To verify a vacuum breaker's feasibility,when a transformer substation chooses a vacuum circuit breaker,it takes two different actual operational ways to cut off a transformer.This paper,using the power system com...To verify a vacuum breaker's feasibility,when a transformer substation chooses a vacuum circuit breaker,it takes two different actual operational ways to cut off a transformer.This paper,using the power system computer aided design/electro magnetic transient in DC system(PSCAD/EMTDC)software,simulates the substation system and studies transient recovery voltage(TRV)caused by the two different ways which can cut off a with load transformer or a no-load transformer.Simulation and calculation results show that TRV indexes of the first way are much higher than that of the second one,and their TRV indexes are both in a permissible range.The breaker is proved to be available.Besides,this paper proves that paralleling resistance has a good effect when the indexes exceed the standard.The resistance value depends on specific circumstances.展开更多
The next generation of hearing aids may use tiny magnets that fit inside the ear. Researchersat a California company and an engineer at the University of Virginia are both developing systems that rely on magnets to co...The next generation of hearing aids may use tiny magnets that fit inside the ear. Researchersat a California company and an engineer at the University of Virginia are both developing systems that rely on magnets to convey sounds. Conventional hearing aids have three components:a microphone, an amplifier, and a speaker. The microphone picks up sounds and sends them to the am-展开更多
基金Graduate Scientific and Innovation Foundation of Shandong University of Science and Technology(No.YCA120108)
文摘To verify a vacuum breaker's feasibility,when a transformer substation chooses a vacuum circuit breaker,it takes two different actual operational ways to cut off a transformer.This paper,using the power system computer aided design/electro magnetic transient in DC system(PSCAD/EMTDC)software,simulates the substation system and studies transient recovery voltage(TRV)caused by the two different ways which can cut off a with load transformer or a no-load transformer.Simulation and calculation results show that TRV indexes of the first way are much higher than that of the second one,and their TRV indexes are both in a permissible range.The breaker is proved to be available.Besides,this paper proves that paralleling resistance has a good effect when the indexes exceed the standard.The resistance value depends on specific circumstances.
文摘The next generation of hearing aids may use tiny magnets that fit inside the ear. Researchersat a California company and an engineer at the University of Virginia are both developing systems that rely on magnets to convey sounds. Conventional hearing aids have three components:a microphone, an amplifier, and a speaker. The microphone picks up sounds and sends them to the am-