related rock mechanical problems,prior to the underground powerhouse excavations,are reliable.展开更多
A high-precision microseismic(MS)monitoring system was built to monitor surrounding rock microfractures in the underground powerhouse on the left bank of Shuangjiangkou Hydropower Station.The surrounding rock damage a...A high-precision microseismic(MS)monitoring system was built to monitor surrounding rock microfractures in the underground powerhouse on the left bank of Shuangjiangkou Hydropower Station.The surrounding rock damage area with spatiotemporal clustering of MS activities was studied for qualitative analysis of the damage mechanism of surrounding rock microfractures,based on the source parameters of MS events.The surrounding rock microfracture scale characterized by the source radius of MS events was considered to establish the constitutive relation.MS information was imported into the model for numerical analysis using fast Lagrangian analysis of continuain 3 dimensions(FLAC^(3D)).The results indicated that the numerical simulation results considering MS damage can better reflect the actual situation of the field.The surrounding rock microfractures mainly showed mixed failure characteristics.Shear failures appeared in localized areas while the fracture scale of sections from K0e33 m to K0e15 m on the vault was large.The deformation increment caused by microfracture damage in the shallow surrounding rock of the top arch accounted for 10%e13%,and the stress decrement in the surrounding rock caused by microfracture damage accounted for about 10%.展开更多
Based on the analyses of data obtained from the underground powerhouse at Jinping I hydropower station, a comprehensive review of engineering rock mechanics practice in the underground powerhouse is first conducted. T...Based on the analyses of data obtained from the underground powerhouse at Jinping I hydropower station, a comprehensive review of engineering rock mechanics practice in the underground powerhouse is first conducted. The distribution of strata, lithology, and initial geo-stress, the excavation process and corresponding rock mass support measures, the deformation and failure characteristics of the surrounding rock mass, the stress characteristics of anchorage structures in the cavern complex, and numerical simulations of surrounding rock mass stability and anchor support performance are presented. The results indicate that the underground powerhouse of Jinping I hydropower station is characterized by high to extremely high geo-stresses during rock excavation. Excessive surrounding rock mass deformation and high stress of anchorage structures, surrounding rock mass unloading damage, and local cracking failure of surrounding rock masses, etc., are mainly caused by rock mass excavation. Deformations of surrounding rock masses and stresses in anchorage structures here are larger than those found elsewhere: 20% of extensometers in the main powerhouse record more than 50 mm with the maximum at around 250 mm observed in the downstream sidewall of the transformer hall. There are about 25% of the anchor bolts having recorded stresses of more than 200 MPa. Jinping I hydropower plant is the first to have an underground powerhouse construction conducted in host rocks under extremely high geo-stress conditions, with the ratio of rock mass strength to geo-stress of less than 2.0. The results can provide a reference to underground powerhouse construction in similar geological conditions.展开更多
The stability of the surrounding rocks of large underground powerhouses is always emphasized during the construction process,especially in large-scale underground projects under construction,such as the Baihetan hydro...The stability of the surrounding rocks of large underground powerhouses is always emphasized during the construction process,especially in large-scale underground projects under construction,such as the Baihetan hydropower station in China.According to field investigations,numerical simulations and monitoring data analysis,we present a comparative analysis of the deformation and failure characteristics of the surrounding rocks of underground powerhouses on the left and right banks of the Baihetan hydropower station.The failure characteristics and deformation magnitude of the underground powerhouses on the left and right banks are quite different.Under the disadvantageous condition where the maximum principal stress intersects the axis of the powerhouse at a large angle,the left bank underground powerhouse shows prominent stress-controlled failure characteristics such as spalling,slack collapse and concrete cracking.Although the maximum principal stress is in the favorable condition which intersects the right bank powerhouse at a small angle,the relatively high intermediate principal stress with an angle subvertical to the right bank powerhouse plays an essential role in its deformation and failure,indicating that the influence of high intermediate principal stress cannot be ignored.In addition,structural plane-controlled failure and large deformation are also more evident on the right bank due to the extensive distribution of weak structural planes and complex surrounding rock properties.展开更多
Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall funct...Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall function are considered.Ventilation in the third layer of underground powerhouse of Xiangjiaba hydropower station is used as a case.The geometric structure has a decisive effect on the airflow distribution.It is concluded that the dust concentration decreases gradually with the increase of the ventilation time.However,iso-concentration curves have the same tendency after 1 800 s.The dust concentration meets the ventilation and dust-prevention health standard after 2 300 s.The prediction by the present model is confirmed by the experimental measurement by Nakayama.展开更多
基金the Science Foundation for Distinguished Young Scholars of Sichuan Province(No.2020JDJQ0011)the National Natural Science Foundation of China(Nos.42177143,51809221,and 52274145)the State Key Laboratory for GeoMechanics and Deep Underground Engineering,China University of Mining&Technology(No.SKLGDUEK2013)。
文摘Based on the underground powerhouse of Shuangjiangkou hydropower station,Octree theory is adopted to define the indices of the microseismic(MS)spatial aggregation degree and the deviation values of MS count and energy.The relationship between the MS multiple parameters and surrounding rock mass instability is established from three aspects:time,space,and strength.Supplemented by the center frequency of the signal evolution characteristics,A fuzzy comprehensive evaluation model and the evolution trend of the MS event center frequency are constructed to quantitatively describe the early warning state of the surrounding rock mass instability.The results show that the multilevel tree structure and voxels generated based on the Octree theory fit relatively well with the set of MS points in threedimensional space.The fuzzy comprehensive evaluation model based on MS spatial aggregation and MS count and energy deviation values enables three-dimensional visualization of the potential damage area and damage extent of the surrounding rock mass.The warning time and potential damage zone quantified are highly consistent with the characteristics of MS precursors,with wide recognition and field investigation results,which fully validate the rationality and applicability of the proposed method.These findings can provide references for the early warning of surrounding rock mass instability in similar underground engineering.
基金Supported by the National Key Technology R&D Program of China (2008BAB29B01)
文摘The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanical problems encountered during its construction,a comprehensive research was carried out for the underground powerhouse in Shuibuya hydropower station based on a detailed geological survey.It covers the investigations on the initial in-situ stress distribution features,rock mechanical properties,engineering rock mass classifications by different methods,numerical modeling for stability and support analysis,proper measures for rock excavation and support.The results show that the rock excavations of the underground powerhouse under the given geological conditions can be controlled effectively.Some measures,suggested by the designers,are proved to be rational and effective.These measures mainly consist of:(1) the soft rock replacements by concrete in local area below the crane beam,(2) the shotcrete and reinforcement by rock bolts and anchor cables in surrounding rocks,and (3) 2 m concrete placement on the rock bench between adjacent tailrace tubes.The engineering practice shows that the treated surrounding rocks have a good overall stability.The deformation behaviors observed by safety equipments are within the designing limits.The research conclusions on the related rock mechanical problems,prior to the underground powerhouse excavations,are reliable.
基金support from the National Key R&D Program of China(Grant No.2017YFC1501100)the Science Foundation for Distinguished Young Scholars of Sichuan Province(Grant No.2020JDJQ0011)the National Natural Science Foundation of China(Grant No.42177143).
文摘A high-precision microseismic(MS)monitoring system was built to monitor surrounding rock microfractures in the underground powerhouse on the left bank of Shuangjiangkou Hydropower Station.The surrounding rock damage area with spatiotemporal clustering of MS activities was studied for qualitative analysis of the damage mechanism of surrounding rock microfractures,based on the source parameters of MS events.The surrounding rock microfracture scale characterized by the source radius of MS events was considered to establish the constitutive relation.MS information was imported into the model for numerical analysis using fast Lagrangian analysis of continuain 3 dimensions(FLAC^(3D)).The results indicated that the numerical simulation results considering MS damage can better reflect the actual situation of the field.The surrounding rock microfractures mainly showed mixed failure characteristics.Shear failures appeared in localized areas while the fracture scale of sections from K0e33 m to K0e15 m on the vault was large.The deformation increment caused by microfracture damage in the shallow surrounding rock of the top arch accounted for 10%e13%,and the stress decrement in the surrounding rock caused by microfracture damage accounted for about 10%.
