Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses durin...Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses during pile work are to be thought possible. Prior to finishing a site pre-investigation, a foundation’s area is usually sampled for statistical reasons. There are studies on pile construction outside of Bangladesh that are supported by relevant empirical data in the literature. Since Bangladesh, which is regarded as a third-world country, is ignored in this regard, the literature currently available about pile building and the associated productivity loss is unable to provide adequate information or appropriate empirical data. Due to this pile-building sector in Bangladesh has been experiencing a decline in production for quite some time now. Before attempting to increase productivity in pile construction, it is essential to investigate the potential losses and the variables that might have an influence. This study aims to accomplish the following objectives: 1) identify the primary factors that have an impact on pile construction;2) develop an SVR model that accurately predicts productivity loss;and 3) figure out the projected loss by basing it on the historical scenario that is the most comparable to the current one. A Support Vector Regression (SVR) model was developed after a study of the relevant literature. This model enabled the collection of 110 pile building projects from five significant locations in Bangladesh. The model was constructed using a list of eight inputs in addition to a list of five macro elements (labor, management, environment, material, and equipment) (soil condition, pile type, pile material, project size, project location, pile depth, pile quantity, and equipment quantity). Using 10-way cross validation, the SVR achieves an accuracy of 87.2% in its predictions. On the basis of what has occurred in the past, we are able to estimate that there will be a loss of around 18.55 percent of the total output. A new perspective for engineers studying the delay factors with productivity loss is provided by the outcome of important tasks as it relates to loss in productivity and overall factors faced. In the building construction industry, effective management should place more emphasis on the correlation between productivity loss and the factors that cause it. Therefore, to represent the effect on productivity loss, real factors can be summed up as a decline in productivity loss. The findings of the study would urge specialists to concentrate on waste as a means of increasing overall production.展开更多
It needs the foundation of system and the guarantee of organizational system for anti-corruption,but it is more necessary to build and form an effective anti-corruption mechanism,so that the anti-corruption can be rea...It needs the foundation of system and the guarantee of organizational system for anti-corruption,but it is more necessary to build and form an effective anti-corruption mechanism,so that the anti-corruption can be really put into practice. Anti-corruption mechanism refers to a organic operation system of the interaction,interconnection and constraint between the constituent elements( parts) and elements of national anti-corruption,and as a system,anti-corruption mechanism should have the characteristics of system aticness,comprehensiveness,transparency,legalization,public participation,scientific dynam ic,and internationalism. The construction of deepening anti-corruption mechanism is the need for reconstructing the ruling legitimacy of the party and the governm ent. Adhering to the principle of treating both root causes and symptoms is necessary in the construction of anti-corruption m echanism,com bating and punishing corruption is an important part of anti-corruption,and the prevention and control of corruption is the basic project of anti-corruption. Therefore,the construction of prevention and control mechanism in the anti-corruption mechanism has a more far-reaching significance.展开更多
Each possible pair of residues inβ-1,4 glucanase for disulfide formation was assessed using online websites,and four pairs L28C-S256C,Q41C-P278C,S122C-N163C and A184C-A215C were selected.Accordingly,four recombinant ...Each possible pair of residues inβ-1,4 glucanase for disulfide formation was assessed using online websites,and four pairs L28C-S256C,Q41C-P278C,S122C-N163C and A184C-A215C were selected.Accordingly,four recombinant plasmids pET28a(+)EccslH28,pET28a(+)EccslH41,pET28a(+)EccslH122 and pET28a(+)EccslH184 were prepared and transformed into E.coli to express the recombinant enzymes.Then analysis on enzymatic properties showed that T50 of the recombinant enzymes was increased from 10 min for EccslHt2 to 90 min for EccslH28 and 40 min for EccslH41 at 70℃,while their optimum pH value and pH stability were not affected,which proved that the introduction of disulfide bond improved the thermal stability ofβ-1,4 glucanase.展开更多
The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two altern...The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.展开更多
Despite the great progress of rural socioeconomic development in the 11 th Five-year Plan period (2006-2010), China's agriculture and countryside are still.lacing the challenges of a crude development pattern, back...Despite the great progress of rural socioeconomic development in the 11 th Five-year Plan period (2006-2010), China's agriculture and countryside are still.lacing the challenges of a crude development pattern, backward rural development and cities' weak driving effect on the countryside. In the 12th Five-year Plan period (20I 1-2015), China should transform the way agriculture grows and operates; promote rural socioeconomic development; improve urban planning and its functions, institutional innovation, and urban/rural integration to lay a solid foundation for building an all-round well- off society.展开更多
