By developing a GDMOD model to estimate the environmental externalities associated with electricity generation, this project provides a detailed analysis of the damages and costs caused by different pollutants at vary...By developing a GDMOD model to estimate the environmental externalities associated with electricity generation, this project provides a detailed analysis of the damages and costs caused by different pollutants at varying distances from the Mawan Electricity Plant in Shenzhen, China. The major findings of this study can be summarized that (1) environmental damages caused by electricity production are large and are mainly imposed on regions far away from the electricity plant; (2) air pollution is the most significant contributor to the total damages, and SO_2, NOx, and particulate matter are the three major pollutants with highest damages; (3) the damages caused per unit of particulate, NOx, and SO_2 emissions are much higher than pollution treatment and prevention costs. The research results of this project showed that China needs to have a more effective levy system on SO_2, and a more manageable electricity tariff mechanism to internalize the environmental externalities. The results have also implications for pollution control strategies, compensation schemes as well as emission trading arrangements.展开更多
With maturing deregulated environment for electricity market, cost of transmission congestion becomes a major issue for power system operation. Uniform Marginal Price and Locational Marginal Price (LMP) are the two pr...With maturing deregulated environment for electricity market, cost of transmission congestion becomes a major issue for power system operation. Uniform Marginal Price and Locational Marginal Price (LMP) are the two practical pricing schemes on energy pricing and congestion cost allocation, which are based on different mechanisms. In this paper, these two pricing schemes are introduced in detail respectively. Also, the modified IEEE-14-bus system is used as a test system to calculate the allocated congestion cost by using these two pricing schemes.展开更多
Decarbonisation of power systems is essential for realising carbon neutrality,in which the economic cost caused by carbon needs to be qualified.Based on the formulation of locational marginal price(LMP),this paper pro...Decarbonisation of power systems is essential for realising carbon neutrality,in which the economic cost caused by carbon needs to be qualified.Based on the formulation of locational marginal price(LMP),this paper proposes a locational marginal electricity-carbon price(EC-LMP)model to reveal carbon-related costs caused by power consumers.A carbon-priceintegrated optimal power flow(C-OPF)is then developed to maximise economic efficiency of the power system considering the costs of electricity and carbon.Case studies are presented to demonstrate the new formulation and results demonstrate the efficacy of the EC-LMP-based C-OPF on decarbonisation and economy.展开更多
Under perfect competition,marginal pricing results in short-term efficiency and the subsequent right short-term price signals.However,the main reason for the adoption of marginal pricing is not the above,but investmen...Under perfect competition,marginal pricing results in short-term efficiency and the subsequent right short-term price signals.However,the main reason for the adoption of marginal pricing is not the above,but investment cost recovery.That is,the fact that the profits obtained by infra-marginal technologies(technologies whose production cost is below the marginal price)allow them just to recover their investment costs.On the other hand,if the perfect competition assumption is removed,investment over-recovery or under-recovery generally occurs for infra-marginal technologies.展开更多
文摘By developing a GDMOD model to estimate the environmental externalities associated with electricity generation, this project provides a detailed analysis of the damages and costs caused by different pollutants at varying distances from the Mawan Electricity Plant in Shenzhen, China. The major findings of this study can be summarized that (1) environmental damages caused by electricity production are large and are mainly imposed on regions far away from the electricity plant; (2) air pollution is the most significant contributor to the total damages, and SO_2, NOx, and particulate matter are the three major pollutants with highest damages; (3) the damages caused per unit of particulate, NOx, and SO_2 emissions are much higher than pollution treatment and prevention costs. The research results of this project showed that China needs to have a more effective levy system on SO_2, and a more manageable electricity tariff mechanism to internalize the environmental externalities. The results have also implications for pollution control strategies, compensation schemes as well as emission trading arrangements.
文摘With maturing deregulated environment for electricity market, cost of transmission congestion becomes a major issue for power system operation. Uniform Marginal Price and Locational Marginal Price (LMP) are the two practical pricing schemes on energy pricing and congestion cost allocation, which are based on different mechanisms. In this paper, these two pricing schemes are introduced in detail respectively. Also, the modified IEEE-14-bus system is used as a test system to calculate the allocated congestion cost by using these two pricing schemes.
基金supported by the National Natural Science Foundation of China(U2166211).
文摘Decarbonisation of power systems is essential for realising carbon neutrality,in which the economic cost caused by carbon needs to be qualified.Based on the formulation of locational marginal price(LMP),this paper proposes a locational marginal electricity-carbon price(EC-LMP)model to reveal carbon-related costs caused by power consumers.A carbon-priceintegrated optimal power flow(C-OPF)is then developed to maximise economic efficiency of the power system considering the costs of electricity and carbon.Case studies are presented to demonstrate the new formulation and results demonstrate the efficacy of the EC-LMP-based C-OPF on decarbonisation and economy.
文摘Under perfect competition,marginal pricing results in short-term efficiency and the subsequent right short-term price signals.However,the main reason for the adoption of marginal pricing is not the above,but investment cost recovery.That is,the fact that the profits obtained by infra-marginal technologies(technologies whose production cost is below the marginal price)allow them just to recover their investment costs.On the other hand,if the perfect competition assumption is removed,investment over-recovery or under-recovery generally occurs for infra-marginal technologies.