基金the valuable support from Yalong River Hydropower Development Company,Ltd.HydroChina Chengdu Engineering Corporation,Ltdthe National Natural Science Foundation of China(Grant Nos.51179014,51579016,51379022,and 51539002)
文摘Based on the analyses of data obtained from the underground powerhouse at Jinping I hydropower station, a comprehensive review of engineering rock mechanics practice in the underground powerhouse is first conducted. The distribution of strata, lithology, and initial geo-stress, the excavation process and corresponding rock mass support measures, the deformation and failure characteristics of the surrounding rock mass, the stress characteristics of anchorage structures in the cavern complex, and numerical simulations of surrounding rock mass stability and anchor support performance are presented. The results indicate that the underground powerhouse of Jinping I hydropower station is characterized by high to extremely high geo-stresses during rock excavation. Excessive surrounding rock mass deformation and high stress of anchorage structures, surrounding rock mass unloading damage, and local cracking failure of surrounding rock masses, etc., are mainly caused by rock mass excavation. Deformations of surrounding rock masses and stresses in anchorage structures here are larger than those found elsewhere: 20% of extensometers in the main powerhouse record more than 50 mm with the maximum at around 250 mm observed in the downstream sidewall of the transformer hall. There are about 25% of the anchor bolts having recorded stresses of more than 200 MPa. Jinping I hydropower plant is the first to have an underground powerhouse construction conducted in host rocks under extremely high geo-stress conditions, with the ratio of rock mass strength to geo-stress of less than 2.0. The results can provide a reference to underground powerhouse construction in similar geological conditions.
基金the support of the National Natural Science Foundation of China (Grant No. 11902210)the Graduate Student’s Research Innovation Foundation of Sichuan University (Grant No. 2018YJSY076)
文摘The stability of the surrounding rocks of large underground powerhouses is always emphasized during the construction process,especially in large-scale underground projects under construction,such as the Baihetan hydropower station in China.According to field investigations,numerical simulations and monitoring data analysis,we present a comparative analysis of the deformation and failure characteristics of the surrounding rocks of underground powerhouses on the left and right banks of the Baihetan hydropower station.The failure characteristics and deformation magnitude of the underground powerhouses on the left and right banks are quite different.Under the disadvantageous condition where the maximum principal stress intersects the axis of the powerhouse at a large angle,the left bank underground powerhouse shows prominent stress-controlled failure characteristics such as spalling,slack collapse and concrete cracking.Although the maximum principal stress is in the favorable condition which intersects the right bank powerhouse at a small angle,the relatively high intermediate principal stress with an angle subvertical to the right bank powerhouse plays an essential role in its deformation and failure,indicating that the influence of high intermediate principal stress cannot be ignored.In addition,structural plane-controlled failure and large deformation are also more evident on the right bank due to the extensive distribution of weak structural planes and complex surrounding rock properties.
基金Supported by Natural Science Fund ation for Major Research Plan of China (No.90815019)National Natural Science Foundation of China (No.50879053)National Key Project of Scientific and Technical Supporting Programs Funded by Ministry of Science and Technology of China (No.2006BAB04A13)
文摘Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall function are considered.Ventilation in the third layer of underground powerhouse of Xiangjiaba hydropower station is used as a case.The geometric structure has a decisive effect on the airflow distribution.It is concluded that the dust concentration decreases gradually with the increase of the ventilation time.However,iso-concentration curves have the same tendency after 1 800 s.The dust concentration meets the ventilation and dust-prevention health standard after 2 300 s.The prediction by the present model is confirmed by the experimental measurement by Nakayama.