文摘Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses during pile work are to be thought possible. Prior to finishing a site pre-investigation, a foundation’s area is usually sampled for statistical reasons. There are studies on pile construction outside of Bangladesh that are supported by relevant empirical data in the literature. Since Bangladesh, which is regarded as a third-world country, is ignored in this regard, the literature currently available about pile building and the associated productivity loss is unable to provide adequate information or appropriate empirical data. Due to this pile-building sector in Bangladesh has been experiencing a decline in production for quite some time now. Before attempting to increase productivity in pile construction, it is essential to investigate the potential losses and the variables that might have an influence. This study aims to accomplish the following objectives: 1) identify the primary factors that have an impact on pile construction;2) develop an SVR model that accurately predicts productivity loss;and 3) figure out the projected loss by basing it on the historical scenario that is the most comparable to the current one. A Support Vector Regression (SVR) model was developed after a study of the relevant literature. This model enabled the collection of 110 pile building projects from five significant locations in Bangladesh. The model was constructed using a list of eight inputs in addition to a list of five macro elements (labor, management, environment, material, and equipment) (soil condition, pile type, pile material, project size, project location, pile depth, pile quantity, and equipment quantity). Using 10-way cross validation, the SVR achieves an accuracy of 87.2% in its predictions. On the basis of what has occurred in the past, we are able to estimate that there will be a loss of around 18.55 percent of the total output. A new perspective for engineers studying the delay factors with productivity loss is provided by the outcome of important tasks as it relates to loss in productivity and overall factors faced. In the building construction industry, effective management should place more emphasis on the correlation between productivity loss and the factors that cause it. Therefore, to represent the effect on productivity loss, real factors can be summed up as a decline in productivity loss. The findings of the study would urge specialists to concentrate on waste as a means of increasing overall production.
文摘It needs the foundation of system and the guarantee of organizational system for anti-corruption,but it is more necessary to build and form an effective anti-corruption mechanism,so that the anti-corruption can be really put into practice. Anti-corruption mechanism refers to a organic operation system of the interaction,interconnection and constraint between the constituent elements( parts) and elements of national anti-corruption,and as a system,anti-corruption mechanism should have the characteristics of system aticness,comprehensiveness,transparency,legalization,public participation,scientific dynam ic,and internationalism. The construction of deepening anti-corruption mechanism is the need for reconstructing the ruling legitimacy of the party and the governm ent. Adhering to the principle of treating both root causes and symptoms is necessary in the construction of anti-corruption m echanism,com bating and punishing corruption is an important part of anti-corruption,and the prevention and control of corruption is the basic project of anti-corruption. Therefore,the construction of prevention and control mechanism in the anti-corruption mechanism has a more far-reaching significance.
基金Supported by the National Key Research and Development Plan of China(2019YFC1905902,2019YFC1905900)Key Research and Development Plan in Shandong Province(2020CXGC010603,2021ZDSYS10,2022CXGC020206)+2 种基金"Open Competition Mechanism"Project of Qilu University of Technology(Shandong Academy of Sciences)(2022JBZ01-06)Taishan Industry Leading Talent Program(tscy20180103)National Natural Science Foundation of China(31801527)。
文摘Each possible pair of residues inβ-1,4 glucanase for disulfide formation was assessed using online websites,and four pairs L28C-S256C,Q41C-P278C,S122C-N163C and A184C-A215C were selected.Accordingly,four recombinant plasmids pET28a(+)EccslH28,pET28a(+)EccslH41,pET28a(+)EccslH122 and pET28a(+)EccslH184 were prepared and transformed into E.coli to express the recombinant enzymes.Then analysis on enzymatic properties showed that T50 of the recombinant enzymes was increased from 10 min for EccslHt2 to 90 min for EccslH28 and 40 min for EccslH41 at 70℃,while their optimum pH value and pH stability were not affected,which proved that the introduction of disulfide bond improved the thermal stability ofβ-1,4 glucanase.
基金herein for allowing the use of various data from the LBJ Project in the development of this paper
文摘The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.
文摘Despite the great progress of rural socioeconomic development in the 11 th Five-year Plan period (2006-2010), China's agriculture and countryside are still.lacing the challenges of a crude development pattern, backward rural development and cities' weak driving effect on the countryside. In the 12th Five-year Plan period (20I 1-2015), China should transform the way agriculture grows and operates; promote rural socioeconomic development; improve urban planning and its functions, institutional innovation, and urban/rural integration to lay a solid foundation for building an all-round well- off society.