期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Longitudinal force in continuously welded rail on long-span tied arch continuous bridge carrying multiple tracks 被引量:19
1
作者 闫斌 戴公连 +1 位作者 郭文华 徐庆元 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期2001-2006,共6页
Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete ... Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete composite section beam element to simulate concrete-filled steel tube(CFST) arch rib, using the beam element with rigid arm to simulate the prestressed concrete girder and using nonlinear bar element to simulate longitudinal constraint between track and bridge. Taking a(77+3×156.8+77) m tied arch continuous bridge with four tracks on the Harbin-Qiqihar Passenger Dedicated Line as an example, the arrangement of continuously welded rail(CWR) was explored. The longitudinal force in CWR on the tied arch continuous bridge, the pier top horizontal force and torque due to the unbalance load case, were analyzed under the action of temperature, vertical live load, train braking and wind load.Studies show that, it can significantly reduce track displacement to set the track expansion devices at main span arch springing on both sides; the track stress due to arch temperature variation can reach 40.8 MPa; the track stress, pier top horizontal force and torque are related to the number of loaded tracks and train running direction, and the bending force applied to unloaded track is close to the loaded track, while the braking force applied to unloaded track is 1/4 to 1/2 of the loaded track; the longitudinal force of track due to the wind load is up to 12.4 MPa, which should be considered. 展开更多
关键词 railroad bridge long-span bridge tied arch continuous beam continuously welded rail track-bridge interaction
下载PDF
Applicability of small resistance fastener on long-span continuous bridges of high-speed railway 被引量:19
2
作者 戴公连 刘文硕 《Journal of Central South University》 SCIE EI CAS 2013年第5期1426-1433,共8页
Ballastless tracks have been widely applied in high-speed railway (HSR). The adaptability research between continuous welded rails (CWR) and long-span bridges of HSR is of great practical engineering significance. Bas... Ballastless tracks have been widely applied in high-speed railway (HSR). The adaptability research between continuous welded rails (CWR) and long-span bridges of HSR is of great practical engineering significance. Based on the HSR long-span continuous bridges, the integrative spatial finite element model of track-bridge-pier-foundation system was established with the nonlinear spring element simulating the longitudinal resistance between track and bridge. Comparative study on the various additional longitudinal forces of CWR using the common fasteners and small resistance fasteners was carried out. Analysis results indicate that the additional expansion forces and additional rail-breaking forces in long-span ballastless continuous girders can be reduced evidently by 40% 50% after adopting small resistance fasteners, but lead to greater rail broken gap. The small resistance fasteners have little influence on the additional force only caused by vertical load, but can reduce the additional force caused by vertical load combined with braking load by over 10%. Besides, transient analysis method is proved to be more accurate and safe in calculating additional longitudinal forces when the train running or braking on the bridge, compared with the traditional static method. 展开更多
关键词 ballastless track small resistance fasteners additional longitudinal force long-span continuous beam high-speed railway
下载PDF
Linear monitoring for cast-in-place reinforced concrete arch bridge construction 被引量:1
3
作者 ZHENG Yifeng CAO Yu WANG Yuanyuan 《Global Geology》 2012年第2期145-150,共6页
Linear monitoring is an important link of bridge construction control,which is conducted in key processes of construction to ensure the security of bridge in construction procedure. Combining with main arch constructi... Linear monitoring is an important link of bridge construction control,which is conducted in key processes of construction to ensure the security of bridge in construction procedure. Combining with main arch construction monitoring program of No. 2 bridge in north district of Changbai international tourism resort,main content and key technologies are recommended. Considering the various influential factors during the construction process,linear adjustment is handled to ensure that the stress and linear of main arch meet design requirements. 展开更多
关键词 arch box linear monitoring pre-loading pressure bailey beam
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部