Decarbonization of the power sector in China is an essential aspect of the energy transition process to achieve carbon neutrality.The power sector accounts for approximately 40%of China’s total CO_(2) emissions.Accor...Decarbonization of the power sector in China is an essential aspect of the energy transition process to achieve carbon neutrality.The power sector accounts for approximately 40%of China’s total CO_(2) emissions.Accordingly,collaborative optimization in power generation expansion planning(GEP)simultaneously considering economic,environmental,and technological concerns as carbon emissions is necessary.This paper proposes a collaborative mixedinteger linear programming optimization approach for GEP.This minimizes the power system’s operating cost to resolve emission concerns considering energy development strategies,flexible generation,and resource limitations constraints.This research further analyzes the advantages and disadvantages of current GEP techniques.Results show that the main determinants of new investment decisions are carbon emissions,reserve margins,resource availability,fuel consumption,and fuel price.The proposed optimization method is simulated and validated based on China’s power system data.Finally,this study provides policy recommendations on the flexible management of traditional power sources,the market-oriented mechanism of new energy sources,and the integration of new technology to support the attainment of carbon-neutral targets in the current energy transition process.展开更多
Different planning methods have been applied in private and public infrastructure projects, which resulted in different approval procedures and querry about impartiality. However, planning methods of infrastructure pr...Different planning methods have been applied in private and public infrastructure projects, which resulted in different approval procedures and querry about impartiality. However, planning methods of infrastructure projects are seldom investigated up to now. The authors propose a proper project planning method which is applicable to all kinds of infrastructure projects with various funedorigins. The project planning method includes a comprehensive planning frame- work and a six-step planning process. The financial indicator, i. e. , self-reimbursement ratio is introduced for the proper division of financial obligation between government and project company.展开更多
In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of pr...In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM + and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.展开更多
The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, ...The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, discrete investment costs, various operating conditions are considered in the model. The model is a mixed-integer linear programming formulation for a static TEP in the competitive environment. The presented methodology is applied to six-node system. In order to point out efficiency of the model the results obtained are compared with traditional problem solution.展开更多
The"Ninth Five-Year Plan for theNational Economy and SocialDevelopment and the Long-TermTarget by the Year 2010" adopted at theFourth Session of the Eighth National People’sCongress have opened up a vast ne...The"Ninth Five-Year Plan for theNational Economy and SocialDevelopment and the Long-TermTarget by the Year 2010" adopted at theFourth Session of the Eighth National People’sCongress have opened up a vast new worldfor the development of China’s food industry.The food industry should seize the opportunityto strengthen itself and speed up itsdevelopment for meeting the needs ofimproving the people’s living standards andperform well in modernized socialistconstruction.展开更多
This paper expounds the existent problems in the method and parameter of economic evaluation on construction project, which distributed by the State Planning Commission. By using technical economics principles, the au...This paper expounds the existent problems in the method and parameter of economic evaluation on construction project, which distributed by the State Planning Commission. By using technical economics principles, the author analyzes the problems and finds out the reasonable, simple, practical methods to solve the mutually exclusive schemes problems.展开更多
基金supported by the Natural Science Foundation of Shandong Province (No.ZR2019MEE078)Education and Teaching Reform Research Project of Shandong University (“Development of an experiment platform to support the intelligent energy courses”)。
文摘Decarbonization of the power sector in China is an essential aspect of the energy transition process to achieve carbon neutrality.The power sector accounts for approximately 40%of China’s total CO_(2) emissions.Accordingly,collaborative optimization in power generation expansion planning(GEP)simultaneously considering economic,environmental,and technological concerns as carbon emissions is necessary.This paper proposes a collaborative mixedinteger linear programming optimization approach for GEP.This minimizes the power system’s operating cost to resolve emission concerns considering energy development strategies,flexible generation,and resource limitations constraints.This research further analyzes the advantages and disadvantages of current GEP techniques.Results show that the main determinants of new investment decisions are carbon emissions,reserve margins,resource availability,fuel consumption,and fuel price.The proposed optimization method is simulated and validated based on China’s power system data.Finally,this study provides policy recommendations on the flexible management of traditional power sources,the market-oriented mechanism of new energy sources,and the integration of new technology to support the attainment of carbon-neutral targets in the current energy transition process.
基金Science Foundation of Jimei University(No.ZQ2007027)Youth Talent Program of Department of Science and Technology of Fujian Province(No.2008F3072)
文摘Different planning methods have been applied in private and public infrastructure projects, which resulted in different approval procedures and querry about impartiality. However, planning methods of infrastructure projects are seldom investigated up to now. The authors propose a proper project planning method which is applicable to all kinds of infrastructure projects with various funedorigins. The project planning method includes a comprehensive planning frame- work and a six-step planning process. The financial indicator, i. e. , self-reimbursement ratio is introduced for the proper division of financial obligation between government and project company.
文摘In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM + and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.
文摘The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, discrete investment costs, various operating conditions are considered in the model. The model is a mixed-integer linear programming formulation for a static TEP in the competitive environment. The presented methodology is applied to six-node system. In order to point out efficiency of the model the results obtained are compared with traditional problem solution.
文摘The"Ninth Five-Year Plan for theNational Economy and SocialDevelopment and the Long-TermTarget by the Year 2010" adopted at theFourth Session of the Eighth National People’sCongress have opened up a vast new worldfor the development of China’s food industry.The food industry should seize the opportunityto strengthen itself and speed up itsdevelopment for meeting the needs ofimproving the people’s living standards andperform well in modernized socialistconstruction.
文摘This paper expounds the existent problems in the method and parameter of economic evaluation on construction project, which distributed by the State Planning Commission. By using technical economics principles, the author analyzes the problems and finds out the reasonable, simple, practical methods to solve the mutually exclusive schemes problems.