Traditional optimal operation of hydropower station usually has two problems. One is that the optimal algorithm hasn’t high efficiency, and the other is that the optimal operation model pays little attention to ecolo...Traditional optimal operation of hydropower station usually has two problems. One is that the optimal algorithm hasn’t high efficiency, and the other is that the optimal operation model pays little attention to ecology. And with the development of electric power market, the generated benefit is concerned instead of generated energy. Based on the analysis of time-varying electricity price policy, an optimal operation model of hydropower station reservoir with ecology consideration is established. The model takes the maximum annual power generation benefit, the maximum output of the minimal output stage in the year and the minimum shortage of eco-environment demand as the objectives, and reservoir water quantity balance, reservoir storage capacity, reservoir discharge flow and hydropower station output and nonnegative variable as the constraints. To solve the optimal model, a chaotic optimization genetic algorithm which combines the ergodicity of chaos and the inversion property of genetic algorithm is exploited. An example is given, which shows that the proposed model and algorithm are scientific and feasible to deal with the optimal operation of hydropower station.展开更多
Aiming at the problem that traditional optimal operation of hydropower reservoir pays little attention to ecology, an optimal operation model of multi-objective hydropower reservoir with ecology consideration is estab...Aiming at the problem that traditional optimal operation of hydropower reservoir pays little attention to ecology, an optimal operation model of multi-objective hydropower reservoir with ecology consideration is established which combines the ecology and power generation. The model takes the maximum annual power generation benefit, the maximum output of the minimal output stage in the year and the minimum shortage of ecological water demand as objectives, and water quantity balance of reservoir, reservoir storage, discharge flow, output and so on as constraints. Chaotic genetic arithmetic is developed to solve the optimal model. An example is studied, showing that the annual generation of the proposed model is 8 million kW?h less than that model without ecology consideration, which is about 0.28 percent. But the proposed model is in favor of river ecology protection, and can promote the sustainable utilization of water resources. So it is worthy and necessary for the optimal operation of hydropower reservoir with ecology consideration.展开更多
The paper presents a two-stage approach to cope with the long-term optimal operation of cascaded hydropower systems. This approach combines progressive optimality algorithm (POA) with quadratic programming (QP) to imp...The paper presents a two-stage approach to cope with the long-term optimal operation of cascaded hydropower systems. This approach combines progressive optimality algorithm (POA) with quadratic programming (QP) to improve the optimization results. POA is used at the first stage to generate a local optimal result, which will be selected as the initial feasible solution of QP method employed at the second stage. Around the initial solution, a rational local search range for QP method is then determined, where the nonlinear water level function and tailrace level function can be linearized nearly with high accuracy. The simplified optimization problem is formulated as a QP model with a quadratic generation function and a linear set of constraints, and solved using the available mathematic optimization software package. Simulation is performed on the long term operation of Hongshui River hydropower system which is located in southwest China and consists of 9 built hydropower plants. Results obtained from the proposed approach show a significant increase in the total energy production compared to the results from POA.展开更多
文摘Traditional optimal operation of hydropower station usually has two problems. One is that the optimal algorithm hasn’t high efficiency, and the other is that the optimal operation model pays little attention to ecology. And with the development of electric power market, the generated benefit is concerned instead of generated energy. Based on the analysis of time-varying electricity price policy, an optimal operation model of hydropower station reservoir with ecology consideration is established. The model takes the maximum annual power generation benefit, the maximum output of the minimal output stage in the year and the minimum shortage of eco-environment demand as the objectives, and reservoir water quantity balance, reservoir storage capacity, reservoir discharge flow and hydropower station output and nonnegative variable as the constraints. To solve the optimal model, a chaotic optimization genetic algorithm which combines the ergodicity of chaos and the inversion property of genetic algorithm is exploited. An example is given, which shows that the proposed model and algorithm are scientific and feasible to deal with the optimal operation of hydropower station.
文摘Aiming at the problem that traditional optimal operation of hydropower reservoir pays little attention to ecology, an optimal operation model of multi-objective hydropower reservoir with ecology consideration is established which combines the ecology and power generation. The model takes the maximum annual power generation benefit, the maximum output of the minimal output stage in the year and the minimum shortage of ecological water demand as objectives, and water quantity balance of reservoir, reservoir storage, discharge flow, output and so on as constraints. Chaotic genetic arithmetic is developed to solve the optimal model. An example is studied, showing that the annual generation of the proposed model is 8 million kW?h less than that model without ecology consideration, which is about 0.28 percent. But the proposed model is in favor of river ecology protection, and can promote the sustainable utilization of water resources. So it is worthy and necessary for the optimal operation of hydropower reservoir with ecology consideration.
文摘The paper presents a two-stage approach to cope with the long-term optimal operation of cascaded hydropower systems. This approach combines progressive optimality algorithm (POA) with quadratic programming (QP) to improve the optimization results. POA is used at the first stage to generate a local optimal result, which will be selected as the initial feasible solution of QP method employed at the second stage. Around the initial solution, a rational local search range for QP method is then determined, where the nonlinear water level function and tailrace level function can be linearized nearly with high accuracy. The simplified optimization problem is formulated as a QP model with a quadratic generation function and a linear set of constraints, and solved using the available mathematic optimization software package. Simulation is performed on the long term operation of Hongshui River hydropower system which is located in southwest China and consists of 9 built hydropower plants. Results obtained from the proposed approach show a significant increase in the total energy production compared to the results from POA.